Sikorsky Aircraft CHP
6900 Main St, Stratford, CT 6615Plant Summary Information
Sikorsky Aircraft CHP is ranked #26 out of 156 power plants in Connecticut in terms of total annual net electricity generation.
Sikorsky Aircraft CHP is comprised of 3 generators and generated 15.6 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Sikorsky Aircraft CHP |
---|---|
Utility Name | Sikorsky Aircraft Corporation |
Location | Greater Bridgeport Planning Region, CT |
Initial Operation Date | June 2010 |
Last Update | Dec 2023 |
Annual Generation | 64.3 GWh |
Annual Consumption | 997.5 k MMBtu |
Ranked #3,619 out of 11,835 Power Plants Nationwide | |
Ranked #1,018 out of 2,253 Natural Gas Power Plants Nationwide | |
Ranked #26 out of 156 Connecticut Power Plants | |
Ranked #17 out of 55 Connecticut Natural Gas Power Plants | |
Fuel Types | Natural Gas : 99.9% |
Map of Sikorsky Aircraft CHP
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Sikorsky Aircraft CHP.
Monthly Net Generation for Sikorsky Aircraft CHP
Sikorsky Aircraft CHP Details
Summary Information | |
---|---|
Plant Name | Sikorsky Aircraft CHP (61703) |
Plant Address | 6900 Main St, Stratford, CT 6615 |
Utility | Sikorsky Aircraft Corporation (61332) |
Latitude, Longitude | 41.25001, -73.09865 |
Generation Dates on File | Jan 2017 to Dec 2023 |
Initial Operation Date | June 2010 |
Annual Generation | 64.3 GWh |
Fuel Types | Natural Gas : 99.9% |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | Yes |
FERC Cogeneration Docket Number | 12-05-15, CT00502-12 |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | NPCC |
Balancing Authority | ISO New England Inc. (ISNE) |
NAICS Code | Transportation Equipment Manufacturing (336) |
Sector | Industrial CHP (7) |
Water Source | Aquarion Water Co. |
Ash Impoundment | No |
Transmission / Distribution Owner | United Illuminating Co (19497) CT |
Grid Voltage | 13.80 kV |
Energy Storage | No |
Natural Gas Information | |
Local Distribution Company (LDC) | SOUTHERN CONNECTICUT GAS COMPANY |
Natural Gas Storage | No |
Generator PV-1 Details Operating June 2010
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 0.1 MW |
Summer Capacity | 0.1 MW |
Winter Capacity | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 2010 |
---|---|
Combined Heat & Power | No |
Sector Name | Industrial CHP (7) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Multiple Fuels | No |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 196.9 |
Tilt Angle | 10 |
DC Net Capacity | 0.1 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Generator TG-1 Details Operating May 2011
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 9.2 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 10.3 MW |
Winter Capacity | 11.8 MW |
Minimum Load | 1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | May 2011 |
Combined Heat & Power | Yes |
---|---|
Sector Name | Industrial CHP (7) |
Topping Or Bottoming | T |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 10.2 MW |
Net Winter Capacity With Natural Gas | 11.8 MW |
Net Summer Capacity With Oil | 9.6 MW |
Net Winter Capacity With Oil | 11.1 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator STG-1 Details Operating January 2021
Technology | Natural Gas Steam Turbine |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 0.6 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.6 MW |
Winter Capacity | 0.6 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | January 2021 |
---|---|
Combined Heat & Power | No |
Sector Name | Industrial CHP (7) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 0.55 MW |
Net Winter Capacity With Natural Gas | 0.55 MW |
Net Summer Capacity With Oil | 0.55 MW |
Net Winter Capacity With Oil | 0.55 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | No |
Sikorsky Aircraft CHP Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1008 | Lee Energy Facility | Dixon, IL | 67.0 GWh |
#1009 | Packaging Corp of America | Counce, TN | 409.7 GWh |
#1010 | Yuma Cogeneration Associates | Yuma, AZ | 66.6 GWh |
#1011 | Univ of Massachusetts Medical Center | Worcester, MA | 68.1 GWh |
#1012 | Wolf Run Energy | Wilmot Township, PA | 66.1 GWh |
#1013 | Packaging Corp. of America Jackson Mill | Jackson, AL | 158.4 GWh |
#1014 | The Andersons Albion Ethanol LLC | Albion, MI | 65.7 GWh |
#1015 | Cumberland (NJ) | Millville, NJ | 65.6 GWh |
#1016 | 491 E 48th Street | Holland, MI | 65.3 GWh |
#1017 | International Paper Pensacola | Cantonment, FL | 336.2 GWh |
#1019 | Boulder Park | Spokane, WA | 63.9 GWh |
#1020 | CityCenter Central Plant Cogen Units | Las Vegas, NV | 63.8 GWh |
#1021 | Georgia-Pacific Wauna Mill | Clatskanie, OR | 181.3 GWh |
#1022 | Gallatin (TN) | Gallatin, TN | 3.6 TWh |
#1023 | Four Corners | Fruitland, NM | 8.0 TWh |
#1024 | Blue Lake | Shakopee, MN | 63.1 GWh |
#1025 | Bayswater Peaking Facility LLC | Far Rockaway, NY | 62.9 GWh |
#1026 | Tilton | Tilton, IL | 62.7 GWh |
#1027 | Phelps Dodge Refining | El Paso, TX | 62.5 GWh |
#1028 | Oxbow Creek | Factoryville, PA | 62.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Sikorsky Aircraft CHP.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Bridgeport Energy Project | Bridgeport, CT | 2.5 TWh | 7.1 mi |
Bridgeport Fuel Cell, LLC | Bridgeport, CT | 105.1 GWh | 8.1 mi |
Bridgeport Station | Bridgeport, CT | 3.2 TWh | 7.1 mi |
Derby Fuel Cell | Derby, CT | 8.2 GWh | 5.2 mi |
Derby Hydro | Shelton, CT | 9.3 GWh | 5.1 mi |
Devon Station | Milford, CT | 123.0 MWh | 2.8 mi |
Digital Fairfield | Trumbull, CT | 13.1 GWh | 2.6 mi |
Emerald Gardens PKI, LLC | Shelton, CT | 2.2 GWh | 1.9 mi |
Fairfield University CHP Plant | Fairfield, CT | 25.3 GWh | 10.4 mi |
GenConn Devon LLC | Milford, CT | 2.3 GWh | 2.7 mi |
IKEA New Haven Rooftop PV & Fuel Cell | New Haven, CT | 1.8 GWh | 9.8 mi |
Milford Power Project | Milford, CT | 3.6 TWh | 1.8 mi |
New Haven Harbor | New Haven, CT | 29.9 GWh | 10.4 mi |
Park Solar | Woodbridge, CT | 20.0 MWh | 8.3 mi |
Stevenson | Monroe, CT | 111.2 GWh | 10 mi |
UB Fuel Cell | Bridgeport, CT | 10.5 GWh | 7.8 mi |
UI RCP Bridgeport Seaside | Bridgeport, CT | 19.4 GWh | 8.6 mi |
UI RCP New Haven Fuel Cell | New Haven, CT | 19.4 GWh | 10.7 mi |
UI RCP Woodbridge FC | Woodbridge, CT | 16.5 GWh | 8.8 mi |
Wheelabrator Bridgeport | Bridgeport, CT | 441.9 GWh | 8.3 mi |