Soboba Community Solar Project
24400 Soboba Road, San Jacinto, CA 92583Plant Summary Information
Soboba Community Solar Project is ranked #456 out of 747 solar farms in California in terms of total annual net electricity generation.
Soboba Community Solar Project generated 1.0 GWh during the 3-month period between September 2022 to December 2022.
Plant Name | Soboba Community Solar Project |
---|---|
Utility Name | Soboba Band of Luiseno Indians |
Location | Riverside County, CA |
Initial Operation Date | August 2016 |
Last Update | Dec 2022 |
Annual Generation | 4.0 GWh |
Annual Consumption | 14.4 k MMBtu |
Ranked #8,016 out of 11,249 Power Plants Nationwide | |
Ranked #3,041 out of 5,158 Solar Power Plants Nationwide | |
Ranked #1,124 out of 1,501 California Power Plants | |
Ranked #456 out of 747 California Solar Power Plants | |
Fuel Types | Solar |
Map of Soboba Community Solar Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Soboba Community Solar Project.
Monthly Net Generation for Soboba Community Solar Project
Soboba Community Solar Project Details
Summary Information | |
---|---|
Plant Name | Soboba Community Solar Project (61834) |
Plant Address | 24400 Soboba Road San Jacinto, CA 92583 |
Utility | Soboba Band of Luiseno Indians (61453) |
Latitude, Longitude | 33.76706, -116.90587 |
Generation Dates on File | Jan 2017 to Dec 2022 |
Initial Operation Date | August 2016 |
Annual Generation | 4.0 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | NA |
Ash Impoundment | No |
Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
Grid Voltage | 0.48 kV |
Energy Storage | No |
Generator SCSP1 Details Operating August 2016
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 1 MW |
Summer Capacity | 0.9 MW |
Winter Capacity | 0.8 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | August 2016 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Multiple Fuels | No |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 200 |
Tilt Angle | 25 |
DC Net Capacity | 1.3 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | Yes |
Virtual Net Metering DC Capacity | 1 MW |
Generator SCSP2 Details Operating June 2017
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 1 MW |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.8 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 2017 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Multiple Fuels | No |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 200 |
Tilt Angle | 25 |
DC Net Capacity | 1.3 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | Yes |
Virtual Net Metering DC Capacity | 1 MW |
Soboba Community Solar Project Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#3031 | Rockford CSG | Rockford, IL | 4.0 GWh |
#3032 | City of Bowie | Mitchellville, MD | 4.0 GWh |
#3033 | Charlemont A | Charlemont, MA | 4.0 GWh |
#3034 | Duke Building 98 | Indianapolis, IN | 4.0 GWh |
#3035 | Victor Mesa Linda D2 | Victorville, CA | 4.0 GWh |
#3036 | Waterford Holdco CSG | Waterford, MN | 4.0 GWh |
#3037 | Cedarville Road | Lena, IL | 4.0 GWh |
#3038 | Mendon | Mendon, MA | 4.0 GWh |
#3039 | Dover CSG | Dover Plains, NY | 4.0 GWh |
#3040 | Sun Harvest Solar NDP1 | Dos Palos, CA | 4.0 GWh |
#3042 | Kinston | Kinston, NC | 4.0 GWh |
#3043 | Rising Paper | Great Barrington, MA | 4.0 GWh |
#3044 | Syncarpha El Rito | El Rito, NM | 4.0 GWh |
#3045 | Ballenger Road Solar A | Inman, SC | 4.0 GWh |
#3046 | SSD Clackamas 4, LLC | Molalla, OR | 4.0 GWh |
#3047 | Sterling PV 3 | Sterling, CO | 4.0 GWh |
#3048 | Cottage Street Solar Facility | Springfield, MA | 4.0 GWh |
#3049 | Summer Solar A2 | Lancaster, CA | 3.9 GWh |
#3050 | CED Beecher Sun Solar | Beecher, IL | 3.9 GWh |
#3051 | East Wayne Solar LLC | Goldsboro, NC | 3.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Soboba Community Solar Project.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Amazon PSP1 | Beaumont, CA | 8.4 GWh | 12.1 mi |
AP North Lake I, LP | Hemet, CA | 32.4 GWh | 6.3 mi |
Cabazon Wind Partners | Cabazon, CA | 103.7 GWh | 14.3 mi |
Diamond Valley Lake | Winchester, CA | 3.2 GWh | 11.1 mi |
Diamond Valley Solar Project | Winchester, CA | 2.6 GWh | 10.3 mi |
EMWD - Moreno Valley RWRF | Moreno Valley, CA | 5.9 GWh | 19 mi |
EMWD - Perris Valley RWRF | Perris, CA | 8.9 GWh | 16.2 mi |
EMWD - San Jacinto RES BCT | San Jacinto, CA | 6.7 GWh | 7.2 mi |
EMWD - San Jacinto RWRF NEM | San Jacinto, CA | 3.2 GWh | 6.7 mi |
EMWD - Sun City RWRF | Menifee, CA | 4.0 GWh | 18.6 mi |
Foundation NWNA | Cabazon, CA | 23.1 GWh | 13.6 mi |
Foundation RRM | Cabazon, CA | 8.4 GWh | 11.6 mi |
GPS Cabazon Wind LLC | North Palm Springs, CA | 19.3 GWh | 15.2 mi |
Green Power I | North Palm Springs, CA | 605.4 MWh | 14.3 mi |
San Gorgonio Farms Wind Farm | Whitewater, CA | 66.1 GWh | 20 mi |
SunEdison Walgreens Moreno Valley | Moreno Valley, CA | 1.1 GWh | 19.9 mi |
Tahquitz High School | Hemet, CA | 1.7 GWh | 6.4 mi |
West Valley High School Solar | Hemet, CA | 1.5 GWh | 6.8 mi |
Whitewater Hill Wind Partners | North Palm Springs, CA | 142.7 GWh | 19.8 mi |
Whitewater Hydro Plant | California, CA | 400.0 MWh | 19.1 mi |