9900 S 4100 W, Milford, UT 84751Plant Summary Information
Smithfield 3 is ranked #49 out of 50 solar farms in Utah in terms of total annual net electricity generation.
Smithfield 3 generated 1.5 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Smithfield 3 |
---|---|
Utility Name | Greenbacker Renewable Energy Corporation |
Location | Beaver County, UT |
Initial Operation Date | July 2023 |
Last Update | Dec 2023 |
Annual Generation | 2.0 GWh |
Annual Consumption | 6.8 k MMBtu |
Ranked #9,892 out of 11,717 Power Plants Nationwide | |
Ranked #4,622 out of 5,541 Solar Power Plants Nationwide | |
Ranked #111 out of 119 Utah Power Plants | |
Ranked #49 out of 50 Utah Solar Power Plants | |
Fuel Types | Solar |
Map of Smithfield 3
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Smithfield 3.
Monthly Net Generation for Smithfield 3
Smithfield 3 Details
Summary Information | |
---|---|
Plant Name | Smithfield 3 (66147) |
Plant Address | 9900 S 4100 W Milford, UT 84751 |
Utility | Greenbacker Renewable Energy Corporation (60025) |
Latitude, Longitude | 38.2245, -113.10542 |
Generation Dates on File | Aug 2023 to Dec 2023 |
Initial Operation Date | July 2023 |
Annual Generation | 2.0 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | QF23-484-000 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | Western Area Power Administration - Rocky Mountain Region (WACM) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | PacifiCorp (14354) UT |
Grid Voltage | 12.50 kV |
Energy Storage | No |
Generator 801 Details Operating July 2023
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 2 MW |
Summer Capacity | 2 MW |
Winter Capacity | 2 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | July 2023 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Tilt Angle | 52 |
DC Net Capacity | 2.7 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Smithfield 3 Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#4612 | Novel MNDot Solar CSG | Afton, MN | 2.0 GWh |
#4613 | Trexlertown Solar Array North and South | Allentown, PA | 2.0 GWh |
#4614 | Aquarius Community Solar | Tracy, MN | 2.0 GWh |
#4615 | Golden Springs Building D | Santa Fe Springs, CA | 2.0 GWh |
#4616 | Lineage MS | Richland, MS | 2.0 GWh |
#4617 | Letchworth Solar Project | Gainesville, NY | 2.0 GWh |
#4618 | Elizabeth Seaport Bldg A Solar | Elizabeth, NJ | 2.0 GWh |
#4619 | USS Horne North Solar LLC CSG | Felton, MN | 2.0 GWh |
#4620 | Shakopee Met Council WTP | Shakopee, MN | 2.0 GWh |
#4621 | CSD 2 - Heritage High | Brentwood, CA | 2.0 GWh |
#4623 | SVEP Solar Project Company | Pownal, VT | 2.0 GWh |
#4624 | Butler Plaza | Gainesville, FL | 2.0 GWh |
#4625 | Curry Solar | Reidsville, GA | 2.0 GWh |
#4626 | Syncarpha Dodge 1 CSG | Dodge Center, MN | 2.0 GWh |
#4627 | USS Centerfield Solar CSG | Webster, MN | 2.0 GWh |
#4628 | Syncarpha Clara City CSG I (Stamer) | Clara City, MN | 2.0 GWh |
#4629 | Catalina Express | San Pedro, CA | 2.0 GWh |
#4630 | JB-Tobin 2 | La Grange, NY | 2.0 GWh |
#4631 | Clara City Solar | Clara City, MN | 2.0 GWh |
#4632 | Kroger La Habra | La Habra, CA | 2.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Smithfield 3.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Appaloosa Solar I | Cedar City, UT | 105.3 GWh | 26.6 mi |
Blue Mountain Biogas | Milford, UT | 1.9 GWh | 11 mi |
Blundell | Milford, UT | 275.6 GWh | 22.8 mi |
Buckhorn Solar Plant | Paragonah, UT | 6.1 GWh | 24.6 mi |
Cedar Valley Solar Plant | Cedar City, UT | 6.1 GWh | 28.8 mi |
Escalante Solar I, LLC | Milford, UT | 235.6 GWh | 21.1 mi |
Escalante Solar II, LLC | Milford, UT | 233.2 GWh | 19.5 mi |
Escalante Solar III, LLC | Milford, UT | 232.0 GWh | 19.9 mi |
Granite Peak Solar Plant | Milford, UT | 6.3 GWh | 13.8 mi |
Greenville Solar Plant | Milford, UT | 4.4 GWh | 20.2 mi |
Laho Solar Plant | Milford, UT | 6.4 GWh | 6 mi |
Milford 2 | Milford, UT | 6.8 GWh | 12.9 mi |
Milford Flat Solar Plant | Milford, UT | 6.4 GWh | 7 mi |
Milford Solar 1 | Milford, UT | 288.8 GWh | 19 mi |
Milford Wind Corridor I LLC | Milford, UT | 359.3 GWh | 23.4 mi |
Milford Wind Corridor Stage II LLC | Milford, UT | 172.4 GWh | 26.7 mi |
South Milford Solar Plant | Milford, UT | 7.3 GWh | 6.6 mi |
Thermo No 1 | Milford, UT | 60.5 GWh | 6.5 mi |
Three Peaks Power | Cedar City, UT | 176.0 GWh | 27.5 mi |
Utah Red Hills Renewable Energy Park | Parowan, UT | 212.6 GWh | 26 mi |