Seneca Energy
2121 Route 414, Seneca Falls, NY 13148Plant Summary Information
Seneca Energy is ranked #9 out of 299 landfill gas power plants nationwide in terms of total annual net electricity generation.
Seneca Energy is comprised of 18 generators and generated 22.6 GWh during the 3-month period between May 2024 to August 2024.
Plant Name | Seneca Energy |
---|---|
Utility Name | Seneca Energy II |
Location | Seneca County, NY |
Initial Operation Date | March 1996 |
Last Update | Aug 2024 |
Annual Generation | 86.6 GWh |
Annual Consumption | 1.0 M MMBtu |
Ranked #3,342 out of 11,835 Power Plants Nationwide | |
Ranked #9 out of 299 Landfill Gas Power Plants Nationwide | |
Ranked #94 out of 832 New York Power Plants | |
Ranked #1 out of 16 New York Landfill Gas Power Plants | |
Fuel Types | Landfill Gas |
Map of Seneca Energy
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Seneca Energy.
Monthly Net Generation for Seneca Energy
Seneca Energy Details
Summary Information | |
---|---|
Plant Name | Seneca Energy (54782) |
Plant Address | 2121 Route 414, Seneca Falls, NY 13148 |
Utility | Seneca Energy II (17283) |
Latitude, Longitude | 42.9281, -76.8408 |
Generation Dates on File | Jan 2001 to Aug 2024 |
Initial Operation Date | March 1996 |
Annual Generation | 86.6 GWh |
Fuel Types | Landfill Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 05-163-001 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | NPCC |
Balancing Authority | New York Independent System Operator (NYIS) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | town water |
Ash Impoundment | No |
Transmission / Distribution Owner | New York State Elec & Gas Corp (13511) NY |
Grid Voltage | 34.50 kV |
Energy Storage | No |
Generator GEN1 Details Operating March 1996
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.8 MW |
Minimum Load | 0.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | March 1996 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GEN2 Details Operating March 1996
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.8 MW |
Minimum Load | 0.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | March 1996 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GEN3 Details Operating March 1996
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.8 MW |
Minimum Load | 0.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | March 1996 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GEN4 Details Operating August 1996
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.8 MW |
Minimum Load | 0.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | August 1996 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GEN5 Details Operating August 1996
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.8 MW |
Minimum Load | 0.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | August 1996 |
Planned Retirement | October 2025 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GEN6 Details Operating June 1997
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.8 MW |
Minimum Load | 0.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 1997 |
Planned Retirement | October 2025 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GEN7 Details Operating June 1997
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.8 MW |
Minimum Load | 0.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 1997 |
Planned Retirement | October 2025 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GE10 Details Operating August 1998
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.8 MW |
Minimum Load | 0.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | August 1998 |
Planned Retirement | October 2025 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GE11 Details Operating August 1998
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.8 MW |
Minimum Load | 0.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | August 1998 |
Planned Retirement | October 2025 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GE12 Details Operating August 1998
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.8 MW |
Minimum Load | 0.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | August 1998 |
Planned Retirement | October 2025 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GE13 Details Operating August 1998
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.8 MW |
Minimum Load | 0.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | August 1998 |
Planned Retirement | October 2025 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GE14 Details Operating August 1998
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.8 MW |
Minimum Load | 0.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | August 1998 |
Planned Retirement | October 2025 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GEN8 Details Operating August 1998
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.8 MW |
Minimum Load | 0.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | August 1998 |
Planned Retirement | October 2025 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GEN9 Details Operating August 1998
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.8 MW |
Minimum Load | 0.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | August 1998 |
Planned Retirement | October 2025 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GE15 Details Operating January 2007
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1.6 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.6 MW |
Winter Capacity | 1.6 MW |
Minimum Load | 0.8 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | January 2007 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
---|---|
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Planned New Prime Mover | IC |
Planned Energy Source | NG |
Planned New Nameplate Capacity | 1.6 MW |
Planned Repower | June 2025 |
Other Planned Modifications | No |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GE16 Details Operating January 2007
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1.6 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.6 MW |
Winter Capacity | 1.6 MW |
Minimum Load | 0.8 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | January 2007 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
---|---|
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Planned New Prime Mover | IC |
Planned Energy Source | NG |
Planned New Nameplate Capacity | 1.6 MW |
Planned Repower | June 2025 |
Other Planned Modifications | No |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GE17 Details Operating January 2007
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1.6 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.6 MW |
Winter Capacity | 1.6 MW |
Minimum Load | 0.8 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | January 2007 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GE18 Details Operating January 2007
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1.6 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.6 MW |
Winter Capacity | 1.6 MW |
Minimum Load | 0.8 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | January 2007 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Seneca Energy Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Landfill Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1 | Brea Expansion Plant | Brea, CA | 245.2 GWh |
#2 | Johnston LFG Turbine Plant | Johnston, RI | 231.7 GWh |
#3 | Bowerman Power LFG, LLC | Irvine, CA | 161.1 GWh |
#4 | Puente Hills Energy Recovery | Whittier, CA | 159.0 GWh |
#5 | Sunshine Gas Producers | Sylmar, CA | 115.9 GWh |
#6 | Loraine County Project | Oberlin, OH | 101.3 GWh |
#7 | Middlesex County Utilities Authority | Sayreville, NJ | 92.9 GWh |
#8 | Pine Tree Acres WM LFGTE | Lenox, MI | 89.9 GWh |
#10 | Omega Hills Gas Recovery | Germantown, WI | 86.2 GWh |
#11 | Ameresco Ox Mountain | Half Moon Bay, CA | 84.0 GWh |
#12 | Waste Management Columbia Ridge LFGTE | Arlington, OR | 81.0 GWh |
#13 | Waste Management King George LFGTE | King George, VA | 80.9 GWh |
#14 | Metro Methane Recovery Facility | Mitchellville, IA | 78.8 GWh |
#15 | Ontario LFGTE | Stanley, NY | 78.4 GWh |
#16 | Ocean County Landfill | Manchester, NJ | 74.4 GWh |
#17 | High Acres Gas Recovery | Fairport, NY | 72.1 GWh |
#18 | Pine Tree Acres | Lenox Twp, MI | 69.8 GWh |
#19 | Kiefer Landfill | Sloughhouse, CA | 66.6 GWh |
#20 | Livingston Generating Facility | Pontiac, IL | 64.0 GWh |
#21 | Georgia LFG Richland Creek Plant | Buford, GA | 62.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Seneca Energy.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Canoga Solar | Seneca Falls, NY | 8.2 GWh | 5.6 mi |
Cornell Geneva Solar Farm | Seneca, NY | 3.0 GWh | 10.5 mi |
Donati Solar | Seneca Falls, NY | 3.3 GWh | 2.8 mi |
Finger Lakes Solar I | Geneva, NY | 3.0 GWh | 13 mi |
Greenidge Generation LLC | Dresden, NY | 624.1 GWh | 18.1 mi |
Henkel U.S. Operations Corporation | Geneva, NY | 1.5 GWh | 7.1 mi |
Hobart & William Smith College Gates Rd. | Geneva, NY | 2.8 GWh | 11.6 mi |
Musgrave East Solar Farm | Aurora, NY | 3.1 GWh | 16.3 mi |
Musgrave West Solar Farm | Aurora, NY | 3.1 GWh | 16.3 mi |
Ontario LFGTE | Stanley, NY | 78.4 GWh | 13.4 mi |
Route 14A CDG Solar North and South LLC | Geneva, NY | 6.3 GWh | 13 mi |
Sangolqui Solar | Seneca Falls, NY | 3.5 GWh | 3.1 mi |
Seneca Falls Hydroelectric Project | Seneca Falls, NY | 10.2 GWh | 2.9 mi |
State Route 14A Solar | Benton, NY | 8.1 GWh | 17.5 mi |
Strauss CSG | Geneva, NY | 3.4 GWh | 8.2 mi |
Union Springs 40 | Union Spring, NY | 8.5 GWh | 11.1 mi |
Union Springs 963 | Union Spring, NY | 8.3 GWh | 11.1 mi |
Victory Mills | Victory Mills, NY | 4.0 GWh | 14.8 mi |
Waterloo Hydroelectric Project | Waterloo, NY | 3.8 GWh | 2.1 mi |
Williamson | Williamson, NY | 1.7 GWh | 19.3 mi |