Solar Star California II LLC
6200 Franklin Boulevard, Sacramento, CA 95824Plant Summary Information
Solar Star California II LLC is ranked #486 out of 799 solar farms in California in terms of total annual net electricity generation.
Solar Star California II LLC generated 529.0 MWh during the 3-month period between September 2023 to December 2023.
Plant Name | Solar Star California II LLC |
---|---|
Utility Name | Solar Star California II LLC |
Location | Sacramento County, CA |
Initial Operation Date | August 2012 |
Last Update | Dec 2023 |
Annual Generation | 3.5 GWh |
Annual Consumption | 12.4 k MMBtu |
Ranked #8,562 out of 11,835 Power Plants Nationwide | |
Ranked #3,482 out of 5,643 Solar Power Plants Nationwide | |
Ranked #1,190 out of 1,569 California Power Plants | |
Ranked #486 out of 799 California Solar Power Plants | |
Fuel Types | Solar |
Map of Solar Star California II LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Solar Star California II LLC.
Monthly Net Generation for Solar Star California II LLC
Solar Star California II LLC Details
Summary Information | |
---|---|
Plant Name | Solar Star California II LLC (57933) |
Plant Address | 6200 Franklin Boulevard, Sacramento, CA 95824 |
Utility | Solar Star California II LLC (58101) |
Latitude, Longitude | 38.51639, -121.47528 |
Generation Dates on File | Jul 2012 to Dec 2023 |
Initial Operation Date | August 2012 |
Annual Generation | 3.5 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 12-439 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | Balancing Authority of Northern California (BANC) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Sacramento Municipal Util Dist (16534) CA |
Grid Voltage | 21.00 kV |
Energy Storage | No |
Generator 1 Details Operating August 2012
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
RTO ISO LMP Node Designation | CALISO |
RTO ISO Location Designation For Reporting Wholesale Sales Data | CALISO |
Nameplate Capacity | 2 MW |
Summer Capacity | 2 MW |
Winter Capacity | 2 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | August 2012 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
DC Net Capacity | 2.3 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | Yes |
Net Metering DC Capacity | 2 MW |
Virtual Net Metering Agreement | No |
Solar Star California II LLC Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#3472 | Univ of California San Diego Solar | La Jolla, CA | 3.5 GWh |
#3473 | Panda Solar NC 8, LLC | Star, NC | 3.5 GWh |
#3474 | Kearsarge Montague BD(CSG) | Montague, MA | 3.3 GWh |
#3475 | Cronin Road Solar 1, LLC CSG Hybrid | Warren, MA | 3.5 GWh |
#3476 | Little Falls Solar | Little Falls, NY | 3.5 GWh |
#3477 | Apple Canyon Lake Solar | Apple River, IL | 3.5 GWh |
#3478 | Macys Goodyear | Goodyear, AZ | 3.5 GWh |
#3479 | Columbia University - Minisink | Minisink, NY | 3.5 GWh |
#3480 | CED Beecher Sun Solar | Beecher, IL | 3.5 GWh |
#3481 | Colton Solar | Molalla, OR | 3.5 GWh |
#3483 | Spooner Solar Array | Spooner, WI | 3.5 GWh |
#3484 | SCE-Snowline-White Road (North) | Phelan, CA | 3.5 GWh |
#3485 | Chambers 4 - Rialto LGB8 | Rialto, CA | 3.5 GWh |
#3486 | GELD Solar Farm | Groton, MA | 3.5 GWh |
#3487 | Xcel Adams 2 Community Solar Array | Watkins, CO | 3.5 GWh |
#3488 | Expressway Solar C2 | Victorville, CA | 3.5 GWh |
#3489 | Solar Photovoltaic Project #48 | Redlands, CA | 3.5 GWh |
#3490 | Friendship II | West Friendship, MD | 3.5 GWh |
#3491 | Deer Creek PV | Marion, IN | 3.5 GWh |
#3492 | Mooseheart School Solar | Mooseheart, IL | 3.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Solar Star California II LLC.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Carson Ice-Gen Project | Sacramento, CA | 71.3 GWh | 4.9 mi |
Department of Justice | Sacramento, CA | 4.1 GWh | 2.6 mi |
Depot Park Solar System | Sacramento, CA | 2.4 GWh | 4.2 mi |
Dept of General Services -FTB | Sacramento, CA | 5.3 GWh | 7.9 mi |
FRV SI Transport Solar LP | Sacramento, CA | 1.3 GWh | 5 mi |
Grassland 3&4 Solar Project | Davis, CA | 1.6 GWh | 11.9 mi |
McClellan (CA) | Sacramento, CA | 2.5 GWh | 10.4 mi |
Rancho Cordova Medical Offices | Rancho Cordova, CA | 2.2 GWh | 10.8 mi |
RE Kammerer 1 LLC | Elk Grove, CA | 11.3 GWh | 11.6 mi |
RE Kammerer 2 LLC | Elk Grove, CA | 11.3 GWh | 11.6 mi |
RE Kammerer 3 LLC | Elk Grove, CA | 11.3 GWh | 11.6 mi |
Sacramento (SMUD) | Sacramento, CA | 2.1 GWh | 5 mi |
Sacramento Fairbain Water Treatment Plant | Sacramento, CA | 1.1 GWh | 4.1 mi |
Sacramento Point West Medical Offices | Sacramento, CA | 2.2 GWh | 6.1 mi |
Sacramento Regional County Sanitation PV | Elk Grove, CA | 7.4 GWh | 4.7 mi |
SCA Cogen 2 | Sacramento, CA | 598.8 GWh | 4.2 mi |
SMUD at Grundman | Elk Grove, CA | 24.2 GWh | 11 mi |
SPA Cogen 3 | Sacramento, CA | 632.0 GWh | 0.4 mi |
Strata Roof 1 | Sacramento, CA | 1.6 GWh | 8.9 mi |
US GSA - Sacramento | Sacramento, CA | 2.2 GWh | 7.2 mi |