Shelby Solar Array
129 West State Street, Shelby, OH 44875Plant Summary Information
Shelby Solar Array is ranked #38 out of 52 solar farms in Ohio in terms of total annual net electricity generation.
Shelby Solar Array generated 321.0 MWh during the 3-month period between May 2024 to August 2024.
Plant Name | Shelby Solar Array |
---|---|
Utility Name | AEP Onsite Partners, LLC |
Location | Richland County, OH |
Initial Operation Date | December 2019 |
Last Update | Aug 2024 |
Annual Generation | 2.3 GWh |
Annual Consumption | 9.2 k MMBtu |
Ranked #9,590 out of 11,835 Power Plants Nationwide | |
Ranked #4,350 out of 5,643 Solar Power Plants Nationwide | |
Ranked #117 out of 182 Ohio Power Plants | |
Ranked #38 out of 52 Ohio Solar Power Plants | |
Fuel Types | Solar |
Previous Operator |
AEP Onsite Partners (2019 to 2019) AEP Onsite Partners, LLC (2020 to 2023) |
Map of Shelby Solar Array
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Shelby Solar Array.
Monthly Net Generation for Shelby Solar Array
Shelby Solar Array Details
Summary Information | |
---|---|
Plant Name | Shelby Solar Array (63390) |
Plant Address | 129 West State Street, Shelby, OH 44875 |
Utility | AEP Onsite Partners, LLC (60571) |
Latitude, Longitude | 40.89604, -82.6724 |
Generation Dates on File | Jan 2020 to Aug 2024 |
Initial Operation Date | December 2019 |
Annual Generation | 2.3 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 20-320-000 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | RFC |
Balancing Authority | PJM Interconnection, LLC (PJM) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | City of Shelby - (OH) (17043) OH |
Grid Voltage | 12.47 kV |
Energy Storage | No |
Generator SHBOH Details Operating December 2019
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 1.9 MW |
Summer Capacity | 1.9 MW |
Winter Capacity | 1.9 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | December 2019 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
DC Net Capacity | 2.5 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Shelby Solar Array Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#4340 | County of San Diego SBRC | Chula Vista, CA | 2.3 GWh |
#4341 | E&B Resources | Bakersfield, CA | 2.3 GWh |
#4342 | Rio Rancho High School | Rio Rancho, NM | 2.3 GWh |
#4343 | Brooten CSG1, LLC | Brooten, MN | 2.3 GWh |
#4344 | 456 Lower | Minisink, NY | 2.3 GWh |
#4345 | Kenmare - Mansfield Branch Street | Mansfield, MA | 2.3 GWh |
#4346 | Call Farms 1 | Batavia, NY | 2.3 GWh |
#4347 | IKEA College Park 411 | College Park, MD | 2.3 GWh |
#4348 | Guadalupe Solar Farm | San Jose, CA | 2.3 GWh |
#4349 | 232 Long Branch 29 Solar I, LLC | Shelby, NC | 2.3 GWh |
#4351 | Stow PV | Stow, MA | 2.3 GWh |
#4352 | CPG - Duke 6000 Holabird | Baltimore, MD | 2.3 GWh |
#4353 | Lowry CSG2, LLC | Glenwood, MN | 2.3 GWh |
#4354 | USS Prokosch Solar LLC | Bird Island, MN | 2.3 GWh |
#4355 | Bloomington Solar I | St George, UT | 2.3 GWh |
#4356 | Pittsgrove Solar | Elmer, NJ | 2.3 GWh |
#4357 | Denison Solar Array | Granville, OH | 2.3 GWh |
#4358 | ESIL-PFCHICAGO 3, LLC | Chicago, IL | 2.3 GWh |
#4359 | Sharon Springs | Sharon Springs, NY | 2.3 GWh |
#4360 | North Bergen Solar | North Bergen, NJ | 2.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Shelby Solar Array.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Broshco Fabricated Products | Mansfield, OH | 3.3 GWh | 9.9 mi |
Clyde Peaking Engine | Clyde, OH | 540.0 MWh | 31.4 mi |
Clyde Solar Array | Clyde, OH | 4.0 GWh | 33.5 mi |
Energy Developments, Hancock | Findlay, OH | 21.4 GWh | 40.2 mi |
Galion | Galion, OH | 167.0 MWh | 13.1 mi |
Galion Generating Station | Galion, OH | 2.0 GWh | 13.8 mi |
Harpster Wind | Harpster, OH | 1.9 GWh | 31.6 mi |
Loraine County Project | Oberlin, OH | 101.3 GWh | 37.9 mi |
Monroeville RTO BTM | Monroeville, OH | 83.0 MWh | 24.1 mi |
Monroeville Solar | Monroeville, OH | 4.0 GWh | 23.2 mi |
Oberlin (OH) | Oberlin, OH | 292.0 MWh | 35.7 mi |
Oberlin Spear Point Solar One | Oberlin, OH | 2.1 GWh | 36.4 mi |
POET Biorefining - Marion, LLC | Marion, OH | 29.7 GWh | 31.7 mi |
Progress Drive Generation Station | Shelby, OH | 38.0 MWh | 29 mi |
Renewable Energy Services of Ohio | Milan, OH | 11.1 GWh | 30.6 mi |
Shelby North | Shelby, OH | 23.0 MWh | 0.5 mi |
Shelby South | Shelby, OH | 37.0 MWh | 1.3 mi |
Wellington | Wellington, OH | 32.0 MWh | 29.6 mi |
Whirlpool Corporation - Marion Wind Farm | Marion, OH | 8.9 GWh | 33.8 mi |
Wyandot Solar Farm | Upper Sandusky, OH | 11.4 GWh | 33.7 mi |