Solar Photovoltaic Project #26
2510 - 2580 West Walnut Ave., Rialto, CA 92376Plant Summary Information
Solar Photovoltaic Project #26 is ranked #423 out of 799 solar farms in California in terms of total annual net electricity generation.
Solar Photovoltaic Project #26 generated 949.0 MWh during the 3-month period between January 2023 to April 2023.
Plant Name | Solar Photovoltaic Project #26 |
---|---|
Utility Name | Southern California Edison Co |
Location | San Bernardino County, CA |
Initial Operation Date | February 2015 |
Last Update | Apr 2023 |
Annual Generation | 4.6 GWh |
Annual Consumption | 17.0 k MMBtu |
Ranked #7,830 out of 11,835 Power Plants Nationwide | |
Ranked #2,895 out of 5,643 Solar Power Plants Nationwide | |
Ranked #1,102 out of 1,569 California Power Plants | |
Ranked #423 out of 799 California Solar Power Plants | |
Fuel Types | Solar |
Map of Solar Photovoltaic Project #26
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Solar Photovoltaic Project #26.
Monthly Net Generation for Solar Photovoltaic Project #26
Solar Photovoltaic Project #26 Details
Summary Information | |
---|---|
Plant Name | Solar Photovoltaic Project #26 (57245) |
Plant Address | 2510 - 2580 West Walnut Ave., Rialto, CA 92376 |
Utility | Southern California Edison Co (17609) |
Latitude, Longitude | 34.13121, -117.42532 |
Generation Dates on File | Feb 2015 to Apr 2023 |
Initial Operation Date | February 2015 |
Annual Generation | 4.6 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
Grid Voltage | 12.00 kV |
Energy Storage | No |
Solar Photovoltaic Project #26 Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#2885 | Iron Horse Battery Storage Hybrid | Tucson, AZ | 4.6 GWh |
#2886 | Berkley East Solar LLC | Berkley, MA | 4.6 GWh |
#2887 | 1051 Lucky Solar, LLC | Hamptonville, NC | 4.6 GWh |
#2888 | Hanford 1 and 2 | Hanford, CA | 4.6 GWh |
#2889 | West A&B Solar Project Hybrid CSG | Southbridge, MA | 4.5 GWh |
#2890 | Waynesville Solar Farm (MO) | Waynesville, MO | 4.6 GWh |
#2891 | ESCA-LL-COLTON, LLC | Colton, CA | 4.6 GWh |
#2892 | Tedder Solar | Darlington, SC | 4.6 GWh |
#2893 | Wilkinson DeFore | Gordon, GA | 4.6 GWh |
#2894 | Warsaw Solar CSG | Morristown, MN | 4.6 GWh |
#2896 | Sheldon Solar | Sheldon Springs, VT | 4.6 GWh |
#2897 | Hampden | Hampden, MA | 4.6 GWh |
#2898 | Troup RC50 | Pine Mountain, GA | 4.6 GWh |
#2899 | AMP Napoleon Solar Facility | Napoleon, OH | 4.6 GWh |
#2900 | Millbury Solar | Millbury, MA | 4.6 GWh |
#2901 | Monroe Solar | Chatham, VA | 4.6 GWh |
#2902 | 1639 RT 29 Solar 2 | Gloversville, NY | 4.5 GWh |
#2903 | IL West Hallock Project1 | Edelstein, IL | 4.5 GWh |
#2904 | Chicopee Solar | Chicopee, MA | 4.5 GWh |
#2905 | Volney II | Fulton, NY | 4.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Solar Photovoltaic Project #26.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Cal State Univ San Bernardino FC01 | San Bernardino, CA | 7.5 GWh | 6.9 mi |
Century Generating Facility | Colton, CA | 651.0 MWh | 6.4 mi |
Chambers 4 - Rialto LGB8 | Rialto, CA | 3.5 GWh | 1.1 mi |
Colton Solar One, LLC | San Bernardino, CA | 2.3 GWh | 6.6 mi |
Drews Generating Facility | Colton, CA | 606.0 MWh | 6.4 mi |
Etiwanda | Rancho Cucamonga, CA | 16.7 GWh | 6.1 mi |
Fontana | Rialto, CA | 6.2 GWh | 2.3 mi |
Foundation IE | Rancho Cucamonga, CA | 391.0 MWh | 6.8 mi |
Grapeland Hybrid | Rancho Cucamonga, CA | 4.0 GWh | 6.8 mi |
IGS SBD1 | Bloomington, CA | 5.0 GWh | 6.8 mi |
IOS II-LAX9 | Fontana, CA | 7.5 GWh | 3.2 mi |
Niagara Bottling - Rialto | Rialto, CA | 7.9 GWh | 0.5 mi |
OES Biogas Power | San Bernardino, CA | 348.0 MWh | 5.4 mi |
Solar Photovoltaic Project #03 | Rialto, CA | 452.8 MWh | 2.9 mi |
Solar Photovoltaic Project #10 | Fontana, CA | 764.0 MWh | 6.5 mi |
Solar Photovoltaic Project #15 | Fontana, CA | 1.4 GWh | 6.3 mi |
Solar Photovoltaic Project #17 | Fontana, CA | 2.6 GWh | 6 mi |
Solar Photovoltaic Project #18 | Fontana, CA | 1.1 GWh | 6.2 mi |
Solar Photovoltaic Project #23 | Fontana, CA | 1.2 GWh | 6.5 mi |
Solar Photovoltaic Project #27 | Rialto, CA | 845.1 MWh | 0.2 mi |