South Peak Wind
6200 South Peak Road, Geyser, MT 59447Plant Summary Information
South Peak Wind is ranked #20 out of 68 power plants in Montana in terms of total annual net electricity generation.
South Peak Wind generated 93.9 GWh during the 3-month period between December 2023 to March 2024.
Plant Name | South Peak Wind |
---|---|
Utility Name | Allete Clean Energy |
Location | Judith Basin County, MT |
Initial Operation Date | April 2020 |
Last Update | Mar 2024 |
Annual Generation | 252.3 GWh |
Annual Consumption | 860.9 k MMBtu |
Ranked #2,069 out of 11,249 Power Plants Nationwide | |
Ranked #652 out of 1,329 Wind Power Plants Nationwide | |
Ranked #20 out of 68 Montana Power Plants | |
Ranked #6 out of 21 Montana Wind Power Plants | |
Fuel Types | Wind |
Map of South Peak Wind
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for South Peak Wind.
Monthly Net Generation for South Peak Wind
South Peak Wind Details
Summary Information | |
---|---|
Plant Name | South Peak Wind (62939) |
Plant Address | 6200 South Peak Road Geyser, MT 59447 |
Utility | Allete Clean Energy (59496) |
Latitude, Longitude | 47.32991, -110.61459 |
Generation Dates on File | Apr 2020 to Mar 2024 |
Initial Operation Date | April 2020 |
Annual Generation | 252.3 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 18-669-000 |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | 19-170-000 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | NorthWestern Energy (NWMT) (NWMT) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | NorthWestern Energy LLC - (MT) (12825) MT |
Grid Voltage | 230.00 kV |
Energy Storage | No |
Generator 41001 Details Operating April 2020
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 80 MW |
Summer Capacity | 80 MW |
Winter Capacity | 80 MW |
Minimum Load | 1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | April 2020 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Wind |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Turbines/Hydrokinetic Buoys | 29 |
Multiple Fuels | No |
Turbine Details | |
Number Of Turbines | 29 |
---|---|
Predominant Turbine Manufacturer | GE |
Predominant Turbine Model Number | 2.82-127 |
Design Wind Speed | 18.9 MPH |
Wind Quality Class | 3 - Low Wind |
Turbine Hub Height Feet | 290 |
South Peak Wind Plant Owners
Owner Name | Address | Ownership |
---|---|---|
Great American West Wind, LLC | 30 W. Superior Street, Duluth, MN 55802 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#642 | Rockland Wind Farm | American Falls, ID | 257.5 GWh |
#643 | Juniper Canyon I Wind Project | Bickleton, WA | 256.4 GWh |
#644 | High Sheldon Wind Farm | Strykersville, NY | 256.4 GWh |
#645 | Apple Blossom Wind Farm | Pigeon, MI | 256.2 GWh |
#646 | Los Vientos Wind 1B | Sebastian, TX | 255.3 GWh |
#647 | Spring Canyon Expansion Wind Energy Ctr | Peetz, CO | 255.2 GWh |
#648 | Flat Water Wind Farm LLC | Du Bois, NE | 254.6 GWh |
#649 | New Harvest Wind Project LLC | Schleswig, IA | 253.3 GWh |
#650 | Sigel Wind Park | Harbor Beach, MI | 252.7 GWh |
#651 | Scurry County Wind II | Snyder, TX | 252.6 GWh |
#653 | Pioneer Wind Park, LLC | Glenrock, WY | 252.1 GWh |
#654 | Red Hills Wind Project LLC | Hammon, OK | 250.8 GWh |
#655 | Windthorst-2 | Archer, TX | 250.1 GWh |
#656 | Copenhagen Wind Farm | Copenhagen, NY | 248.9 GWh |
#657 | Spearville | Ford, KS | 248.4 GWh |
#658 | Pheasant Run Wind LLC | Pigeon, MI | 247.9 GWh |
#659 | Buffalo Gap Wind Farm | Merkel, TX | 247.3 GWh |
#660 | Arkwright Summit Wind Farm LLC | Fredonia, NY | 247.2 GWh |
#661 | Whitetail | Oilton, TX | 246.6 GWh |
#662 | Klondike Windpower II | Wasco, OR | 246.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding South Peak Wind.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Black Eagle | Great Falls, MT | 104.3 GWh | 33 mi |
Black Eagle Solar, LLC | Black Eagle, MT | 5.3 GWh | 33.4 mi |
Canyon Ferry | Helena, MT | 251.3 GWh | 70.5 mi |
Cochrane | Great Falls, MT | 234.4 GWh | 30.7 mi |
Fairfield Wind | Fairfield, MT | 32.5 GWh | 68.6 mi |
Gordon Butte Wind LLC | Martinsdale, MT | 82.3 GWh | 64.8 mi |
Great Divide Solar, LLC | Canyon Creek, MT | 6.3 GWh | 85 mi |
Green Meadow Solar, LLC | Helena, MT | 5.9 GWh | 81.2 mi |
Greenfield Wind - MT | Fairfield, MT | 101.4 GWh | 68.5 mi |
Hauser | Helena, MT | 135.4 GWh | 71.5 mi |
Holter | Wolf Creek, MT | 238.3 GWh | 69.4 mi |
Horseshoe Bend Wind Park | Great Falls, MT | 30.8 GWh | 40.3 mi |
Judith Gap Wind Energy Center | Harlowton, MT | 414.2 GWh | 66.3 mi |
Morony | Great Falls, MT | 242.8 GWh | 27.2 mi |
Rainbow (MT) | Great Falls, MT | 313.3 GWh | 31 mi |
Ryan | Great Falls, MT | 421.4 GWh | 29 mi |
Spion Kop Wind Farm | Geyser, MT | 133.7 GWh | 1.2 mi |
Tiber Dam Hydroelectric Plant | Chester, MT | 48.8 GWh | 71.9 mi |
Turnbull Hydro | Fairfield, MT | 31.2 GWh | 71.8 mi |
Two Dot Wind Farm | Two Dot, MT | 43.0 GWh | 65.7 mi |