Smoky Hills Wind Project Phase II
223 North Hwy 14, Lincoln, KS 67455Plant Summary Information
Smoky Hills Wind Project Phase II is ranked #41 out of 152 power plants in Kansas in terms of total annual net electricity generation.
Smoky Hills Wind Project Phase II generated 139.1 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Smoky Hills Wind Project Phase II |
---|---|
Utility Name | Smoky Hills Wind Project II LLC |
Location | Lincoln County, KS |
Initial Operation Date | November 2008 |
Last Update | Dec 2023 |
Annual Generation | 437.7 GWh |
Annual Consumption | 1.6 M MMBtu |
Ranked #1,409 out of 11,852 Power Plants Nationwide | |
Ranked #389 out of 1,345 Wind Power Plants Nationwide | |
Ranked #41 out of 152 Kansas Power Plants | |
Ranked #33 out of 49 Kansas Wind Power Plants | |
Fuel Types | Wind |
Map of Smoky Hills Wind Project Phase II
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Smoky Hills Wind Project Phase II.
Monthly Net Generation for Smoky Hills Wind Project Phase II
Smoky Hills Wind Project Phase II Details
Summary Information | |
---|---|
Plant Name | Smoky Hills Wind Project Phase II (56985) |
Plant Address | 223 North Hwy 14, Lincoln, KS 67455 |
Utility | Smoky Hills Wind Project II LLC (56285) |
Latitude, Longitude | 38.89265, -98.16888 |
Generation Dates on File | Jan 2009 to Dec 2023 |
Initial Operation Date | November 2008 |
Annual Generation | 437.7 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | MRO |
Balancing Authority | Southwest Power Pool (SWPP) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Midwest Energy Inc (12524) KS |
Grid Voltage | 230.00 kV |
Energy Storage | No |
Generator SMKII Details Operating January 2009
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
Nameplate Capacity | 148.5 MW |
Summer Capacity | 148.5 MW |
Winter Capacity | 148.5 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | January 2009 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Wind |
Turbines/Hydrokinetic Buoys | 99 |
Turbine Details | |
Number Of Turbines | 99 |
---|---|
Predominant Turbine Manufacturer | GE |
Predominant Turbine Model Number | 1.5 SE |
Design Wind Speed | 24 MPH |
Wind Quality Class | 1 - High Wind |
Turbine Hub Height Feet | 264 |
Smoky Hills Wind Project Phase II Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#379 | Buffalo Ridge Wind | Lake Benton, MN | 451.7 GWh |
#380 | Los Vientos Windpower III | Rio Grande City, TX | 451.3 GWh |
#381 | Cedro Hill Wind LLC | Bruni, TX | 451.1 GWh |
#382 | White Creek Wind Farm | Roosevelt, WA | 446.8 GWh |
#383 | La Chalupa, LLC | Rio Hondo, TX | 445.4 GWh |
#384 | Papalote Creek II LLC | Taft, TX | 444.4 GWh |
#385 | Glen Ullin Energy Center | Glen Ullin, ND | 443.0 GWh |
#386 | Wellsburg Wind Project | Wellsburg, IA | 441.8 GWh |
#387 | Glass Sands Wind Facility | Sulphur, OK | 440.2 GWh |
#388 | Adams Wind | Lenox, IA | 440.1 GWh |
#390 | Bishop Hill III | Cambridge, IL | 435.3 GWh |
#391 | Pioneer Trail Wind Farm, LLC | Paxton, IL | 433.8 GWh |
#392 | Sunflower Wind Project | Mandan, ND | 433.2 GWh |
#393 | Dunlap | Medicine Bow, WY | 432.0 GWh |
#394 | Shiloh Wind Project 2 LLC | Birds Landing, CA | 431.7 GWh |
#395 | Lake Benton II | Ruthton, MN | 431.4 GWh |
#396 | Laurel Wind Farm | Laurel, IA | 431.3 GWh |
#397 | Wildhorse Mountain Wind Facility | Clayton, OK | 430.1 GWh |
#398 | Gunsight Mountain Wind Energy LLC | Big Spring, TX | 429.5 GWh |
#399 | Sweetwater Wind 2 LLC | Sweetwater, TX | 429.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Smoky Hills Wind Project Phase II.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Beloit | Beloit, KS | 114.0 MWh | 39.2 mi |
Beloit Solar LLC | Beloit, KS | 4.7 GWh | 38.7 mi |
Cloud County Wind Farm | Concordia, KS | 336.3 GWh | 46.3 mi |
Diamond Vista Wind Project, LLC | Tampa, KS | 982.0 GWh | 57.7 mi |
Ellinwood | Ellinwood, KS | 48.0 MWh | 43.4 mi |
Great Bend - Sunflower | Great Bend, KS | 32.0 GWh | 50.4 mi |
Hoisington | Hoisington, KS | 62.0 MWh | 41.9 mi |
Hutchinson Energy Center | Hutchinson, KS | 24.9 GWh | 57.7 mi |
Kansas Ethanol, LLC | Lyons, KS | 113.4 GWh | 41.9 mi |
Lincoln | Lincoln, KS | 16.0 MWh | 10 mi |
McPherson 2 | McPherson, KS | 37.8 GWh | 45 mi |
McPherson 3 | McPherson, KS | 15.5 GWh | 46 mi |
Minneapolis City of | Minneapolis, KS | 84.0 MWh | 29.3 mi |
Osborne | Osborne, KS | 7.8 MWh | 47.1 mi |
Post Rock Wind Power Project, LLC | Ellsworth, KS | 422.8 GWh | 7.9 mi |
Russell Downtown | Russell, KS | 78.0 MWh | 37 mi |
Russell Energy Center | Russell, KS | 2.4 GWh | 36.1 mi |
Smoky Hills Wind Project Phase I | Lincoln, KS | 272.0 GWh | 1 mi |
Sterling | Sterling, KS | 157.0 MWh | 46.9 mi |
Westar Cities Solar | Hutchinson, KS | 2.2 GWh | 61.2 mi |