Bray Avenue, Shawmut, ME 4975Plant Summary Information
Shawmut is ranked #22 out of 50 hydroelectric power plants in Maine in terms of total annual net electricity generation.
Shawmut is comprised of 8 generators and generated 6.3 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Shawmut |
---|---|
Utility Name | Brookfield White Pine Hydro LLC |
Location | Somerset County, ME |
Initial Operation Date | January 1913 |
Last Update | Dec 2023 |
Annual Generation | 36.7 GWh |
Annual Consumption | 140.1 k MMBtu |
Ranked #4,283 out of 11,852 Power Plants Nationwide | |
Ranked #585 out of 1,371 Water Power Plants Nationwide | |
Ranked #55 out of 161 Maine Power Plants | |
Ranked #22 out of 50 Maine Water Power Plants | |
Fuel Types | Water |
Map of Shawmut
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Shawmut.
Monthly Net Generation for Shawmut
Shawmut Details
Summary Information | |
---|---|
Plant Name | Shawmut (1504) |
Plant Address | Bray Avenue, Shawmut, ME 4975 |
Utility | Brookfield White Pine Hydro LLC (39006) |
Latitude, Longitude | 44.62952, -69.58353 |
Generation Dates on File | Jan 2001 to Dec 2023 |
Initial Operation Date | January 1913 |
Annual Generation | 36.7 GWh |
Fuel Types | Water |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | 99-35-000 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | NPCC |
Balancing Authority | ISO New England Inc. (ISNE) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | Kennebec River |
Ash Impoundment | No |
Transmission / Distribution Owner | Central Maine Power Co (3266) ME |
Grid Voltage | 34.00 kV |
Energy Storage | No |
Generator SH1 Details Operating January 1913
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 0.7 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 0.9 MW |
Winter Capacity | 0.9 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | January 1913 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Generator SH2 Details Operating January 1913
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 0.7 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 0.9 MW |
Winter Capacity | 0.9 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | January 1913 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Generator SH3 Details Operating January 1913
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 0.7 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 0.9 MW |
Winter Capacity | 0.9 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | January 1913 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Generator SH4 Details Operating January 1913
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 0.7 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 0.9 MW |
Winter Capacity | 0.9 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | January 1913 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Generator SH5 Details Operating January 1913
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 0.7 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 0.9 MW |
Winter Capacity | 0.9 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | January 1913 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Generator SH6 Details Operating January 1921
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 0.9 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 0.9 MW |
Winter Capacity | 0.9 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | January 1921 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Generator SH7 Details Operating January 1982
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 2.2 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 1.9 MW |
Winter Capacity | 1.9 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | January 1982 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Generator SH8 Details Operating January 1982
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 2.2 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 1.9 MW |
Winter Capacity | 1.9 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | January 1982 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Shawmut Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Water.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#575 | Buck Hydro | Ivanhoe, VA | 38.5 GWh |
#576 | Twin Falls (WI) | Florence, WI | 37.8 GWh |
#577 | Buzzard Roost | Chappells, SC | 37.8 GWh |
#578 | Port Edwards Mill | Port Edwards, WI | 37.8 GWh |
#579 | Eagle Pass | Eagle Pass, TX | 37.8 GWh |
#580 | Flint River | Albany, GA | 37.4 GWh |
#581 | St. Cloud Hydro | St Cloud, MN | 37.2 GWh |
#582 | Twin Falls (ID) | Kimberly, ID | 37.1 GWh |
#583 | Granby | Fulton, NY | 37.0 GWh |
#584 | Upriver Dam Hydro Plant | Spokane, WA | 36.8 GWh |
#586 | Spaulding 1 | Emigrant Gap, CA | 36.6 GWh |
#587 | Chace Mill Winooski One | Winooski, VT | 36.3 GWh |
#588 | Peterson | Milton, VT | 36.3 GWh |
#589 | Rainbow (CT) | Windsor, CT | 35.8 GWh |
#590 | Poole | Lee Vining, CA | 35.7 GWh |
#591 | West Buxton | Buxton, ME | 35.7 GWh |
#592 | Bishop Creek 2 | Bishop, CA | 35.6 GWh |
#593 | Cascade Dam | Cascade, ID | 35.5 GWh |
#594 | Horseshoe Bend Hydroelectric Co | Horseshoe Bend, ID | 35.5 GWh |
#595 | Sherman | Rowe, MA | 35.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Shawmut.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Barefoot Solar | Fairfiled, ME | 4.1 GWh | 2.6 mi |
Benton Falls Associates | Benton, ME | 17.3 GWh | 3.7 mi |
Cenergy - Richards (CSG) | Fairfield, ME | 220.0 MWh | 1.5 mi |
Cenergy - Waterville (CSG) | Waterville, ME | 1.8 GWh | 7.5 mi |
Fairfield PV - BD Solar Fairfield LLC | Fairfield, ME | 8.2 GWh | 0.7 mi |
Hydro Kennebec Project | Winslow, ME | 69.6 GWh | 4.9 mi |
Lockwood Hydroelectric Facility | Waterville, ME | 23.7 GWh | 6.1 mi |
ME Novel Lighthouse - Front St. Solar CSG | Skowhegan, ME | 1.4 GWh | 11.3 mi |
Messalonskee 2 (Oakland) | Oakland, ME | 12.9 GWh | 8.4 mi |
Messalonskee 3 | Oakland, ME | 7.3 GWh | 6.4 mi |
Messalonskee 5 | Waterville, ME | 5.1 GWh | 7.4 mi |
Oakland | Oakland, ME | 8.0 GWh | 6.6 mi |
Pittsfield Hydro | Burnham, ME | 5.7 GWh | 10.6 mi |
Solar Mule, LLC | Oakland, ME | 2.0 GWh | 6.6 mi |
Somerset Plant | Skowhegan, ME | 495.5 GWh | 6 mi |
Three Corners Solar | Unity, ME | 69.3 GWh | 6.6 mi |
Unity Solar | Unity, ME | 7.3 GWh | 11.4 mi |
Webb Road Solar | Waterville, ME | 4.7 GWh | 9 mi |
Weston Hydro | Skowhegan, ME | 88.4 GWh | 11.4 mi |
Winslow PV - BD Solar 2 LLC | Winslow, ME | 10.9 GWh | 4.8 mi |