Seminole (FL)
State Highway 19, Palatka, FL 32708Plant Summary Information
Seminole (FL) is ranked #24 out of 2,254 natural gas power plants nationwide in terms of total annual net electricity generation.
Seminole (FL) is comprised of 4 generators and generated 3.1 TWh during the 3-month period between June 2024 to September 2024.
Plant Name | Seminole (FL) |
---|---|
Utility Name | Seminole Electric Cooperative Inc |
Location | Putnam County, FL |
Initial Operation Date | February 1984 |
Last Update | Sep 2024 |
Annual Generation | 11.1 TWh |
Annual Consumption | 90.1 M MMBtu |
Ranked #53 out of 11,852 Power Plants Nationwide | |
Ranked #24 out of 2,254 Natural Gas Power Plants Nationwide | |
Ranked #7 out of 279 Florida Power Plants | |
Ranked #7 out of 85 Florida Natural Gas Power Plants | |
Fuel Types | Natural Gas : 75.2% Bituminous Coal : 24.7% |
Map of Seminole (FL)
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Seminole (FL).
Monthly Net Generation for Seminole (FL)
Seminole (FL) Details
Summary Information | |
---|---|
Plant Name | Seminole (FL) (136) |
Plant Address | State Highway 19, Palatka, FL 32708 |
Utility | Seminole Electric Cooperative Inc (21554) |
Latitude, Longitude | 29.73306, -81.63278 |
Generation Dates on File | Jan 2001 to Sep 2024 |
Initial Operation Date | February 1984 |
Annual Generation | 11.1 TWh |
Fuel Types | Natural Gas : 75.2% Bituminous Coal : 24.7% |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | SERC |
Balancing Authority | Seminole Electric Cooperative (SEC) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | St Johns River |
Ash Impoundment | Yes Not Lined Operating |
Transmission / Distribution Owner | Seminole Electric Cooperative Inc (21554) |
Grid Voltage | 230.00 kV |
Energy Storage | No |
Natural Gas Information | |
Local Distribution Company (LDC) | Other - See pipeline notes. |
Pipeline Name | FLORIDA GAS TRANSMISSION COMPANY |
Pipeline Notes | Not shown in the list |
Natural Gas Storage | No |
Generator 2 Details Operating December 1984
Technology | Conventional Steam Coal |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 714.6 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 634 MW |
Winter Capacity | 640 MW |
Minimum Load | 300 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | December 1984 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
---|---|
Energy Source | Bituminous Coal |
Startup Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | OVER |
Pulverized Coal Technology | Yes |
Subcritical Technology | Yes |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator CT1 Details Operating April 2023
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | SCCF |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 384.2 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 355 MW |
Winter Capacity | 368.6 MW |
Minimum Load | 84 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | April 2023 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Generator CT2 Details Operating April 2023
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | SCCF |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 384.2 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 355 MW |
Winter Capacity | 368.6 MW |
Minimum Load | 84 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | April 2023 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Generator ST Details Operating April 2023
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | SCCF |
Ownership | Single Owner |
Duct Burners | Yes |
Nameplate Capacity | 414.8 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 394 MW |
Winter Capacity | 397.2 MW |
Minimum Load | 173 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | April 2023 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Seminole (FL) Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#14 | Hanging Rock Energy Facility | Ironton, OH | 9.6 TWh |
#15 | Warren County | Front Royal, VA | 9.3 TWh |
#16 | York Energy Center | Delta, PA | 9.0 TWh |
#17 | Fort Myers | Ft. Myers, FL | 9.0 TWh |
#18 | Sherwood H Smith Jr Energy Complex | Hamlet, NC | 8.8 TWh |
#19 | Lawrenceburg Power, LLC | Lawrenceburg, IN | 8.7 TWh |
#20 | Nine Mile Point | Westwego, LA | 8.7 TWh |
#21 | Sanford | DeBary, FL | 8.6 TWh |
#22 | South Field Energy | Wellsville, OH | 8.6 TWh |
#23 | Thomas A Smith Energy Facility | Dalton, GA | 8.5 TWh |
#25 | Wansley Combined Cycle | Franklin, GA | 8.3 TWh |
#26 | Hummel Station LLC | Shamokin Dam, PA | 8.3 TWh |
#27 | Moxie Freedom Generation Plant | Salem Township, PA | 7.9 TWh |
#28 | Brunswick County Power Station | Freeman, VA | 7.9 TWh |
#29 | Port Washington Generating Station | Port Washington, WI | 7.9 TWh |
#30 | McIntosh Combined Cycle Facility | Rincon, GA | 7.8 TWh |
#31 | Paradise | Drakesboro, KY | 7.8 TWh |
#32 | Indeck Niles Energy Center | Niles, MI | 7.8 TWh |
#33 | Fairless Energy Center | Fairless Hills, PA | 7.8 TWh |
#34 | Deer Park Energy Center | Deer Park, TX | 7.6 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Seminole (FL).
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Anhinga Solar Energy Center | Green Cove Springs, FL | 125.7 GWh | 10.6 mi |
Baptist Medical Center | Jacksonville, FL | 19.9 GWh | 40.2 mi |
Coral Farms Solar Energy Center | Florahome, FL | 116.0 GWh | 15.9 mi |
FPL Etonia Creek | Palatka, FL | 170.0 GWh | 9 mi |
Georgia-Pacific Palatka Operations | Palatka, FL | 320.3 GWh | 4.6 mi |
Greenland Energy Center | Jacksonville, FL | 550.6 GWh | 30.2 mi |
Hecate Energy Blair Road LLC | Jacksonville, FL | 6.4 GWh | 40.1 mi |
Horizon Solar Energy Center | Hawthorne, FL | 117.9 GWh | 26 mi |
IKEA Jacksonville Rooftop PV System | Jacksonville, FL | 2.2 GWh | 35.1 mi |
John R Kelly | Gainesville, FL | 603.3 GWh | 41.7 mi |
Magnolia Springs Solar Center | Green Cove Springs, FL | 143.5 GWh | 12 mi |
Old Plank Road Solar Farm, LLC | Jacksonville, FL | 5.7 GWh | 43.2 mi |
Solar Park Gainesville, LLC | Gainesville, FL | 1.5 GWh | 42.4 mi |
South Energy Center | Gainesville, FL | 44.0 GWh | 43 mi |
Terrill Creek | Green Cove Springs, FL | 126.2 GWh | 12.9 mi |
Trail Ridge Landfill Gas Recovery | Baldwin, FL | 25.2 GWh | 42 mi |
Trailside Solar Center | Elkton, FL | 133.8 GWh | 12.6 mi |
Twin Lakes | Interlachen, FL | 121.4 GWh | 15.2 mi |
Union Springs Solar Center | Lake Butler, FL | 145.7 GWh | 43.4 mi |
University of Florida | Gainesville, FL | 377.2 GWh | 43.4 mi |