Seneca Energy
2121 Route 414, Seneca Falls, NY 13148Plant Summary Information
Seneca Energy is ranked #13 out of 297 landfill gas power plants nationwide in terms of total annual net electricity generation.
Seneca Energy is comprised of 18 generators and generated 25.5 GWh during the 3-month period between December 2023 to March 2024.
Plant Name | Seneca Energy |
---|---|
Utility Name | Seneca Energy II |
Location | Seneca County, NY |
Initial Operation Date | March 1996 |
Last Update | Mar 2024 |
Annual Generation | 88.3 GWh |
Annual Consumption | 988.3 k MMBtu |
Ranked #3,252 out of 11,249 Power Plants Nationwide | |
Ranked #13 out of 297 Landfill Gas Power Plants Nationwide | |
Ranked #98 out of 748 New York Power Plants | |
Ranked #1 out of 16 New York Landfill Gas Power Plants | |
Fuel Types | Landfill Gas |
Map of Seneca Energy
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Seneca Energy.
Monthly Net Generation for Seneca Energy
Seneca Energy Details
Summary Information | |
---|---|
Plant Name | Seneca Energy (54782) |
Plant Address | 2121 Route 414 Seneca Falls, NY 13148 |
Utility | Seneca Energy II (17283) |
Latitude, Longitude | 42.9281, -76.8408 |
Generation Dates on File | Jan 2001 to Mar 2024 |
Initial Operation Date | March 1996 |
Annual Generation | 88.3 GWh |
Fuel Types | Landfill Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 05-163-001 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | NPCC |
Balancing Authority | New York Independent System Operator (NYIS) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | town water |
Ash Impoundment | No |
Transmission / Distribution Owner | New York State Elec & Gas Corp (13511) NY |
Grid Voltage | 34.50 kV |
Energy Storage | No |
Generator GEN1 Details Operating March 1996
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.8 MW |
Minimum Load | 0.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | March 1996 |
Combined Heat & Power | No |
---|---|
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Other Planned Modifications | Yes |
Other Modifications | January 2023 |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GEN2 Details Operating March 1996
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.8 MW |
Minimum Load | 0.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | March 1996 |
Combined Heat & Power | No |
---|---|
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Other Planned Modifications | Yes |
Other Modifications | January 2023 |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GEN3 Details Operating March 1996
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.8 MW |
Minimum Load | 0.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | March 1996 |
Combined Heat & Power | No |
---|---|
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Other Planned Modifications | Yes |
Other Modifications | January 2023 |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GEN4 Details Operating August 1996
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.8 MW |
Minimum Load | 0.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | August 1996 |
Combined Heat & Power | No |
---|---|
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Other Planned Modifications | Yes |
Other Modifications | January 2023 |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GEN5 Details Operating August 1996
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.8 MW |
Minimum Load | 0.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | August 1996 |
Planned Retirement | March 2024 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GEN6 Details Operating June 1997
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.8 MW |
Minimum Load | 0.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 1997 |
Planned Retirement | March 2024 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GEN7 Details Operating June 1997
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.8 MW |
Minimum Load | 0.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 1997 |
Planned Retirement | March 2024 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GE10 Details Operating August 1998
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.8 MW |
Minimum Load | 0.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | August 1998 |
Planned Retirement | March 2024 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GE11 Details Operating August 1998
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.8 MW |
Minimum Load | 0.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | August 1998 |
Planned Retirement | March 2024 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GE12 Details Operating August 1998
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.8 MW |
Minimum Load | 0.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | August 1998 |
Planned Retirement | March 2024 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GE13 Details Operating August 1998
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.8 MW |
Minimum Load | 0.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | August 1998 |
Planned Retirement | March 2024 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GE14 Details Operating August 1998
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.8 MW |
Minimum Load | 0.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | August 1998 |
Planned Retirement | March 2024 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GEN8 Details Operating August 1998
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.8 MW |
Minimum Load | 0.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | August 1998 |
Planned Retirement | March 2024 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GEN9 Details Operating August 1998
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.8 MW |
Minimum Load | 0.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | August 1998 |
Planned Retirement | March 2024 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GE15 Details Operating January 2007
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1.6 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.6 MW |
Winter Capacity | 1.6 MW |
Minimum Load | 0.8 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | January 2007 |
Combined Heat & Power | No |
---|---|
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Other Planned Modifications | Yes |
Other Modifications | November 2023 |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GE16 Details Operating January 2007
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1.6 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.6 MW |
Winter Capacity | 1.6 MW |
Minimum Load | 0.8 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | January 2007 |
Combined Heat & Power | No |
---|---|
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Other Planned Modifications | Yes |
Other Modifications | November 2023 |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GE17 Details Operating January 2007
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1.6 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.6 MW |
Winter Capacity | 1.6 MW |
Minimum Load | 0.8 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | January 2007 |
Combined Heat & Power | No |
---|---|
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Other Planned Modifications | Yes |
Other Modifications | January 2023 |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GE18 Details Operating January 2007
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1.6 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.6 MW |
Winter Capacity | 1.6 MW |
Minimum Load | 0.8 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | January 2007 |
Combined Heat & Power | No |
---|---|
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Other Planned Modifications | Yes |
Other Modifications | January 2023 |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Seneca Energy Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Landfill Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#3 | Puente Hills Energy Recovery | Whittier, CA | 177.3 GWh |
#4 | Bowerman Power LFG, LLC | Irvine, CA | 168.2 GWh |
#5 | Sunshine Gas Producers | Sylmar, CA | 125.4 GWh |
#6 | Loraine County Project | Oberlin, OH | 111.6 GWh |
#7 | Middlesex County Utilities Authority | Sayreville, NJ | 100.9 GWh |
#8 | Liberty I & II LFGTE | Monticello, IN | 96.1 GWh |
#9 | Ameresco Ox Mountain | Half Moon Bay, CA | 93.6 GWh |
#10 | Omega Hills Gas Recovery | Germantown, WI | 93.0 GWh |
#11 | Pine Tree Acres WM LFGTE | Lenox, MI | 88.9 GWh |
#12 | Waste Management King George LFGTE | King George, VA | 88.4 GWh |
#14 | Ocean County Landfill | Manchester, NJ | 87.8 GWh |
#15 | Metro Methane Recovery Facility | Mitchellville, IA | 87.3 GWh |
#16 | Waste Management Columbia Ridge LFGTE | Arlington, OR | 85.2 GWh |
#17 | Ontario LFGTE | Stanley, NY | 84.4 GWh |
#18 | High Acres Gas Recovery | Fairport, NY | 79.3 GWh |
#19 | Pine Tree Acres | Lenox Twp, MI | 71.7 GWh |
#20 | Sumpter Energy Associates | Belleville, MI | 70.4 GWh |
#21 | Kiefer Landfill | Sloughhouse, CA | 69.7 GWh |
#22 | Livingston Generating Facility | Pontiac, IL | 67.5 GWh |
#23 | Potrero Hills Energy Producers | Suisun City, CA | 67.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Seneca Energy.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Canoga Solar | Seneca Falls, NY | 8.5 GWh | 5.6 mi |
Cornell Geneva Solar Farm | Seneca, NY | 3.2 GWh | 10.5 mi |
Donati Solar | Seneca Falls, NY | 2.0 GWh | 2.8 mi |
Finger Lakes Solar I | Geneva, NY | 3.4 GWh | 13 mi |
Greenidge Generation LLC | Dresden, NY | 585.7 GWh | 18.1 mi |
Henkel U.S. Operations Corporation | Geneva, NY | 1.3 GWh | 7.1 mi |
Hobart & William Smith College Gates Rd. | Geneva, NY | 3.1 GWh | 11.6 mi |
Musgrave East Solar Farm | Aurora, NY | 3.3 GWh | 16.3 mi |
Musgrave West Solar Farm | Aurora, NY | 3.1 GWh | 16.3 mi |
Ontario LFGTE | Stanley, NY | 84.4 GWh | 13.4 mi |
Route 14A CDG Solar North and South LLC | Geneva, NY | 6.9 GWh | 13 mi |
Sangolqui Solar | Seneca Falls, NY | 3.8 GWh | 3.1 mi |
Seneca Falls Hydroelectric Project | Seneca Falls, NY | 11.7 GWh | 2.9 mi |
State Route 14A Solar | Benton, NY | 6.7 GWh | 17.5 mi |
Strauss CSG | Geneva, NY | 3.8 GWh | 8.2 mi |
Union Springs 40 | Union Spring, NY | 8.5 GWh | 11.1 mi |
Union Springs 963 | Union Spring, NY | 6.1 GWh | 11.1 mi |
Victory Mills | Victory Mills, NY | 4.7 GWh | 14.8 mi |
Waterloo Hydroelectric Project | Waterloo, NY | 3.6 GWh | 2.1 mi |
Williamson | Williamson, NY | 1.9 GWh | 19.3 mi |