Solar Photovoltaic Project #22
27223 Pioneer Ave., Redlands, CA 92374Plant Summary Information
Solar Photovoltaic Project #22 is ranked #736 out of 747 solar farms in California in terms of total annual net electricity generation.
Solar Photovoltaic Project #22 generated 107.6 MWh during the 3-month period between September 2022 to December 2022.
Plant Name | Solar Photovoltaic Project #22 |
---|---|
Utility Name | Southern California Edison Co |
Location | San Bernardino County, CA |
Initial Operation Date | August 2011 |
Last Update | Dec 2022 |
Annual Generation | 429.6 MWh |
Annual Consumption | 1.6 k MMBtu |
Ranked #10,548 out of 11,249 Power Plants Nationwide | |
Ranked #5,062 out of 5,158 Solar Power Plants Nationwide | |
Ranked #1,476 out of 1,501 California Power Plants | |
Ranked #736 out of 747 California Solar Power Plants | |
Fuel Types | Solar |
Map of Solar Photovoltaic Project #22
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Solar Photovoltaic Project #22.
Monthly Net Generation for Solar Photovoltaic Project #22
Solar Photovoltaic Project #22 Details
Summary Information | |
---|---|
Plant Name | Solar Photovoltaic Project #22 (57237) |
Plant Address | 27223 Pioneer Ave. Redlands, CA 92374 |
Utility | Southern California Edison Co (17609) |
Latitude, Longitude | 34.08, -117.2114 |
Generation Dates on File | Aug 2011 to Dec 2022 |
Initial Operation Date | August 2011 |
Annual Generation | 429.6 MWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
Grid Voltage | 12.00 kV |
Energy Storage | No |
Generator S022A Details Operating August 2011
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 0.5 MW |
Summer Capacity | 0.5 MW |
Winter Capacity | 0.5 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | August 2011 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Solar |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 10 |
DC Net Capacity | 0.8 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Generator S022B Details Operating August 2011
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 0.5 MW |
Summer Capacity | 0.5 MW |
Winter Capacity | 0.5 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | August 2011 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Solar |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 10 |
DC Net Capacity | 0.8 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Generator S022C Details Operating August 2011
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 0.5 MW |
Summer Capacity | 0.5 MW |
Winter Capacity | 0.5 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | August 2011 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Solar |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 10 |
DC Net Capacity | 0.8 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Generator S022D Details Operating August 2011
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 0.5 MW |
Summer Capacity | 0.5 MW |
Winter Capacity | 0.5 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | August 2011 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Solar |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 10 |
DC Net Capacity | 0.8 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Solar Photovoltaic Project #22 Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#5052 | Prosperity Energy Storage Facility Hybrid | Albuquerque, NM | 484.7 MWh |
#5053 | NY8 - Regan Solar | Mohawk, NY | 481.0 MWh |
#5054 | City of Boulder WWTP | Boulder, CO | 478.8 MWh |
#5055 | Skillman | Skillman, NJ | 473.6 MWh |
#5056 | Hawthorne Creek | TBD, FL | 470.0 MWh |
#5057 | Biltmore Solar Fields | Asheville, NC | 468.0 MWh |
#5058 | Shieldwall Solar | Littleton, NC | 448.0 MWh |
#5059 | MCCo Solar Generating Facility | Cleveland, OH | 448.0 MWh |
#5060 | BE Solar LLC | Atlanta, GA | 435.0 MWh |
#5061 | IKEA Joliet Rooftop PV System | Joliet, IL | 432.0 MWh |
#5063 | Novel Stein Solar LLC CSG | Taylors Falls, MN | 416.0 MWh |
#5064 | IL17021 Brush Creek I CSG | Freeport, IL | 413.0 MWh |
#5065 | SunEdison LV Sutton Plant Site | Wilmington, NC | 403.6 MWh |
#5066 | Big Bend Floating Solar I | Gibsonton, FL | 401.0 MWh |
#5067 | Wild Quail | Defuniak Springs, FL | 391.0 MWh |
#5068 | UASTP I | Tucson, AZ | 390.0 MWh |
#5069 | Dodge Renewables 1 | Dodge Center, MN | 389.0 MWh |
#5070 | UI RCP Bridgeport Seaside | Bridgeport, CT | 22.4 GWh |
#5071 | Snowden River CSG | Columbia, MD | 377.4 MWh |
#5072 | OYA Wayside Drive | Watertown, NY | 354.0 MWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Solar Photovoltaic Project #22.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Amazon San Bernardino | San Bernardino, CA | 6.6 GWh | 2.1 mi |
Colton Solar One, LLC | San Bernardino, CA | 4.9 GWh | 6.3 mi |
Crafton Hills College Solar Farm | Yucaipa, CA | 97.8 MWh | 6.9 mi |
Drews Generating Facility | Colton, CA | 865.7 MWh | 8.2 mi |
Energy Center | Redlands, CA | 5.1 GWh | 3 mi |
IGS KSBD | Highland, CA | 6.8 GWh | 2.2 mi |
Kohls San Bernardino Solar Facility | San Bernardino, CA | 1.7 GWh | 3.3 mi |
Loma Linda University Cogen | Loma Linda, CA | 48.5 GWh | 2.9 mi |
Mountainview Generating Station | Redlands, CA | 2.7 TWh | 1.7 mi |
Redlands Community Hospital | Redlands, CA | 9.3 GWh | 3 mi |
RPUWD Scheuer Well Solar Project | San Bernardino, CA | 6.3 GWh | 4.2 mi |
Santa Ana 3 | Highlands, CA | 1.9 GWh | 6.7 mi |
SB Water Reclamation Fuel Cell | San Bernardino, CA | 10.4 GWh | 4.4 mi |
Solar Photovoltaic Project #05 | Redlands, CA | 1.8 GWh | 1.2 mi |
Solar Photovoltaic Project #07 | Redlands, CA | 3.3 GWh | 1 mi |
Solar Photovoltaic Project #11 | Redlands, CA | 4.3 GWh | 1.7 mi |
Solar Photovoltaic Project #13 | Redlands, CA | 2.9 GWh | 1.4 mi |
Solar Photovoltaic Project #16 | Redlands, CA | 1.9 GWh | 1.3 mi |
Solar Photovoltaic Project #28 | San Bernardino, CA | 2.5 GWh | 3.7 mi |
Solar Photovoltaic Project #48 | Redlands, CA | 4.2 GWh | 1 mi |