Solar Photovoltaic Project #22
27223 Pioneer Ave., Redlands, CA 92374Plant Summary Information
Solar Photovoltaic Project #22 is ranked #790 out of 799 solar farms in California in terms of total annual net electricity generation.
Solar Photovoltaic Project #22 generated 8.0 MWh during the 3-month period between December 2022 to March 2023.
Plant Name | Solar Photovoltaic Project #22 |
---|---|
Utility Name | Southern California Edison Co |
Location | San Bernardino County, CA |
Initial Operation Date | August 2011 |
Last Update | Mar 2023 |
Annual Generation | 329.9 MWh |
Annual Consumption | 1.2 k MMBtu |
Ranked #11,163 out of 11,852 Power Plants Nationwide | |
Ranked #5,565 out of 5,655 Solar Power Plants Nationwide | |
Ranked #1,551 out of 1,570 California Power Plants | |
Ranked #790 out of 799 California Solar Power Plants | |
Fuel Types | Solar |
Map of Solar Photovoltaic Project #22
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Solar Photovoltaic Project #22.
Monthly Net Generation for Solar Photovoltaic Project #22
Solar Photovoltaic Project #22 Details
Summary Information | |
---|---|
Plant Name | Solar Photovoltaic Project #22 (57237) |
Plant Address | 27223 Pioneer Ave., Redlands, CA 92374 |
Utility | Southern California Edison Co (17609) |
Latitude, Longitude | 34.08, -117.2114 |
Generation Dates on File | Aug 2011 to Mar 2023 |
Initial Operation Date | August 2011 |
Annual Generation | 329.9 MWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
Grid Voltage | 12.00 kV |
Energy Storage | No |
Solar Photovoltaic Project #22 Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#5555 | Mercer Mall | Lawrenceville, NJ | 405.0 MWh |
#5556 | UASTP I | Tucson, AZ | 403.0 MWh |
#5557 | Biltmore Solar Fields | Asheville, NC | 385.0 MWh |
#5558 | Bowie State Solar | Bowie, MD | 362.0 MWh |
#5559 | Amazon MDW7 Solar Project | Monee, IL | 361.0 MWh |
#5560 | Double J Dairy Array | Visalia, CA | 354.0 MWh |
#5561 | Old Bridge Global Landfill CSG | Old Bridge, NJ | 353.0 MWh |
#5562 | POM Juice Solar | Fresno, CA | 352.0 MWh |
#5563 | Corkwood Solar (CSG) | Howland, ME | 344.0 MWh |
#5564 | Redwood Coast Airport Microgrid | McKinleyville, CA | 27.0 MWh |
#5566 | SolarClub 03 | Starbuck, MN | 327.0 MWh |
#5567 | Solops 371 Hoes LLC | Piscataway, NJ | 322.0 MWh |
#5568 | Bibb Williams | Macob, GA | 321.0 MWh |
#5569 | North Ninth Street | Rochelle, IL | 1.8 GWh |
#5570 | POM Plant 2 | Del Rey, CA | 292.0 MWh |
#5571 | Blue Elk IV Solar, LLC | Adrian, MI | 284.0 MWh |
#5572 | Hamlet Solar Energy Storage | Hamlet, NC | 252.0 MWh |
#5573 | Winona Garden | Altura, MN | 257.0 MWh |
#5574 | Wake RJ3 Solar Energy Storage | Wake Forest, NC | 234.9 MWh |
#5575 | Ruler Solar Partners (CSG) | Oswegatchie, NY | 245.0 MWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Solar Photovoltaic Project #22.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Amazon San Bernardino | San Bernardino, CA | 6.0 GWh | 2.1 mi |
Colton Solar One, LLC | San Bernardino, CA | 2.3 GWh | 6.3 mi |
Energy Center | Redlands, CA | 4.7 GWh | 3 mi |
IGS KSBD | Highland, CA | 9.0 GWh | 2.2 mi |
IGS SBD2 | San Bernardino, CA | 4.2 GWh | 4 mi |
Kohls San Bernardino Solar Facility | San Bernardino, CA | 1.0 GWh | 3.3 mi |
Loma Linda University Cogen | Loma Linda, CA | 55.1 GWh | 2.9 mi |
Mountainview Generating Station | Redlands, CA | 2.7 TWh | 1.7 mi |
Redlands Community Hospital | Redlands, CA | 9.1 GWh | 3 mi |
RPUWD Scheuer Well Solar Project | San Bernardino, CA | 4.8 GWh | 4.2 mi |
San Manuel Central Plant Cogens | Highland, CA | 26.5 GWh | 5 mi |
Santa Ana 3 | Highlands, CA | 424.0 MWh | 6.7 mi |
SB Water Reclamation Fuel Cell | San Bernardino, CA | 9.5 GWh | 4.4 mi |
Solar Photovoltaic Project #05 | Redlands, CA | 1.4 GWh | 1.2 mi |
Solar Photovoltaic Project #07 | Redlands, CA | 2.4 GWh | 1 mi |
Solar Photovoltaic Project #11 | Redlands, CA | 3.1 GWh | 1.7 mi |
Solar Photovoltaic Project #13 | Redlands, CA | 2.0 GWh | 1.4 mi |
Solar Photovoltaic Project #16 | Redlands, CA | 1.5 GWh | 1.3 mi |
Solar Photovoltaic Project #28 | San Bernardino, CA | 1.9 GWh | 3.7 mi |
Solar Photovoltaic Project #48 | Redlands, CA | 3.5 GWh | 1 mi |