Solar BESS Hybrid
1000 EMC PKWY, Marietta, GA 30060Plant Summary Information
Solar BESS Hybrid is ranked #116 out of 140 solar farms in Georgia in terms of total annual net electricity generation.
Solar BESS Hybrid generated 419.4 MWh during the 3-month period between September 2023 to December 2023.
Plant Name | Solar BESS Hybrid |
---|---|
Utility Name | Cobb Electric Membership Corporation |
Location | Cobb County, GA |
Initial Operation Date | October 2020 |
Last Update | Dec 2023 |
Annual Generation | 2.3 GWh |
Annual Consumption | 8.5 k MMBtu |
Ranked #9,596 out of 11,866 Power Plants Nationwide | |
Ranked #4,286 out of 5,672 Solar Power Plants Nationwide | |
Ranked #203 out of 240 Georgia Power Plants | |
Ranked #116 out of 140 Georgia Solar Power Plants | |
Fuel Types | Solar : 99.9% |
Map of Solar BESS Hybrid
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Solar BESS Hybrid.
Monthly Net Generation for Solar BESS Hybrid
Solar BESS Hybrid Details
Summary Information | |
---|---|
Plant Name | Solar BESS Hybrid (63535) |
Plant Address | 1000 EMC PKWY, Marietta, GA 30060 |
Utility | Cobb Electric Membership Corporation (63260) |
Latitude, Longitude | 33.97935, -84.55613 |
Generation Dates on File | Oct 2020 to Dec 2023 |
Initial Operation Date | October 2020 |
Annual Generation | 2.3 GWh |
Fuel Types | Solar : 99.9% |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | SERC |
Balancing Authority | Southern Company Services, Inc. - Trans (SOCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Georgia Transmission Corp (7197) |
Grid Voltage | 480.00 kV / 240.00 kV |
Energy Storage | Yes |
Natural Gas Information | |
Local Distribution Company (LDC) | Other - See pipeline notes. |
Natural Gas Storage | No |
Generator SOLAR Details Operating October 2020
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 1.5 MW |
Summer Capacity | 1.4 MW |
Winter Capacity | 1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | October 2020 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Solar Details | |
Dual Axis Tracking | Yes |
---|---|
Fixed Tilt | No |
East West Fixed Tilt | Yes |
DC Net Capacity | 1.8 MW |
Crystalline Silicon | Yes |
Virtual Net Metering Agreement | No |
Generator TEST Details Operating October 2020
Technology | Batteries |
---|---|
Prime Mover | Battery |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 1 MW |
Summer Capacity | 1 MW |
Winter Capacity | 1 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | October 2020 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Electricity used for energy storage |
Time From Cold Shutdown To Full Load | 1H |
Cofire Fuels | No |
Energy Storage Details | |
Nameplate Energy Capacity MWH | 4 |
---|---|
Maximum Charge Rate | 1 MW |
Maximum Discharge Rate | 1 MW |
Storage Technology | LIB |
Nameplate Reactive Power Rating | 1 |
Storage Enclosure Type | BL |
Arbitrage | Yes |
System Peak Shaving | P |
Backup Power | Yes |
Excess Wind And Solar Generation | Yes |
Independent | Yes |
Direct Support Of Another Unit | No |
Support T D Asset | No |
Generator NG Details Operating September 2022
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 1 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1 MW |
Winter Capacity | 1 MW |
Minimum Load | 0.3 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | September 2022 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Solar BESS Hybrid Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
Gas South | 3625 Cumberland Blvd SE, Atlanta, GA 30339 | Generator SOLAR | 100.00% |
Gas South | 3625 Cumberland Blvd SE, Atlanta, GA 30339 | Generator TEST | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#4276 | 20701 Plummer PV, LLC | Chatsworth, CA | 2.4 GWh |
#4277 | Villa Roma Rd #1 | Delaware, NY | 2.4 GWh |
#4278 | McCormick & Co. Inc. at Belcamp | Belcamp, MD | 2.4 GWh |
#4279 | Oregon University System OIT Klamath Falls | Klamath Falls, OR | 2.4 GWh |
#4280 | Wheeler Ridge | Bakersfield, CA | 2.4 GWh |
#4281 | SCE-Snowline-Duncan Road (South) | Phelan, CA | 2.4 GWh |
#4282 | ASA Volney NY Solar I LLC | Fulton, NY | 2.4 GWh |
#4283 | Niagara Depot Solar | Niagara Falls, NY | 2.4 GWh |
#4284 | Goya Foods, Inc- Secaucus Solar | Secaucus, NJ | 2.4 GWh |
#4285 | Whiskey Hill Solar | Walden, CO | 2.4 GWh |
#4287 | Depot Park Solar System | Sacramento, CA | 2.4 GWh |
#4288 | CMEEC - Norwich Stott St Solar Hybrid | Norwich, CT | 2.4 GWh |
#4289 | FedEx Woodbridge | Keasbey, NJ | 2.4 GWh |
#4290 | USS Rosebud Solar LLC | Morgan, MN | 2.4 GWh |
#4291 | USS Danube Solar LLC | Danube, MN | 2.4 GWh |
#4292 | Town of Ware - Canadian Tree(CSG) | Ware, MA | 2.4 GWh |
#4293 | Mashpee Landfill Solar | Mashpee, MA | 2.4 GWh |
#4294 | Solar Photovoltaic Project #07 | Redlands, CA | 2.4 GWh |
#4295 | Theodore Drive Community Solar | Westminster, MA | 2.4 GWh |
#4296 | Villa Roma Rd #3 CSG | Delaware, NY | 2.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Solar BESS Hybrid.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Allatoona | Cartersville, GA | 111.5 GWh | 16.1 mi |
Atlanta Falcons Solar | Atlanta, GA | 1.1 GWh | 17.9 mi |
Bartow Davidson | Cartersville, GA | 869.0 MWh | 24.8 mi |
Bowen | Cartersville, GA | 11.0 TWh | 23.3 mi |
Buford | Buford, GA | 166.2 GWh | 30.2 mi |
CNN Center | Atlanta, GA | 77.0 MWh | 17.8 mi |
Emory Decatur Hospital | Decatur, GA | 44.1 MWh | 20.3 mi |
Emory Hillandale Hospital | Lithonia, GA | 5.9 MWh | 30.1 mi |
Georgia LFG Richland Creek Plant | Buford, GA | 62.8 GWh | 31.6 mi |
Jack McDonough | Smyrna, GA | 18.2 TWh | 11.7 mi |
Laredo Bus Facility Solar Canopies | Decatur, GA | 117.0 MWh | 21.4 mi |
MAS ASB Cogen Plant | Atlanta, GA | 36.9 GWh | 24.3 mi |
Morgan Falls | Dunwoody, GA | 29.2 GWh | 9.9 mi |
Polk County GA S1, LLC | Cedartown, GA | 5.2 GWh | 37.9 mi |
Rockmart | Rockmart, GA | 5.5 GWh | 26.8 mi |
Sewell Creek Energy | Cedartown, GA | 425.2 GWh | 41.4 mi |
Sun Trust Plaza | Atlanta, GA | 29.0 MWh | 17.8 mi |
Tech Square Microgrid | Atlanta, GA | 1.4 GWh | 17 mi |
Turnipseed Solar, LLC | Douglasville, GA | 5.2 GWh | 20.6 mi |
Yates | Newnan, GA | 2.2 TWh | 40.8 mi |