Smoky Hills Wind Project Phase II

223 North Hwy 14, Lincoln, KS 67455

Plant Summary Information

Smoky Hills Wind Project Phase II is ranked #38 out of 145 power plants in Kansas in terms of total annual net electricity generation.

Smoky Hills Wind Project Phase II generated 155.6 GWh during the 3-month period between September 2022 to December 2022.

Plant NameSmoky Hills Wind Project Phase II
Utility NameSmoky Hills Wind Project II LLC
LocationLincoln County, KS
Initial Operation DateNovember 2008
Last Update Dec 2022
Annual Generation 534.5 GWh
Annual Consumption 2.1 M MMBtu
Ranked #1,296 out of 11,249 Power Plants Nationwide
Ranked #358 out of 1,329 Wind Power Plants Nationwide
Ranked #38 out of 145 Kansas Power Plants
Ranked #30 out of 49 Kansas Wind Power Plants
Fuel Types Wind

Map of Smoky Hills Wind Project Phase II

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Smoky Hills Wind Project Phase II.

Create Your Account Today

Monthly Net Generation for Smoky Hills Wind Project Phase II

Smoky Hills Wind Project Phase II Details

Summary Information
Plant NameSmoky Hills Wind Project Phase II (56985)
Plant Address223 North Hwy 14 Lincoln, KS 67455
UtilitySmoky Hills Wind Project II LLC (56285)
Latitude, Longitude38.89265, -98.16888
Generation Dates on FileJan 2009 to Dec 2022
Initial Operation DateNovember 2008
Annual Generation 534.5 GWh
Fuel Types Wind
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusNo
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusNon-Regulated
NERC RegionMRO
Balancing AuthoritySouthwest Power Pool (SWPP)
NAICS CodeUtilities (22)
Sector IPP Non-CHP (2)
Water Source
Ash Impoundment
Transmission / Distribution OwnerMidwest Energy Inc (12524) KS
Grid Voltage 230.00 kV
Energy StorageNo

Generator SMKII Details Operating November 2008

TechnologyOnshore Wind Turbine
Prime MoverWind Turbine, Onshore
OwnershipSingle Owner
Nameplate Capacity148.5 MW
Summer Capacity148.5 MW
Winter Capacity148.5 MW
Minimum Load0.1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2008
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceWind
Turbines/Hydrokinetic Buoys99
Turbine Details
Number Of Turbines99
Predominant Turbine ManufacturerGE
Predominant Turbine Model Number1.5 SE
Design Wind Speed24 MPH
Wind Quality Class1 - High Wind
Turbine Hub Height Feet264

Smoky Hills Wind Project Phase II Plant Owners

Owner NameAddressOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Wind.

RankPlant NamePlant LocationAnnual Generation
#348Adams WindLenox, IA550.6 GWh
#349Flat Ridge 3Zenda, KS548.2 GWh
#350Logan Wind EnergyPeetz, CO547.2 GWh
#351Papalote Creek I LLCTaft, TX544.8 GWh
#352Goldthwaite Wind Energy FacilityGoldthwaite, TX543.6 GWh
#353Cimarron Wind Energy LLCCimmaron, KS541.6 GWh
#354Papalote Creek II LLCTaft, TX538.4 GWh
#355Senate Wind LLCBryson, TX536.4 GWh
#356Desert SkyIraan, TX536.3 GWh
#357Minco Wind III, LLCMinco, OK536.3 GWh
#359Mesquite Creek WindLamesa, TX534.4 GWh
#360Deerfield Wind Energy, LLCKinde, MI532.0 GWh
#361DunlapMedicine Bow, WY530.1 GWh
#362FluvannaFluvanna, TX529.4 GWh
#363Ensign Wind LLCMontezuma, KS526.5 GWh
#364Cedro Hill Wind LLCBruni, TX523.2 GWh
#365La Chalupa, LLCRio Hondo, TX521.6 GWh
#366Ranchland Wind Project IICisco, TX519.3 GWh
#367GlenrockGlenrock, WY516.3 GWh
#368Ford County Wind Farm LLCFord County, IL513.1 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding Smoky Hills Wind Project Phase II.

Plant NamePlant LocationAnnual GenerationDistance
BeloitBeloit, KS291.8 MWh39.2 mi
Beloit Solar LLCBeloit, KS2.7 GWh38.7 mi
Cloud County Wind FarmConcordia, KS378.6 GWh46.3 mi
Diamond Vista Wind Project, LLCTampa, KS1.0 TWh64.9 mi
EllinwoodEllinwood, KS59.3 MWh43.4 mi
Goodman Energy CenterHays, KS105.2 GWh64.2 mi
HoisingtonHoisington, KS76.9 MWh41.9 mi
Hutchinson Energy CenterHutchinson, KS38.6 GWh57.7 mi
Kansas Ethanol, LLCLyons, KS114.3 GWh41.9 mi
LincolnLincoln, KS53.9 MWh10 mi
McPherson 2McPherson, KS15.7 GWh45 mi
McPherson 3McPherson, KS24.6 GWh46 mi
Minneapolis City ofMinneapolis, KS116.6 MWh29.3 mi
OsborneOsborne, KS40.7 MWh47.1 mi
Post Rock Wind Power Project, LLCEllsworth, KS476.7 GWh7.9 mi
Russell DowntownRussell, KS115.1 MWh37 mi
Russell Energy CenterRussell, KS2.4 GWh36.1 mi
Smoky Hills Wind Project Phase ILincoln, KS348.7 GWh1 mi
SterlingSterling, KS82.1 MWh46.9 mi
Westar Cities SolarHutchinson, KS2.5 GWh61.2 mi