Sidney A Murray Jr Hydroelectric
5707 Hwy. 15, Vidalia, LA 71373Plant Summary Information
Sidney A Murray Jr Hydroelectric is ranked #25 out of 77 power plants in Louisiana in terms of total annual net electricity generation.
Sidney A Murray Jr Hydroelectric is comprised of 8 generators and generated 48.9 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Sidney A Murray Jr Hydroelectric |
---|---|
Utility Name | First National Bank-Commerce |
Location | Concordia Parish, LA |
Initial Operation Date | May 1990 |
Last Update | Dec 2023 |
Annual Generation | 707.5 GWh |
Annual Consumption | 2.7 M MMBtu |
Ranked #968 out of 11,835 Power Plants Nationwide | |
Ranked #56 out of 1,371 Water Power Plants Nationwide | |
Ranked #25 out of 77 Louisiana Power Plants | |
Ranked #1 out of 1 Louisiana Water Power Plants | |
Fuel Types | Water |
Map of Sidney A Murray Jr Hydroelectric
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Sidney A Murray Jr Hydroelectric.
Monthly Net Generation for Sidney A Murray Jr Hydroelectric
Sidney A Murray Jr Hydroelectric Details
Summary Information | |
---|---|
Plant Name | Sidney A Murray Jr Hydroelectric (54678) |
Plant Address | 5707 Hwy. 15, Vidalia, LA 71373 |
Utility | First National Bank-Commerce (6371) |
Latitude, Longitude | 31.08801, -91.61885 |
Generation Dates on File | Jan 2001 to Dec 2023 |
Initial Operation Date | May 1990 |
Annual Generation | 707.5 GWh |
Fuel Types | Water |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | SERC |
Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | Mississippi River |
Ash Impoundment | No |
Transmission / Distribution Owner | Entergy Louisiana LLC (11241) LA |
Grid Voltage | 115.00 kV |
Energy Storage | No |
Generator 04 Details Operating May 1990
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 24 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 24 MW |
Winter Capacity | 24 MW |
Minimum Load | 3 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | May 1990 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator 06 Details Operating May 1990
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 24 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 24 MW |
Winter Capacity | 24 MW |
Minimum Load | 3 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | May 1990 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator 03 Details Operating June 1990
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 24 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 24 MW |
Winter Capacity | 24 MW |
Minimum Load | 3 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 1990 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator 05 Details Operating June 1990
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 24 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 24 MW |
Winter Capacity | 24 MW |
Minimum Load | 3 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 1990 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator 07 Details Operating June 1990
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 24 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 24 MW |
Winter Capacity | 24 MW |
Minimum Load | 3 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 1990 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator 01 Details Operating July 1990
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 24 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 24 MW |
Winter Capacity | 24 MW |
Minimum Load | 3 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | July 1990 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator 08 Details Operating July 1990
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 24 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 24 MW |
Winter Capacity | 24 MW |
Minimum Load | 3 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | July 1990 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator 02 Details Operating August 1990
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 24 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 24 MW |
Winter Capacity | 24 MW |
Minimum Load | 3 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | August 1990 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Sidney A Murray Jr Hydroelectric Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Water.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#46 | Cabinet Gorge | Clark Fork, ID | 815.7 GWh |
#47 | Fontana Dam | Fontana Dam, NC | 813.6 GWh |
#48 | Watts Bar Hydro | Spring City, TN | 812.4 GWh |
#49 | Selis Ksanka Qlispe | Polson, MT | 804.8 GWh |
#50 | Big Creek 3 | Auberry, CA | 783.0 GWh |
#51 | Round Butte | Madras, OR | 780.2 GWh |
#52 | Big Bend Dam | Chamberlain, SD | 770.5 GWh |
#53 | Bull Shoals | Mountain Home, AR | 750.5 GWh |
#54 | Great Lakes Hydro America - ME | Millinocket, ME | 737.2 GWh |
#55 | Gavins Point | Crofton, NE | 715.3 GWh |
#57 | Fort Peck | Fort Peck, MT | 701.2 GWh |
#58 | Fort Loudoun | Lenoir City, TN | 676.5 GWh |
#59 | Gorge | Rockport, WA | 676.4 GWh |
#60 | Chickamauga | Chattanooga, TN | 657.3 GWh |
#61 | Hungry Horse | Columbia Falls, MT | 650.2 GWh |
#62 | Folsom | Folsom, CA | 648.5 GWh |
#63 | J Strom Thurmond | Clarks Hill, SC | 632.4 GWh |
#64 | Poe | Storrie, CA | 608.8 GWh |
#65 | Rock Creek | Storrie, CA | 571.1 GWh |
#66 | Swift 1 | Cougar, WA | 567.6 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Sidney A Murray Jr Hydroelectric.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Acadia Energy Center | Eunice, LA | 5.9 TWh | 65.6 mi |
Big Cajun 1 | Jarreau, LA | 268.1 GWh | 32.6 mi |
Big Cajun 2 | New Roads, LA | 2.4 TWh | 29.1 mi |
Carville Energy LLC | St Gabriel, LA | 3.0 TWh | 67.8 mi |
Coughlin Power Station | St Landry, LA | 4.6 TWh | 41.6 mi |
D G Hunter | Alexandria, LA | 117.8 GWh | 52.3 mi |
ExxonMobil Baton Rouge Turbine Generator | Baton Rouge, LA | 639.9 GWh | 48.6 mi |
Formosa Plastics | Baton Rouge, LA | 369.6 GWh | 48.1 mi |
Hargis-Hebert Electric Generating | Lafayette, LA | 46.0 GWh | 67.2 mi |
LA3 West Baton Rouge Solar Facility | West Baton Rouge, LA | 114.3 GWh | 46.3 mi |
LaO Energy Systems | Plaquemine, LA | 1.8 TWh | 57.9 mi |
Louisiana 1 | Baton Rouge, LA | 2.8 TWh | 48.5 mi |
LSU Cogen | Baton Rouge, LA | 55.7 GWh | 53.5 mi |
Oxbow Solar 1 | New Roads, LA | 122.7 GWh | 32 mi |
Plaquemine Cogeneration Plant | Plaquemine, LA | 5.0 TWh | 57.7 mi |
Port Allen (LA) | Port Allen, LA | 48.6 GWh | 48.7 mi |
River Bend | St. Francisville, LA | 7.7 TWh | 28.5 mi |
St Francisville Mill | St. Francisville, LA | 116.0 GWh | 31.4 mi |
T J Labbe Electric Generating | Lafayette, LA | 46.5 GWh | 62.8 mi |
Westlake Plaquemine | Plaquemine, LA | 1.6 TWh | 62.8 mi |