Silver State Solar Power South
E Primm Blvd, Primm Valley, NV 89019Plant Summary Information
Silver State Solar Power South is ranked #22 out of 5,643 solar farms nationwide in terms of total annual net electricity generation.
Silver State Solar Power South generated 211.5 GWh during the 3-month period between May 2024 to August 2024.
Plant Name | Silver State Solar Power South |
---|---|
Utility Name | Silver State Solar Power South, LLC |
Location | Clark County, NV |
Initial Operation Date | November 2015 |
Last Update | Aug 2024 |
Annual Generation | 647.5 GWh |
Annual Consumption | 2.4 M MMBtu |
Ranked #1,027 out of 11,835 Power Plants Nationwide | |
Ranked #22 out of 5,643 Solar Power Plants Nationwide | |
Ranked #15 out of 109 Nevada Power Plants | |
Ranked #4 out of 60 Nevada Solar Power Plants | |
Fuel Types | Solar |
Previous Operator |
First Solar Energy LLC (2013 to 2013) Silver State Solar Power South, LLC (2014 to 2023) |
Map of Silver State Solar Power South
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Silver State Solar Power South.
Monthly Net Generation for Silver State Solar Power South
Silver State Solar Power South Details
Summary Information | |
---|---|
Plant Name | Silver State Solar Power South (58644) |
Plant Address | E Primm Blvd, Primm Valley, NV 89019 |
Utility | Silver State Solar Power South, LLC (59363) |
Latitude, Longitude | 35.63, -115.32 |
Generation Dates on File | Nov 2015 to Aug 2024 |
Initial Operation Date | November 2015 |
Annual Generation | 647.5 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
Grid Voltage | 220.00 kV |
Energy Storage | No |
Generator BLK1 Details Operating November 2015
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 26.4 MW |
Summer Capacity | 26.4 MW |
Winter Capacity | 26.4 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | November 2015 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
DC Net Capacity | 33.8 MW |
Thin Film CDTE | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Generator BLK2 Details Operating December 2015
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 27.9 MW |
Summer Capacity | 27.9 MW |
Winter Capacity | 27.9 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 2015 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
DC Net Capacity | 35.9 MW |
Thin Film CDTE | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Generator BLK3 Details Operating December 2015
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 37.2 MW |
Summer Capacity | 37.2 MW |
Winter Capacity | 37.2 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 2015 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
DC Net Capacity | 49.2 MW |
Thin Film CDTE | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Generator BLK4 Details Operating January 2016
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 35.7 MW |
Summer Capacity | 35.7 MW |
Winter Capacity | 35.7 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 2016 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
DC Net Capacity | 47.3 MW |
Thin Film CDTE | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Generator BLK5 Details Operating April 2016
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 35 MW |
Summer Capacity | 35 MW |
Winter Capacity | 35 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | April 2016 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
DC Net Capacity | 46.5 MW |
Thin Film CDTE | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Generator BLK6 Details Operating April 2016
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 36.6 MW |
Summer Capacity | 36.6 MW |
Winter Capacity | 36.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | April 2016 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
DC Net Capacity | 48 MW |
Thin Film CDTE | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Generator BLK7 Details Operating May 2016
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 35 MW |
Summer Capacity | 35 MW |
Winter Capacity | 35 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | May 2016 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
DC Net Capacity | 44.5 MW |
Thin Film CDTE | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Generator BLK8 Details Operating June 2016
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 26.3 MW |
Summer Capacity | 26.3 MW |
Winter Capacity | 26.3 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 2016 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
DC Net Capacity | 33.4 MW |
Thin Film CDTE | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Silver State Solar Power South Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#12 | Juno Solar Project | Lamesa, TX | 795.1 GWh |
#13 | Prospero Solar | Andrews, TX | 746.0 GWh |
#14 | Neptune Energy Center Hybrid | Boone, CO | 707.3 GWh |
#15 | Solar Star 2 | Rosamond, CA | 701.3 GWh |
#16 | IP Radian, LLC | Brookesmith, TX | 687.2 GWh |
#17 | Copper Mountain Solar 5, LLC | Boulder City, NV | 685.2 GWh |
#18 | Slate Hybrid | Stratford, CA | 656.4 GWh |
#19 | Prospero Solar II | Andrews, TX | 675.9 GWh |
#20 | Agua Caliente Solar Project | Dateland, AZ | 674.0 GWh |
#21 | Desert Sunlight 300, LLC | Desert Center, CA | 659.4 GWh |
#23 | Texas Solar Nova 1 | Spur, TX | 640.0 GWh |
#24 | Arroyo Solar Energy Storage Hybrid | Pueblo Pintado, NM | 612.2 GWh |
#25 | Arlington Energy Center II | Blythe, CA | 596.9 GWh |
#26 | Mojave Solar Project | Hinkley, CA | 624.3 GWh |
#27 | California Valley Solar Ranch | California Valley, CA | 623.8 GWh |
#28 | Arrow Canyon Solar Hybrid | Moapa, NV | 612.4 GWh |
#29 | Stateline Solar | Nipton, CA | 618.5 GWh |
#30 | Copper Mountain Solar 3 | Boulder City, NV | 610.5 GWh |
#31 | Genesis Solar Energy Project | Blythe, CA | 609.1 GWh |
#32 | McCoy Solar Energy Project Hybrid | Blythe, CA | 524.7 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Silver State Solar Power South.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Boulder Solar II, LLC | Boulder City, NV | 124.4 GWh | 26 mi |
CM10 | Boulder City, NV | 19.2 GWh | 21.3 mi |
CM48 | Boulder City, NV | 93.3 GWh | 21.1 mi |
Copper Mountain Solar 2 | Boulder City, NV | 348.7 GWh | 22.8 mi |
Copper Mountain Solar 4, LLC | Boulder City, NV | 214.2 GWh | 22 mi |
Copper Mountain Solar 5, LLC | Boulder City, NV | 685.2 GWh | 21.9 mi |
Desert Star Energy Center | Boulder City, NV | 1.2 TWh | 21.3 mi |
Goodsprings Waste Heat Recovery | Jean, NV | 22.2 GWh | 13.4 mi |
Higgins Generating Station | Primm, NV | 2.3 TWh | 2.3 mi |
IGS LAS1 | Henderson, NV | 1.0 GWh | 25.3 mi |
Ivanpah 1 | Nipton, CA | 230.3 GWh | 10 mi |
Ivanpah 2 | Nipton, CA | 268.3 GWh | 9.8 mi |
Ivanpah 3 | Nipton, CA | 270.0 GWh | 9.7 mi |
Nevada Solar One | Boulder City, NV | 94.1 GWh | 22.3 mi |
Searchlight Solar | Searchlight, NV | 42.6 GWh | 23.9 mi |
Silver State Solar Power North | Primm, NV | 112.8 GWh | 11.4 mi |
Stateline Solar | Nipton, CA | 618.5 GWh | 4.9 mi |
Techren Solar I LLC | Boulder, NV | 196.8 GWh | 24.7 mi |
Techren Solar II LLC | Boulder, NV | 515.8 GWh | 26.2 mi |
Techren Solar III LLC | Boulder, NV | 59.4 GWh | 24.5 mi |