Southern Minnesota Beet Sugar
83550 Co. Road 21, Renville, MN 56284Plant Summary Information
Southern Minnesota Beet Sugar is ranked #7 out of 10 coal plants in Minnesota in terms of total annual net electricity generation.
Southern Minnesota Beet Sugar is comprised of 1 generator and generated 2.3 GWh during the 3-month period between May 2024 to August 2024.
Plant Name | Southern Minnesota Beet Sugar |
---|---|
Utility Name | Southern Minnesota Beet Sugar |
Location | Renville County, MN |
Initial Operation Date | September 1976 |
Last Update | Aug 2024 |
Annual Generation | 26.9 GWh |
Annual Consumption | 4.4 M MMBtu |
Ranked #4,672 out of 11,835 Power Plants Nationwide | |
Ranked #125 out of 132 Subbituminous Coal Power Plants Nationwide | |
Ranked #106 out of 736 Minnesota Power Plants | |
Ranked #7 out of 10 Minnesota Subbituminous Coal Power Plants | |
Fuel Types | Subbituminous Coal : 72.1% Natural Gas : 26.4% Residual Fuel Oil : 1.5% |
Map of Southern Minnesota Beet Sugar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Southern Minnesota Beet Sugar.
Monthly Net Generation for Southern Minnesota Beet Sugar
Southern Minnesota Beet Sugar Details
Summary Information | |
---|---|
Plant Name | Southern Minnesota Beet Sugar (54533) |
Plant Address | 83550 Co. Road 21, Renville, MN 56284 |
Utility | Southern Minnesota Beet Sugar (17604) |
Latitude, Longitude | 44.79641, -95.17979 |
Generation Dates on File | Jan 2001 to Aug 2024 |
Initial Operation Date | September 1976 |
Annual Generation | 26.9 GWh |
Fuel Types | Subbituminous Coal : 72.1% Natural Gas : 26.4% Residual Fuel Oil : 1.5% |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | MRO |
Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
NAICS Code | Food Manufacturing (311) |
Sector | Industrial CHP (7) |
Water Source | Well/Factory Water |
Ash Impoundment | No |
Transmission / Distribution Owner | Renville-Sibley Coop Pwr Assn (15845) MN |
Grid Voltage | 69.00 kV / 13.00 kV / 5.00 kV |
Energy Storage | No |
Natural Gas Information | |
Local Distribution Company (LDC) | GREAT PLAINS NATURAL GAS CO |
Natural Gas Storage | No |
Generator 0001 Details Operating September 1976
Technology | Conventional Steam Coal |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 7.5 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 7.5 MW |
Winter Capacity | 7.5 MW |
Minimum Load | 1.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | September 1976 |
Combined Heat & Power | Yes |
Sector Name | Industrial CHP (7) |
Topping Or Bottoming | B |
---|---|
Energy Source | Subbituminous Coal / Natural Gas |
Startup Source | Subbituminous Coal / Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Pulverized Coal Technology | Yes |
Other Combustion Technology | No |
Supercritical Technology | Yes |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | No |
Multifuel Details | |
Cofire Energy Source | SUB / NG |
---|
Southern Minnesota Beet Sugar Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Subbituminous Coal.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#112 | American Crystal Sugar Hillsboro | Hillsboro, ND | 91.8 GWh |
#113 | Eielson AFB Central Heat & Power Plant | Eielson AFB, AK | 86.9 GWh |
#114 | Biron Mill | Wisconsin Rapids, WI | 185.5 GWh |
#115 | University of Alaska Fairbanks | Fairbanks, AK | 68.9 GWh |
#116 | Utility Plants Section | Fort Wainwright, AK | 64.0 GWh |
#117 | Meramec | St. Louis, MO | 165.0 GWh |
#118 | Prairie Creek | Cedar Rapids, IA | 75.2 GWh |
#119 | American Crystal Sugar Crookston | Crookston, MN | 46.8 GWh |
#120 | American Crystal Sugar Drayton | Drayton, ND | 42.8 GWh |
#121 | American Crystal Sugar Moorhead | Moorhead, MN | 39.8 GWh |
#122 | Georgia-Pacific Muskogee | Muskogee, OK | 373.6 GWh |
#123 | American Crystal Sugar East Grand Forks | East Grand Forks, MN | 28.5 GWh |
#124 | Nippon Dynawave Packaging Longview WA | Longview, WA | 291.9 GWh |
#126 | Archer Daniels Midland Lincoln | Lincoln, NE | 9.0 GWh |
#127 | Archer Daniels Midland Mankato | Mankato, MN | 9.0 GWh |
#128 | M L Hibbard | Duluth, MN | 70.1 GWh |
#129 | Archer Daniels Midland Des Moines | Des Moines, IA | 6.1 GWh |
#130 | Western Sugar Cooperative - Billings | Billings, MT | 5.8 GWh |
#131 | Lake Road (MO) | St Joseph, MO | 47.7 GWh |
#132 | Hibbing | Hibbing, MN | 68.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Southern Minnesota Beet Sugar.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Allie L.L.C. | Renville, MN | 2.3 GWh | 1.2 mi |
Andresen Solar | Clara City, MN | 2.4 GWh | 13.5 mi |
Aster Community Solar Garden, LLC | Raymond, MN | 2.2 GWh | 14.8 mi |
Clara City Solar | Clara City, MN | 1.9 GWh | 13.3 mi |
Crater Community Solar | Granite Falls, MN | 5.3 GWh | 16.1 mi |
Geranium Solar, LLC | Raymond, MN | 2.3 GWh | 11.9 mi |
Kerria Solar, LLC | Renville, MN | 2.1 GWh | 1.1 mi |
Krause CSG | Renville, MN | 1.9 GWh | 1.5 mi |
Lantana Solar, LLC | Glenwood, MN | 2.2 GWh | 13.6 mi |
Novel Historical Society Solar CSG | Sacred Heart, MN | 1.7 GWh | 8.9 mi |
Novel Schroeder Solar LLC CSG | Renville, MN | 2.1 GWh | 1.4 mi |
Sacred Heart CSG1, LLC | Sacred Heart, MN | 2.3 GWh | 8.9 mi |
Sagitta Community Solar | Clara City, MN | 1.9 GWh | 14.6 mi |
Skalbeck Solar | Sacred Heart, MN | 2.5 GWh | 9.3 mi |
Syncarpha Clara City CSG I (Stamer) | Clara City, MN | 1.9 GWh | 14 mi |
Syncarpha Prinsburg CSG (Ledeboer) | Prinsburg, MN | 1.9 GWh | 9.4 mi |
USS Chariot Solar LLC | Danube, MN | 2.3 GWh | 4.2 mi |
USS Danube Solar LLC | Danube, MN | 2.4 GWh | 3.8 mi |
USS Pheasant Solar LLC CSG | Clara City, MN | 2.3 GWh | 10.2 mi |
USS Prokosch Solar LLC | Bird Island, MN | 2.3 GWh | 13.3 mi |