Smoky Hills Wind Project Phase I
223 North Highway 14, Lincoln, KS 67455Plant Summary Information
Smoky Hills Wind Project Phase I is ranked #48 out of 145 power plants in Kansas in terms of total annual net electricity generation.
Smoky Hills Wind Project Phase I generated 101.4 GWh during the 3-month period between September 2022 to December 2022.
Plant Name | Smoky Hills Wind Project Phase I |
---|---|
Utility Name | Smoky Hills Wind Farm I LLC |
Location | Lincoln County, KS |
Initial Operation Date | January 2008 |
Last Update | Dec 2022 |
Annual Generation | 348.7 GWh |
Annual Consumption | 1.3 M MMBtu |
Ranked #1,741 out of 11,249 Power Plants Nationwide | |
Ranked #542 out of 1,329 Wind Power Plants Nationwide | |
Ranked #48 out of 145 Kansas Power Plants | |
Ranked #39 out of 49 Kansas Wind Power Plants | |
Fuel Types | Wind |
Map of Smoky Hills Wind Project Phase I
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Smoky Hills Wind Project Phase I.
Monthly Net Generation for Smoky Hills Wind Project Phase I
Smoky Hills Wind Project Phase I Details
Summary Information | |
---|---|
Plant Name | Smoky Hills Wind Project Phase I (56488) |
Plant Address | 223 North Highway 14 Lincoln, KS 67455 |
Utility | Smoky Hills Wind Farm I LLC (55886) |
Latitude, Longitude | 38.87994, -98.16016 |
Generation Dates on File | Jan 2008 to Dec 2022 |
Initial Operation Date | January 2008 |
Annual Generation | 348.7 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | 07-83-000 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | MRO |
Balancing Authority | Southwest Power Pool (SWPP) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Westar Energy Inc (22500) KS |
Grid Voltage | 230.00 kV |
Energy Storage | No |
Generator 1 Details Operating January 2008
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
Nameplate Capacity | 100.8 MW |
Summer Capacity | 100.8 MW |
Winter Capacity | 100.8 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | January 2008 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Wind |
Turbines/Hydrokinetic Buoys | 56 |
Turbine Details | |
Number Of Turbines | 56 |
---|---|
Predominant Turbine Manufacturer | Vestas |
Predominant Turbine Model Number | V80-1.8 |
Design Wind Speed | 24 MPH |
Wind Quality Class | 2 - Medium Wind |
Turbine Hub Height Feet | 328 |
Smoky Hills Wind Project Phase I Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#532 | Morning Light Wind Farm | Adair, IA | 355.9 GWh |
#533 | Prairie Winds ND1 | Minot, ND | 355.4 GWh |
#534 | Wapsipinicon Wind Project | Dexter, MN | 355.0 GWh |
#535 | FPL Energy Vansycle LLC (WA) | Touchet, WA | 354.1 GWh |
#536 | Bison 2 Wind Energy Center | New Salem, ND | 352.9 GWh |
#537 | Meadow Lake Wind Farm V LLC | Chalmers, IN | 351.1 GWh |
#538 | Bishop Hill II Wind Farm | Cambridge, IL | 350.5 GWh |
#539 | Palouse | Oakesdale, WA | 349.8 GWh |
#540 | Bison 3 Wind Energy Center | New Salem, ND | 349.5 GWh |
#541 | Turkey Track Wind Energy LLC | Blackwell, TX | 348.7 GWh |
#543 | Caprock Wind Farm | San Jon, NM | 348.4 GWh |
#544 | Post Wind Farm LP | Fluvanna, TX | 348.3 GWh |
#545 | Broken Bow Wind II, LLC | Broken Bow, NE | 346.0 GWh |
#546 | Baron Winds Farm | Cohocton, NY | 345.1 GWh |
#547 | Hopkins Ridge Wind | Dayton, WA | 344.9 GWh |
#548 | Stoneray Power Partners, LLC | Woodstock, MN | 341.9 GWh |
#549 | Marshall Wind Farm | Frankfort, KS | 341.1 GWh |
#550 | Little Elk Wind Project LLC | Cordell, OK | 339.6 GWh |
#551 | Keenan II Renewable Energy Co LLC | Woodward, OK | 336.1 GWh |
#552 | Prairie Breeze II | Elgin, NE | 335.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Smoky Hills Wind Project Phase I.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Beloit | Beloit, KS | 291.8 MWh | 40 mi |
Beloit Solar LLC | Beloit, KS | 2.7 GWh | 39.5 mi |
Cloud County Wind Farm | Concordia, KS | 378.6 GWh | 46.8 mi |
Diamond Vista Wind Project, LLC | Tampa, KS | 1.0 TWh | 64.1 mi |
Ellinwood | Ellinwood, KS | 59.3 MWh | 42.9 mi |
Goodman Energy Center | Hays, KS | 105.2 GWh | 64.7 mi |
Hoisington | Hoisington, KS | 76.9 MWh | 41.7 mi |
Hutchinson Energy Center | Hutchinson, KS | 38.6 GWh | 56.7 mi |
Kansas Ethanol, LLC | Lyons, KS | 114.3 GWh | 41.1 mi |
Lincoln | Lincoln, KS | 53.9 MWh | 10.9 mi |
McPherson 2 | McPherson, KS | 15.7 GWh | 44 mi |
McPherson 3 | McPherson, KS | 24.6 GWh | 45 mi |
Minneapolis City of | Minneapolis, KS | 116.6 MWh | 29.4 mi |
Osborne | Osborne, KS | 40.7 MWh | 48.1 mi |
Post Rock Wind Power Project, LLC | Ellsworth, KS | 476.7 GWh | 7.9 mi |
Russell Downtown | Russell, KS | 115.1 MWh | 37.5 mi |
Russell Energy Center | Russell, KS | 2.4 GWh | 36.6 mi |
Smoky Hills Wind Project Phase II | Lincoln, KS | 534.5 GWh | 1 mi |
Sterling | Sterling, KS | 82.1 MWh | 46.1 mi |
Westar Cities Solar | Hutchinson, KS | 2.5 GWh | 60.3 mi |