Sheldon Solar
121 Heather Lane, Sheldon Springs, VT 5485Plant Summary Information
Sheldon Solar is ranked #11 out of 50 solar farms in Vermont in terms of total annual net electricity generation.
Sheldon Solar generated 2.3 GWh during the 3-month period between October 2022 to January 2023.
Plant Name | Sheldon Solar |
---|---|
Utility Name | Excelsior Energy Capital |
Location | Franklin County, VT |
Initial Operation Date | September 2013 |
Last Update | Jan 2023 |
Annual Generation | 4.6 GWh |
Annual Consumption | 15.7 k MMBtu |
Ranked #7,845 out of 11,852 Power Plants Nationwide | |
Ranked #2,906 out of 5,655 Solar Power Plants Nationwide | |
Ranked #52 out of 111 Vermont Power Plants | |
Ranked #11 out of 50 Vermont Solar Power Plants | |
Fuel Types | Solar |
Previous Operators |
Enel North America, Inc. (2013 to 2013) Enel Green Power NA, Inc. (2014 to 2020) Excelsior Energy Capital (2021 to 2023) |
Map of Sheldon Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Sheldon Solar.
Monthly Net Generation for Sheldon Solar
Sheldon Solar Details
Summary Information | |
---|---|
Plant Name | Sheldon Solar (58824) |
Plant Address | 121 Heather Lane, Sheldon Springs, VT 5485 |
Utility | Excelsior Energy Capital (64423) |
Latitude, Longitude | 44.91056, -72.97944 |
Generation Dates on File | Sep 2013 to Jan 2023 |
Initial Operation Date | September 2013 |
Annual Generation | 4.6 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | QF13-405 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | NPCC |
Balancing Authority | ISO New England Inc. (ISNE) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Vermont Electric Cooperative, Inc (19791) VT |
Grid Voltage | 48.00 kV |
Energy Storage | No |
Generator I402 Details Operating September 2013
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 2.3 MW |
Summer Capacity | 2.3 MW |
Winter Capacity | 2.3 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | September 2013 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 30 |
DC Net Capacity | 2.4 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Sheldon Solar Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#2896 | Berkley East Solar LLC | Berkley, MA | 4.6 GWh |
#2897 | 1051 Lucky Solar, LLC | Hamptonville, NC | 4.6 GWh |
#2898 | Hanford 1 and 2 | Hanford, CA | 4.6 GWh |
#2899 | Waynesville Solar Farm (MO) | Waynesville, MO | 4.6 GWh |
#2900 | West A&B Solar Project Hybrid CSG | Southbridge, MA | 4.5 GWh |
#2901 | ESCA-LL-COLTON, LLC | Colton, CA | 4.6 GWh |
#2902 | Tedder Solar | Darlington, SC | 4.6 GWh |
#2903 | Wilkinson DeFore | Gordon, GA | 4.6 GWh |
#2904 | Warsaw Solar CSG | Morristown, MN | 4.6 GWh |
#2905 | Solar Photovoltaic Project #26 | Rialto, CA | 4.6 GWh |
#2907 | Hampden | Hampden, MA | 4.6 GWh |
#2908 | Troup RC50 | Pine Mountain, GA | 4.6 GWh |
#2909 | AMP Napoleon Solar Facility | Napoleon, OH | 4.6 GWh |
#2910 | Millbury Solar | Millbury, MA | 4.6 GWh |
#2911 | Monroe Solar | Chatham, VA | 4.6 GWh |
#2912 | 1639 RT 29 Solar 2 | Gloversville, NY | 4.5 GWh |
#2913 | IL West Hallock Project1 | Edelstein, IL | 4.5 GWh |
#2914 | Chicopee Solar | Chicopee, MA | 4.5 GWh |
#2915 | Volney II | Fulton, NY | 4.5 GWh |
#2916 | BristolSolar | Woodburn, OR | 4.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Sheldon Solar.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Cadys Falls | Morrisville, VT | 236.1 MWh | 29.2 mi |
Clark Falls | Milton, VT | 19.8 GWh | 20.2 mi |
Colchester 16 | Colchester, VT | 4.0 MWh | 30.5 mi |
Essex Junction 19 | Essex Junction, VT | 47.4 GWh | 30.4 mi |
Fairfax Falls | Fairfax, VT | 23.2 GWh | 17.8 mi |
Georgia Mountain Community Wind Farm | Milton, VT | 26.0 GWh | 17.8 mi |
Highgate Falls | Highgate, VT | 49.8 GWh | 3.9 mi |
Kingdom Community Wind | Lowell, VT | 156.5 GWh | 29.4 mi |
Milton | Milton, VT | 48.3 GWh | 19.7 mi |
Morrisville | Morrisville, VT | 5.6 GWh | 30.4 mi |
Peterson | Milton, VT | 36.3 GWh | 20.9 mi |
Route 22 Community Solar Farm CSG | Plattsburgh, NY | 5.9 GWh | 27.1 mi |
Saint Albans Solar | Georgia, VT | 7.0 GWh | 11 mi |
Saranac Facility | Plattsburgh, NY | 234.4 GWh | 27 mi |
Sheldon Springs Hydroelectric | Sheldon Springs, VT | 74.8 GWh | 0.3 mi |
St. Albans SPEED Project | St. Albans, VT | 2.3 GWh | 10 mi |
VEC Alburgh Array | Alburgh, VT | 1.2 GWh | 14.9 mi |
VPPSA Project 10 | Swanton, VT | 908.0 MWh | 5.9 mi |
W K Sanders | Hyde Park, VT | 915.0 MWh | 29.5 mi |
Whitcomb Solar Farm | Essex Junction, VT | 2.7 GWh | 30.4 mi |