Solar Star 1
15637 Avenue A, Rosamond, CA 93560Plant Summary Information
Solar Star 1 is ranked #12 out of 5,778 solar farms nationwide in terms of total annual net electricity generation.
Solar Star 1 generated 145.2 GWh during the 3-month period between November 2024 to February 2025.
Plant Name | Solar Star 1 |
---|---|
Utility Name | Solar Star California XIX, LLC |
Location | Kern County, CA |
Initial Operation Date | March 2014 |
Last Update | Feb 2025 |
Annual Generation | 886.1 GWh |
Annual Consumption | 3.2 M MMBtu |
Ranked #814 out of 11,993 Power Plants Nationwide | |
Ranked #12 out of 5,778 Solar Power Plants Nationwide | |
Ranked #39 out of 1,579 California Power Plants | |
Ranked #3 out of 808 California Solar Power Plants | |
Fuel Types | Solar |
Previous Operator |
MidAmerican Solar LLC (2013 to 2014) Solar Star California XIX, LLC (2015 to 2023) |
Map of Solar Star 1
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Solar Star 1.
Monthly Net Generation for Solar Star 1
Solar Star 1 Details
Summary Information | |
---|---|
Plant Name | Solar Star 1 (58388) |
Plant Address | 15637 Avenue A, Rosamond, CA 93560 |
Utility | Solar Star California XIX, LLC (59873) |
Latitude, Longitude | 34.8181, -118.4036 |
Generation Dates on File | Mar 2014 to Feb 2025 |
Initial Operation Date | March 2014 |
Annual Generation | 886.1 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
Grid Voltage | 230.00 kV |
Energy Storage | No |
Generator SS13 Details Operating October 2014
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 58.5 MW |
Summer Capacity | 57 MW |
Winter Capacity | 57 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | October 2014 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
DC Net Capacity | 73.3 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Generator SS15 Details Operating October 2014
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 15 MW |
Summer Capacity | 14.6 MW |
Winter Capacity | 14.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | October 2014 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
DC Net Capacity | 18.8 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Generator AVS1 Details Operating March 2014
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 39 MW |
Summer Capacity | 38 MW |
Winter Capacity | 38 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | March 2014 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
DC Net Capacity | 48.9 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Generator SS16 Details Operating April 2014
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 64.5 MW |
Summer Capacity | 62.9 MW |
Winter Capacity | 62.9 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | April 2014 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
DC Net Capacity | 80.8 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Generator SS12 Details Operating February 2015
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 54 MW |
Summer Capacity | 52.6 MW |
Winter Capacity | 52.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | February 2015 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
DC Net Capacity | 67.7 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Generator SS11 Details Operating June 2015
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 54 MW |
Summer Capacity | 52.6 MW |
Winter Capacity | 52.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 2015 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
DC Net Capacity | 67.7 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Generator SS14 Details Operating June 2015
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 33 MW |
Summer Capacity | 32.2 MW |
Winter Capacity | 32.2 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 2015 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
DC Net Capacity | 40.7 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Solar Star 1 Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#2 | Sonoran Solar Energy | Buckeye, AZ | 1.1 TWh |
#3 | Topaz Solar Farm | Santa Margarita, CA | 1.1 TWh |
#4 | Roadrunner, LLC Hybrid | McCamey, TX | 1.0 TWh |
#5 | Hecate Energy Frye Solar LLC | Kress, TX | 960.4 GWh |
#6 | Roseland Solar Project, LLC | Riesel, TX | 935.0 GWh |
#7 | 2W Permian Solar Project Hybrid | Andrews, TX | 925.6 GWh |
#8 | Eagle Shadow Mountain Solar Farm | Moapa River Indian Re, NV | 924.5 GWh |
#9 | Aktina Solar | El Campo, TX | 902.3 GWh |
#10 | Daggett 3 | Daggett, CA | 887.4 GWh |
#11 | Waco Solar | Mount Calm, TX | 893.1 GWh |
#13 | Solana Generating Station | Gila Bend, AZ | 824.2 GWh |
#14 | Juno Solar Project | Lamesa, TX | 793.6 GWh |
#15 | Prospero Solar | Andrews, TX | 757.6 GWh |
#16 | Arroyo Solar Energy Storage Hybrid | Pueblo Pintado, NM | 708.5 GWh |
#17 | Solar Star 2 | Rosamond, CA | 724.7 GWh |
#18 | Fox Squirrel Solar | Mt Sterling, OH | 710.8 GWh |
#19 | Slate Hybrid | Stratford, CA | 681.6 GWh |
#20 | Texas Solar Nova 1 | Spur, TX | 706.6 GWh |
#21 | Neptune Energy Center Hybrid | Boone, CO | 684.3 GWh |
#22 | Lumina Solar Project | Snyder, TX | 703.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Solar Star 1.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Alpine Solar | Lancaster, CA | 161.0 GWh | 6.1 mi |
AV Solar Ranch One | Lancaster, CA | 573.5 GWh | 2.9 mi |
Catalina Solar 2, LLC | Rosamond, CA | 45.0 GWh | 2.9 mi |
Chaparral Springs | Rosamond, CA | 446.4 GWh | 6 mi |
Estrella Solar & Storage | Lancaster, CA | 113.3 GWh | 5 mi |
Golden Field Solar III, LLC | Rosamond, CA | 538.2 GWh | 2.1 mi |
Golden Fields Solar I, LLC | Rosamond, CA | 142.6 GWh | 1.7 mi |
Kingbird A Solar LLC | Rosamond, CA | 56.2 GWh | 1.6 mi |
Kingbird B Solar, LLC | Rosamond, CA | 55.6 GWh | 2 mi |
North Rosamond Solar LLC | Rosamond, CA | 397.7 GWh | 3.3 mi |
Pacific Wind LLC | Rosamond, CA | 264.0 GWh | 5.3 mi |
Rabbitbrush Solar, LLC | Rosamond, CA | 256.0 GWh | 4.8 mi |
Raceway Solar & Storage | Lancaster, CA | 298.8 GWh | 6.9 mi |
RE Astoria | Rosamond, CA | 214.1 GWh | 3.6 mi |
RE Astoria 2 | Rosamond, CA | 153.0 GWh | 4.5 mi |
RE Garland A | Rosamond, CA | 47.9 GWh | 5.3 mi |
Solar Star 2 | Rosamond, CA | 724.7 GWh | 3.6 mi |
Solar Star California, XLI, LLC | Rosamond, CA | 150.6 GWh | 1.7 mi |
Valentine Solar, LLC | Rosamond, CA | 292.2 GWh | 6 mi |
Willow Spring Solar, LLC | Rosamond, CA | 238.7 GWh | 3.9 mi |