Solar Photovoltaic Project #02
14701 Yorba Ave., Chino, CA 91710Plant Summary Information
Solar Photovoltaic Project #02 is ranked #720 out of 747 solar farms in California in terms of total annual net electricity generation.
Solar Photovoltaic Project #02 generated 190.0 MWh during the 3-month period between September 2022 to December 2022.
Plant Name | Solar Photovoltaic Project #02 |
---|---|
Utility Name | Southern California Edison Co |
Location | San Bernardino County, CA |
Initial Operation Date | December 2009 |
Last Update | Dec 2022 |
Annual Generation | 758.3 MWh |
Annual Consumption | 2.8 k MMBtu |
Ranked #10,387 out of 11,249 Power Plants Nationwide | |
Ranked #4,994 out of 5,158 Solar Power Plants Nationwide | |
Ranked #1,453 out of 1,501 California Power Plants | |
Ranked #720 out of 747 California Solar Power Plants | |
Fuel Types | Solar |
Map of Solar Photovoltaic Project #02
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Solar Photovoltaic Project #02.
Monthly Net Generation for Solar Photovoltaic Project #02
Solar Photovoltaic Project #02 Details
Summary Information | |
---|---|
Plant Name | Solar Photovoltaic Project #02 (56996) |
Plant Address | 14701 Yorba Ave. Chino, CA 91710 |
Utility | Southern California Edison Co (17609) |
Latitude, Longitude | 33.98524, -117.70083 |
Generation Dates on File | Nov 2009 to Dec 2022 |
Initial Operation Date | December 2009 |
Annual Generation | 758.3 MWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
Grid Voltage | 0.48 kV |
Energy Storage | No |
Generator S1A Details Operating December 2009
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 0.5 MW |
Summer Capacity | 0.5 MW |
Winter Capacity | 0.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 2009 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
DC Net Capacity | 0.6 MW |
Thin Film CDTE | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Generator S1B Details Operating December 2009
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 0.5 MW |
Summer Capacity | 0.5 MW |
Winter Capacity | 0.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 2009 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
DC Net Capacity | 0.6 MW |
Thin Film CDTE | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Solar Photovoltaic Project #02 Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#4984 | Solar Photovoltaic Project #09 | Ontario, CA | 798.1 MWh |
#4985 | IGS Solar I - BWI5 | Baltimore, MD | 792.5 MWh |
#4986 | ZPD-PT Solar Project 2017-044 LLC CSG | Spencer, MA | 790.5 MWh |
#4987 | Peru 3 | Peru, IN | 786.0 MWh |
#4988 | Lanesville Solar RES | Lanesville, IN | 784.0 MWh |
#4989 | IOS II-LAX9 | Fontana, CA | 782.1 MWh |
#4990 | MD - PR97 (CSG) | Bowie, MD | 778.0 MWh |
#4991 | North Kingstown Solar LLC | North Kingstown, RI | 775.0 MWh |
#4992 | Pivot Solar 1 LLC (CSG) | Parachute, CO | 771.0 MWh |
#4993 | USS Rosebud Solar LLC | Morgan, MN | 761.0 MWh |
#4995 | Richland | Columbus, GA | 755.0 MWh |
#4996 | Elk Hill Solar 1 | Mercersburg, PA | 748.0 MWh |
#4997 | Walkerton | Walkerton, IN | 742.0 MWh |
#4998 | Kohler Solar | Kohler, WI | 741.0 MWh |
#4999 | POM Beverage Solar | Del Rey, CA | 740.0 MWh |
#5000 | Merck | Elkton, VA | 738.2 MWh |
#5001 | William G Mennen Sports Solar | Morristown, NJ | 736.0 MWh |
#5002 | NY - PANYNJ - LaGuardia - Rooftop | Queens, NY | 732.0 MWh |
#5003 | Bakersfield 111 | Bakersfield, CA | 730.8 MWh |
#5004 | Redwood Coast Airport Microgrid | McKinleyville, CA | 416.0 MWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Solar Photovoltaic Project #02.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Brea Expansion Plant | Brea, CA | 269.6 GWh | 8.8 mi |
CA Institute for Women | Chino, CA | 2.7 GWh | 4.4 mi |
Clearwater Power Plant | Corona, CA | 18.2 GWh | 8.4 mi |
Gilead Sciences La Verne Rooftop Solar | La Verne, CA | 3.2 GWh | 9 mi |
Industry MetroLink PV 1 | Industry, CA | 1.7 GWh | 8.4 mi |
Kaiser Ontario | Ontario, CA | 6.5 GWh | 6.2 mi |
Mira Loma Peaker | Ontario, CA | 30.2 GWh | 8.2 mi |
OLS Energy Chino | Chino, CA | 12.5 GWh | 1.2 mi |
Oltmans SCE at Jurupa | Ontario, CA | 2.2 GWh | 7.5 mi |
PVN Milliken, LLC | Ontario, CA | 5.5 GWh | 8.6 mi |
San Antonio West Solar Rooftop | Chino, CA | 1.6 GWh | 2.8 mi |
Solar Photovoltaic Project #06 | Ontario, CA | 881.6 MWh | 8.3 mi |
Solar Photovoltaic Project #08 | Ontario, CA | 1.1 GWh | 8.7 mi |
Solar Photovoltaic Project #09 | Ontario, CA | 798.1 MWh | 8.4 mi |
Solar Photovoltaic Project #32 | Ontario, CA | 1.7 GWh | 8 mi |
Solar Photovoltaic Project #33 | Ontario, CA | 1.0 GWh | 8.2 mi |
Terra Francesco | Ontario, CA | 2.7 GWh | 6.6 mi |
Valley View | Yorba Linda, CA | 1.4 GWh | 9.4 mi |
Walnut Unified School District Walnut HS Hybrid | Walnut, CA | 1.9 GWh | 8.9 mi |
Yorba Linda | Yorba Linda, CA | 6.4 GWh | 8.5 mi |