State Rd 210, Entry 4, Snowbird, UT 84092Plant Summary Information
Snowbird Power Plant is ranked #16 out of 23 natural gas power plants in Utah in terms of total annual net electricity generation.
Snowbird Power Plant is comprised of 3 generators and generated 15.0 GWh during the 3-month period between September 2022 to December 2022.
Plant Name | Snowbird Power Plant |
---|---|
Utility Name | Snowbird Corporation |
Location | Salt Lake County, UT |
Initial Operation Date | December 1986 |
Last Update | Dec 2022 |
Annual Generation | 15.0 GWh |
Annual Consumption | 121.8 k MMBtu |
Ranked #5,297 out of 11,249 Power Plants Nationwide | |
Ranked #1,473 out of 2,188 Natural Gas Power Plants Nationwide | |
Ranked #59 out of 113 Utah Power Plants | |
Ranked #16 out of 23 Utah Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Map of Snowbird Power Plant
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Snowbird Power Plant.
Monthly Net Generation for Snowbird Power Plant
Snowbird Power Plant Details
Summary Information | |
---|---|
Plant Name | Snowbird Power Plant (10215) |
Plant Address | State Rd 210, Entry 4 Snowbird, UT 84092 |
Utility | Snowbird Corporation (20712) |
Latitude, Longitude | 40.58337, -111.6539 |
Generation Dates on File | Jan 2001 to Dec 2022 |
Initial Operation Date | December 1986 |
Annual Generation | 15.0 GWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | Yes |
FERC Cogeneration Docket Number | 86-156-001 |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | PacifiCorp - East (PACE) |
NAICS Code | Accommodation (721) |
Sector | Commercial CHP (5) |
Water Source | SLC Mine Water |
Ash Impoundment | No |
Transmission / Distribution Owner | PacifiCorp (14354) UT |
Grid Voltage | 25.00 kV |
Energy Storage | No |
Natural Gas Information | |
Local Distribution Company (LDC) | QUESTAR GAS COMPANY |
Natural Gas Storage | No |
Generator 1138 Details Operating November 2022
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1.5 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.3 MW |
Winter Capacity | 1.3 MW |
Minimum Load | 0.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | November 2022 |
---|---|
Combined Heat & Power | Yes |
Sector Name | Commercial CHP (5) |
Topping Or Bottoming | T |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Generator 1258 Details Operating November 2022
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 2.5 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 2.1 MW |
Winter Capacity | 2.1 MW |
Minimum Load | 0.8 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | November 2022 |
Combined Heat & Power | Yes |
Sector Name | Commercial CHP (5) |
Topping Or Bottoming | T |
Energy Source | Natural Gas |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Generator 1260 Details Operating November 2022
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 2.5 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 2.1 MW |
Winter Capacity | 2.1 MW |
Minimum Load | 0.8 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | November 2022 |
Combined Heat & Power | Yes |
Sector Name | Commercial CHP (5) |
Topping Or Bottoming | T |
Energy Source | Natural Gas |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Snowbird Power Plant Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1463 | Smith College Central Heating Plant | Northampton, MA | 15.2 GWh |
#1464 | Hutchinson Plant #2 | Hutchinson, MN | 15.2 GWh |
#1465 | Apple Staten Island - Industrial Loop | Staten Island, NY | 15.2 GWh |
#1466 | Apple Staten Island - Winant Place | Staten Island, NY | 15.2 GWh |
#1467 | Nalco | Naperville, IL | 15.2 GWh |
#1468 | UI RCP Woodbridge FC | Woodbridge, CT | 15.2 GWh |
#1469 | Indeck Yerkes Energy Center | Tonawanda, NY | 15.2 GWh |
#1470 | Goose Haven Energy Center | Suisun, CA | 15.0 GWh |
#1471 | Brandon Station | Lubbock, TX | 15.0 GWh |
#1472 | Bradley Energy Center | Windsor Locks, CT | 15.0 GWh |
#1474 | Gowanus Gas Turbines Generating | Brooklyn, NY | 17.1 GWh |
#1475 | Haverhill North Cogeneration Facility | Franklin Furnace, OH | 349.6 GWh |
#1476 | Berry Placerita Cogen | Santa Clarita, CA | 14.8 GWh |
#1477 | Calhoun Energy Center | Eastaboga, AL | 25.2 GWh |
#1478 | Holcomb | Holcomb, KS | 1.5 TWh |
#1479 | Clifton | Clifton, KS | 14.6 GWh |
#1480 | Fuel Cell 3245 Yates Avenue | Bronx, NY | 14.6 GWh |
#1481 | One Patriot | Foxborough, MA | 14.5 GWh |
#1482 | Goal Line LP | Escondido, CA | 14.5 GWh |
#1483 | EQX003 Secaucus Rd Fuel Cell | Secaucus, NJ | 14.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Snowbird Power Plant.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Bountiful City | Bountiful, UT | 34.9 GWh | 24.2 mi |
BYU Central Heating Plant | Provo, UT | 124.6 GWh | 23.2 mi |
Deer Creek (UT) | Heber, UT | 19.2 GWh | 14 mi |
Gadsby | Salt Lake City, UT | 305.4 GWh | 19.3 mi |
Granite | Salt lake City, UT | 3.8 GWh | 7.2 mi |
Heber City | Heber City, UT | 24.7 GWh | 13.2 mi |
HTW Plant 303 COGEN | Salt Lake City, UT | 52.9 GWh | 15.8 mi |
Jordanelle Dam Hydroelectric Project | Heber, UT | 33.3 GWh | 12.1 mi |
Lake Creek Dam | Heber City, UT | 3.2 GWh | 19 mi |
Lake Side Power Plant | Vineyard, UT | 6.9 TWh | 18.2 mi |
Murray Turbine | Murray, UT | 21.7 GWh | 13.8 mi |
Provo Power Plant | Provo, UT | 7.8 GWh | 23.5 mi |
Salt Lake Energy Systems | Salt Lake City, UT | 26.8 GWh | 22.9 mi |
Salt Palace Solar Gen Plant | Salt Lake City, UT | 2.2 GWh | 17.9 mi |
Snake Creek | Midway, UT | 3.4 GWh | 8.4 mi |
Stairs | Salt Lake City, UT | 3.6 GWh | 5.9 mi |
Tesoro SLC Cogeneration Plant | Salt Lake City, UT | 164.4 GWh | 19.5 mi |
Trans-Jordan Generating Station | South Jordan, UT | 40.4 GWh | 21.6 mi |
Wanship | Wanship, UT | 6.5 GWh | 19.4 mi |
West Valley Generation Project | West Valley City, UT | 1.0 TWh | 20.6 mi |