Solar Star Palo Alto I, LLC
1501 Page Mill Road, Palo Alto, CA 94304Plant Summary Information
Solar Star Palo Alto I, LLC is ranked #621 out of 799 solar farms in California in terms of total annual net electricity generation.
Solar Star Palo Alto I, LLC generated 351.0 MWh during the 3-month period between September 2023 to December 2023.
Plant Name | Solar Star Palo Alto I, LLC |
---|---|
Utility Name | DG 1 Acquisition Co., LLC |
Location | Santa Clara County, CA |
Initial Operation Date | August 2019 |
Last Update | Dec 2023 |
Annual Generation | 2.1 GWh |
Annual Consumption | 7.5 k MMBtu |
Ranked #9,754 out of 11,835 Power Plants Nationwide | |
Ranked #4,501 out of 5,643 Solar Power Plants Nationwide | |
Ranked #1,348 out of 1,569 California Power Plants | |
Ranked #621 out of 799 California Solar Power Plants | |
Fuel Types | Solar |
Map of Solar Star Palo Alto I, LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Solar Star Palo Alto I, LLC.
Monthly Net Generation for Solar Star Palo Alto I, LLC
Solar Star Palo Alto I, LLC Details
Summary Information | |
---|---|
Plant Name | Solar Star Palo Alto I, LLC (62732) |
Plant Address | 1501 Page Mill Road, Palo Alto, CA 94304 |
Utility | DG 1 Acquisition Co., LLC (62648) |
Latitude, Longitude | 37.41101, -122.14886 |
Generation Dates on File | Aug 2019 to Dec 2023 |
Initial Operation Date | August 2019 |
Annual Generation | 2.1 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | City of Palo Alto - (CA) (14401) CA |
Grid Voltage | 13.70 kV |
Energy Storage | No |
Generator SSPAI Details Operating August 2019
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 1.3 MW |
Summer Capacity | 1.3 MW |
Winter Capacity | 1.3 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | August 2019 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 85 |
Tilt Angle | 10 |
DC Net Capacity | 1.5 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | Yes |
Virtual Net Metering DC Capacity | 1.5 MW |
Solar Star Palo Alto I, LLC Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#4491 | Grafton Solar | Grafton, MA | 2.1 GWh |
#4492 | Broadalbin-Perth Solar | Amsterdam, NY | 2.1 GWh |
#4493 | Schueler Community Solar | Annandale, MN | 2.1 GWh |
#4494 | USS Reindeer Solar LLC CSG | Sauk Rapids, MN | 2.1 GWh |
#4495 | Oberlin Spear Point Solar One | Oberlin, OH | 2.1 GWh |
#4496 | 435A Bergen Avenue | Kearney, NJ | 2.1 GWh |
#4497 | Primrose Solar, LLC | Mankato, MN | 2.1 GWh |
#4498 | Holtsville Solar Project | Holtsville, NY | 2.1 GWh |
#4499 | COU Solar I, LLC | Lisbon, NY | 2.1 GWh |
#4500 | USS Big Lake 1 Solar CSG | Big Lake, MN | 2.1 GWh |
#4502 | Greenwood Solar Farm | Avoca, MI | 2.1 GWh |
#4503 | Nunn | Apple Valley, CA | 2.1 GWh |
#4504 | Victor Mesa Linda B2 | Victorville, CA | 2.1 GWh |
#4505 | WHA Southbridge Solar Park CSG | Wilmington, DE | 2.1 GWh |
#4506 | Brookville Smart Bus Depot Microgrid | Silver Spring, MD | 2.2 GWh |
#4507 | ELP - Kipp | Hudson, NY | 2.1 GWh |
#4508 | USS Verbena Solar LLC | Stewart, MN | 2.1 GWh |
#4509 | USS Buckaroo Solar LLC CSG | Glydon, MN | 2.1 GWh |
#4510 | Novel Winegar Partnership Solar CSG | Waseca, MN | 2.1 GWh |
#4511 | Forrest City- Eldridge Road | Forrest City, AR | 2.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Solar Star Palo Alto I, LLC.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
AGT000 Stevens Creek Fuel Cell | Santa Clara, CA | 6.3 GWh | 10.2 mi |
APP Prune A-D | Cupertino, CA | 27.1 GWh | 9.5 mi |
Apple Campus 2 Fuel Cell | Cupertino, CA | 25.9 GWh | 9.5 mi |
Apple Campus 2 PV | Cupertino, CA | 15.6 GWh | 9.5 mi |
AT&T - Redwood City | Redwood City, CA | 7.0 GWh | 5.6 mi |
City of Palo Alto | Palo Alta, CA | 20.6 MWh | 2.9 mi |
Equinix Caspian Dr. Fuel Cell | Sunnyvale, CA | 35.9 GWh | 5.3 mi |
EQX011 Duane Fuel Cell | Santa Clara, CA | 20.6 GWh | 10.9 mi |
Gianera | Santa Clara, CA | 9.9 GWh | 9.9 mi |
Google Moffett Park Solar Project | Sunnyvale, CA | 2.7 GWh | 7.2 mi |
Intel Santa Clara | Santa Clara, CA | 7.3 GWh | 10.3 mi |
JSR000 N Mathilda Fuel Cell | Sunnyvale, CA | 8.8 GWh | 6.9 mi |
Juniper Networks Sunnyvale | Sunnyvale, CA | 5.6 GWh | 6.7 mi |
Mission College Blvd. Fuel Cell | Santa Clara, CA | 38.2 GWh | 10.4 mi |
Silicon Valley Clean Water | Redwood City, CA | 4.7 GWh | 10.2 mi |
SRI International Cogen Project | Menlo Park, CA | 26.5 GWh | 3.3 mi |
Stanford Campus Solar | Stanford, CA | 6.1 GWh | 1.7 mi |
Sunnyvale City of WPCP | Sunnyvale, CA | 9.7 GWh | 7.4 mi |
Yahoo! - HQ | Sunnyvale, CA | 4.1 GWh | 6.8 mi |
Zero Waste Energy Development Co LLC | San Jose, CA | 2.3 GWh | 10.9 mi |