Shamrock Wind
TBD, TBD, TX 76932Plant Summary Information
Shamrock Wind is ranked #79 out of 218 wind farms in Texas in terms of total annual net electricity generation.
Shamrock Wind generated 215.4 GWh during the 3-month period between May 2024 to August 2024.
Plant Name | Shamrock Wind |
---|---|
Utility Name | Shamrock Wind LLC |
Location | Crockett County, TX |
Initial Operation Date | December 2023 |
Last Update | Aug 2024 |
Annual Generation | 603.2 GWh |
Annual Consumption | 2.1 M MMBtu |
Ranked #1,085 out of 11,835 Power Plants Nationwide | |
Ranked #246 out of 1,343 Wind Power Plants Nationwide | |
Ranked #197 out of 749 Texas Power Plants | |
Ranked #79 out of 218 Texas Wind Power Plants | |
Fuel Types | Wind |
Map of Shamrock Wind
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Shamrock Wind.
Monthly Net Generation for Shamrock Wind
Shamrock Wind Details
Summary Information | |
---|---|
Plant Name | Shamrock Wind (66540) |
Plant Address | TBD, TBD, TX 76932 |
Utility | Shamrock Wind LLC (65578) |
Latitude, Longitude | 30.936, -101.607 |
Generation Dates on File | Dec 2023 to Aug 2024 |
Initial Operation Date | December 2023 |
Annual Generation | 603.2 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | NA |
Ash Impoundment | No |
Transmission / Distribution Owner | Lower Colorado River Authority (11269) |
Grid Voltage | 345.00 kV |
Energy Storage | No |
Generator WSHAM Details Operating December 2023
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
Nameplate Capacity | 223.9 MW |
Summer Capacity | 223.9 MW |
Winter Capacity | 223.9 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 2023 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Wind |
Turbines/Hydrokinetic Buoys | 81 |
Turbine Details | |
Number Of Turbines | 81 |
---|---|
Predominant Turbine Manufacturer | GE |
Predominant Turbine Model Number | 2.82-127 |
Design Wind Speed | 19 MPH |
Wind Quality Class | 1 - High Wind |
Turbine Hub Height Feet | 114 |
Shamrock Wind Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#236 | Gopher Creek Wind Farm | Fluvanna, TX | 618.0 GWh |
#237 | Boiling Springs Wind Farm | Woodward, OK | 617.2 GWh |
#238 | Brady Wind Energy Center | Dickinson, ND | 615.5 GWh |
#239 | Raymond Wind Farm, LLC | Lyford, TX | 615.2 GWh |
#240 | Route 66 Wind Plant | Panhandle, TX | 614.8 GWh |
#241 | El Algodon Alto Wind Farm, LLC | Mathis, TX | 610.5 GWh |
#242 | Sweetwater Wind 4 LLC | Roscoe, TX | 609.9 GWh |
#243 | Bison 4 Wind Energy Center | New Salem, ND | 608.4 GWh |
#244 | South Plains Wind Phase I | Floydada, TX | 607.1 GWh |
#245 | Heart of Texas Wind Project | Brady, TX | 606.0 GWh |
#247 | NaturEner Rim Rock Energy | Kevin, MT | 601.5 GWh |
#248 | North Bend Wind Project, LLC | Highmore, SD | 599.5 GWh |
#249 | Maple Ridge Wind Farm | Lowville, NY | 599.2 GWh |
#250 | Limestone Wind Project | Coolidge, TX | 596.8 GWh |
#251 | Cedar Springs II | Douglas, WY | 596.2 GWh |
#252 | Chapman Ranch Wind I | Corpus Christi, TX | 595.2 GWh |
#253 | Pattern Panhandle Wind 2 LLC | Panhandle, TX | 595.1 GWh |
#254 | Astra Wind Farm | Happy, TX | 593.6 GWh |
#255 | Wild Horse | Ellensburg, WA | 592.7 GWh |
#256 | Castle Gap Wind | Goldthwaite, TX | 591.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Shamrock Wind.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Alamo 6 | Fort Stockton, TX | 238.9 GWh | 39.5 mi |
Appaloosa Run Wind | Rankin, TX | 708.3 GWh | 20.3 mi |
Castle Gap Solar Hybrid | McCarney, TX | 385.9 GWh | 45.1 mi |
CED Crane Solar | Crane, TX | 405.5 GWh | 47.1 mi |
Desert Sky | Iraan, TX | 462.3 GWh | 28.5 mi |
East Pecos Solar | McCamey, TX | 259.2 GWh | 40.2 mi |
Emerald Grove | Crane, TX | 281.6 GWh | 45.9 mi |
High Lonesome Wind Power, LLC Hybrid | Rankin, TX | 1.3 TWh | 23 mi |
King Mountain Wind Ranch 1 | McCamey, TX | 561.3 GWh | 42 mi |
Midway Solar - TX | Fort Stockton, TX | 302.3 GWh | 36.8 mi |
NWP Indian Mesa Wind Farm | Iraan, TX | 197.8 GWh | 35.2 mi |
Pearl Solar | Fort Stockton, TX | 99.6 GWh | 39.3 mi |
Ranchero Wind Farm LLC | Iraan, TX | 1.2 TWh | 25.3 mi |
RE Maplewood | McCamey, TX | 491.6 GWh | 38.7 mi |
Roadrunner, LLC Hybrid | McCamey, TX | 990.1 GWh | 39.8 mi |
Santa Rita East | Barnhart, TX | 1.1 TWh | 34.9 mi |
Santa Rita Wind Energy | Big Lake, TX | 1.2 TWh | 24.1 mi |
Upton County Solar | McCamey, TX | 287.4 GWh | 45.6 mi |
White Mesa Wind | Ozona, TX | 1.8 TWh | 20.5 mi |
Woodward Mountain II | Girvin, TX | 168.8 GWh | 47.8 mi |