Southwestern Bell Telephone is ranked #26 out of 47 distillate fuel oil power plants in Missouri in terms of total annual net electricity generation.
Southwestern Bell Telephone is comprised of 7 generators and generated 21.0 MWh during the 3-month period between November 2024 to February 2025.
Plant Name | Southwestern Bell Telephone |
---|---|
Utility Name | AT&T |
Location | St. Louis city, MO |
Initial Operation Date | February 1992 |
Last Update | Feb 2025 |
Annual Generation | 71.0 MWh |
Annual Consumption | 792 MMBtu |
Ranked #11,634 out of 11,993 Power Plants Nationwide | |
Ranked #825 out of 1,269 Distillate Fuel Oil Power Plants Nationwide | |
Ranked #107 out of 123 Missouri Power Plants | |
Ranked #26 out of 47 Missouri Distillate Fuel Oil Power Plants | |
Fuel Types | Distillate Fuel Oil |
Previous Operator |
Southwestern Bell Telephone Co (2013 to 2019) AT&T (2020 to 2023) |
Map of Southwestern Bell Telephone
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Southwestern Bell Telephone.
Monthly Net Generation for Southwestern Bell Telephone
Southwestern Bell Telephone Details
Summary Information | |
---|---|
Plant Name | Southwestern Bell Telephone (54858) |
Plant Address | 801 Chestnut Ave, St. Louis, MO 63101 |
Utility | AT&T (22035) |
Latitude, Longitude | 38.62757, -90.19338 |
Generation Dates on File | Jan 2001 to Feb 2025 |
Initial Operation Date | February 1992 |
Annual Generation | 71.0 MWh |
Fuel Types | Distillate Fuel Oil |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | SERC |
Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
NAICS Code | Telecommunications (517) |
Sector | Commercial Non-CHP (4) |
Water Source | Municipality |
Ash Impoundment | No |
Transmission / Distribution Owner | Union Electric Co - (MO) (19436) MO |
Grid Voltage | 13.80 kV |
Energy Storage | No |
Generator E/G1 Details Standby February 1992
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 2 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 2 MW |
Winter Capacity | 2 MW |
Minimum Load | 0.7 MW |
Uprate/Derate Completed | No |
Status | Standby |
Synchronized To Transmission Grid | Yes |
First Operation Date | February 1992 |
---|---|
Combined Heat & Power | No |
Sector Name | Commercial Non-CHP (4) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator E/G2 Details Standby February 1992
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 2 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 2 MW |
Winter Capacity | 2 MW |
Minimum Load | 0.7 MW |
Uprate/Derate Completed | No |
Status | Standby |
Synchronized To Transmission Grid | Yes |
First Operation Date | February 1992 |
---|---|
Combined Heat & Power | No |
Sector Name | Commercial Non-CHP (4) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator E/G3 Details Standby February 1992
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 2 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 2 MW |
Winter Capacity | 2 MW |
Minimum Load | 0.7 MW |
Uprate/Derate Completed | No |
Status | Standby |
Synchronized To Transmission Grid | Yes |
First Operation Date | February 1992 |
---|---|
Combined Heat & Power | No |
Sector Name | Commercial Non-CHP (4) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator E/G4 Details Standby December 2005
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 2.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 2.8 MW |
Winter Capacity | 2.8 MW |
Minimum Load | 0.8 MW |
Uprate/Derate Completed | No |
Status | Standby |
Synchronized To Transmission Grid | Yes |
First Operation Date | December 2005 |
---|---|
Combined Heat & Power | No |
Sector Name | Commercial Non-CHP (4) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator E/G5 Details Standby January 2008
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 2.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 2.8 MW |
Winter Capacity | 2.8 MW |
Minimum Load | 0.8 MW |
Uprate/Derate Completed | No |
Status | Standby |
Synchronized To Transmission Grid | Yes |
First Operation Date | January 2008 |
---|---|
Combined Heat & Power | No |
Sector Name | Commercial Non-CHP (4) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator E/G6 Details Standby August 2011
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 2.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 2.8 MW |
Winter Capacity | 2.8 MW |
Minimum Load | 0.8 MW |
Uprate/Derate Completed | No |
Status | Standby |
Synchronized To Transmission Grid | Yes |
First Operation Date | August 2011 |
---|---|
Combined Heat & Power | No |
Sector Name | Commercial Non-CHP (4) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator E/G7 Details Standby August 2011
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 2.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 2.8 MW |
Winter Capacity | 2.8 MW |
Minimum Load | 0.8 MW |
Uprate/Derate Completed | No |
Status | Standby |
Synchronized To Transmission Grid | Yes |
First Operation Date | August 2011 |
---|---|
Combined Heat & Power | No |
Sector Name | Commercial Non-CHP (4) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Southwestern Bell Telephone Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Distillate Fuel Oil.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#815 | Ephrata PA BTM | Lancaster, PA | 75.0 MWh |
#816 | Wyandotte | Wyandotte, MI | 74.0 MWh |
#817 | Southwark | Philadelphia, PA | 73.0 MWh |
#818 | IMEA Flora | Flora, IL | 73.0 MWh |
#819 | St Marys | St. Marys, OH | 73.0 MWh |
#820 | Alliant SBD 9201 Norplex | Postville, IA | 72.5 MWh |
#821 | Vitro Architectural Glass (PA) | Carlisle, PA | 72.5 MWh |
#822 | Chappell | Chappell, NE | 72.0 MWh |
#823 | NCAH Central Utility Plant | Ames, IA | 11.4 GWh |
#824 | Beaver Island | Beaver Island, MI | 71.0 MWh |
#826 | Winterset | Winterset, IA | 115.0 MWh |
#827 | Benson City of | Benson, MN | 69.0 MWh |
#828 | Waterloo Lundquist | Waterloo, IA | 69.0 MWh |
#829 | MCRD Parris Island PV Hybrid | Parris Island, SC | 31.5 GWh |
#830 | Hartford Hospital Cogeneration | Hartford, CT | 43.8 GWh |
#831 | C D McIntosh Jr | Lakeland, FL | 2.1 TWh |
#832 | Luverne | Luverne, MN | 68.0 MWh |
#833 | Osceola Generating Station (FL) | St. Cloud, FL | 676.0 MWh |
#834 | Indian River Plant | Titusville, FL | 6.5 GWh |
#835 | Cornell University Central Heat | Ithaca, NY | 216.7 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Southwestern Bell Telephone.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
AES Belleville Solar LLC | Belleville, IL | 17.3 GWh | 13.7 mi |
Anheuser-Busch St Louis | St. Louis, MO | 41.6 GWh | 2.3 mi |
Baldwin Energy Complex | Baldwin, IL | 6.8 TWh | 34.5 mi |
Baldwin Solar BESS | IL | 19.1 GWh | 34.6 mi |
Edwardsville Solar II | Edwardsville, IL | 4.0 GWh | 16.7 mi |
Freeburg | Freeburg, IL | 230.0 MWh | 20.5 mi |
Granite City Works | Granite City, IL | 480.3 GWh | 6 mi |
Highland | Highland, IL | 105.0 MWh | 28.5 mi |
IKEA St. Louis 410 | St. Louis, MO | 339.0 MWh | 2.9 mi |
Meramec | St. Louis, MO | 165.0 GWh | 17.4 mi |
Milam Gas Recovery | East St. Lois, IL | 19.3 GWh | 4 mi |
O'Fallon Renewable Energy Center | O'Fallon, MO | 5.3 GWh | 29.5 mi |
Red Bud | Red Bud, IL | 123.0 MWh | 30.3 mi |
Renewable Energy Center at BJH | St Louis, MO | 1.4 GWh | 3.6 mi |
Rush Island | Festus, MO | 603.1 GWh | 34.5 mi |
SCS American Bottoms 009885 Sauget, LLC | Sauget, IL | 3.0 GWh | 2.5 mi |
Sioux | West Alton, MO | 3.7 TWh | 20.6 mi |
Trigen St. Louis | St Louis, MO | 89.1 GWh | 0.9 mi |
Venice | Venice, IL | 13.7 GWh | 2.7 mi |
Waterloo | Waterloo, IL | 462.0 MWh | 20.3 mi |