SEMASS Resource Recovery is ranked #4 out of 59 non-biogenic municipal solid waste power plants nationwide in terms of total annual net electricity generation.
SEMASS Resource Recovery is comprised of 2 generators and generated 146.9 GWh during the 3-month period between May 2024 to August 2024.
Plant Name | SEMASS Resource Recovery |
---|---|
Utility Name | SEMASS Partnership |
Location | Plymouth County, MA |
Initial Operation Date | July 1988 |
Last Update | Aug 2024 |
Annual Generation | 567.6 GWh |
Annual Consumption | 11.6 M MMBtu |
Ranked #1,153 out of 11,835 Power Plants Nationwide | |
Ranked #4 out of 59 NON-Biogenic Municipal Solid Waste Power Plants Nationwide | |
Ranked #9 out of 598 Massachusetts Power Plants | |
Ranked #1 out of 5 Massachusetts NON-Biogenic Municipal Solid Waste Power Plants | |
Fuel Types | Non-biogenic Municipal Solid Waste : 54.2% Biogenic Municipal Solid Waste : 44.4% Natural Gas : 1.3% |
Map of SEMASS Resource Recovery
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for SEMASS Resource Recovery.
Monthly Net Generation for SEMASS Resource Recovery
SEMASS Resource Recovery Details
Summary Information | |
---|---|
Plant Name | SEMASS Resource Recovery (50290) |
Plant Address | 141 Cranberry Highway, West Wareham, MA 2576 |
Utility | SEMASS Partnership (16929) |
Latitude, Longitude | 41.8022, -70.7875 |
Generation Dates on File | Jan 2001 to Aug 2024 |
Initial Operation Date | July 1988 |
Annual Generation | 567.6 GWh |
Fuel Types | Non-biogenic Municipal Solid Waste : 54.2% Biogenic Municipal Solid Waste : 44.4% Natural Gas : 1.3% |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | NPCC |
Balancing Authority | ISO New England Inc. (ISNE) |
NAICS Code | Solid Waste Combustors and Incinerators (562213) |
Sector | Commercial Non-CHP (4) |
Water Source | Wells |
Ash Impoundment | No |
Transmission / Distribution Owner | NSTAR Electric Company (54913) MA |
Grid Voltage | 115.00 kV |
Energy Storage | No |
Natural Gas Information | |
Pipeline Name | Algonquin Gas Transmission Company |
Natural Gas Storage | No |
Generator GEN1 Details Operating July 1988
Technology | Municipal Solid Waste |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | SEMASS |
Nameplate Capacity | 64.5 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 53.3 MW |
Winter Capacity | 53.3 MW |
Minimum Load | 6 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | July 1988 |
---|---|
Combined Heat & Power | No |
Sector Name | Commercial Non-CHP (4) |
Energy Source | Municipal Solid Waste / Natural Gas / Distillate Fuel Oil |
Startup Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GEN2 Details Operating April 1993
Technology | Municipal Solid Waste |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | SEMASS |
Nameplate Capacity | 34 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 26.7 MW |
Winter Capacity | 26.7 MW |
Minimum Load | 9 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | April 1993 |
---|---|
Combined Heat & Power | No |
Sector Name | Commercial Non-CHP (4) |
Energy Source | Municipal Solid Waste / Natural Gas / Distillate Fuel Oil |
Startup Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
SEMASS Resource Recovery Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Non-biogenic Municipal Solid Waste.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1 | Covanta Fairfax Energy | Lorton, VA | 677.1 GWh |
#2 | Covanta Hempstead | Westbury, NY | 585.4 GWh |
#3 | Covanta Delaware Valley | Chester, PA | 569.3 GWh |
#5 | Palm Beach Renewable Energy Facility 2 | West Palm Beach, FL | 528.8 GWh |
#6 | Covanta Essex Company | Newark, NJ | 469.6 GWh |
#7 | Wheelabrator Bridgeport | Bridgeport, CT | 441.9 GWh |
#8 | Pinellas County Resource Recovery | St. Petersburg, FL | 420.7 GWh |
#9 | Wheelabrator South Broward | Ft. Lauderdale, FL | 413.1 GWh |
#10 | Wheelabrator Westchester | Peekskill, NY | 401.0 GWh |
#11 | Covanta Haverhill | Haverhill, MA | 342.0 GWh |
#12 | H Power | Kapolei, HI | 328.8 GWh |
#13 | Wheelabrator Baltimore Refuse | Baltimore, MD | 320.5 GWh |
#14 | Wheelabrator Millbury Facility | Millbury, MA | 319.9 GWh |
#15 | Palm Beach Renewable Energy Facility 1 | West Palm Beach, FL | 318.5 GWh |
#16 | Wheelabrator Falls | Morrisville, PA | 313.8 GWh |
#17 | Union County Resource Recovery | Rahway, NJ | 303.8 GWh |
#18 | Montgomery County Resource Recovery | Dickerson, MD | 280.6 GWh |
#19 | York County Resource Recovery | York, PA | 249.9 GWh |
#20 | Wheelabrator North Andover | North Andover, MA | 240.6 GWh |
#21 | Wheelabrator Saugus | Saugus, MA | 225.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding SEMASS Resource Recovery.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
0 Hammond St CSG | Carver, MA | 7.0 GWh | 3.2 mi |
160 Tihonet Rd Hybrid(CSG) | Wareham, MA | 9.8 GWh | 3.9 mi |
196 Tremont St(CSG) | Carver, MA | 3.7 GWh | 4.1 mi |
276 Federal Rd(CSG) | Carver, MA | 4.7 GWh | 3.2 mi |
299 Farm to Market Rd Hybrid(CSG) | Wareham, MA | 7.9 GWh | 3.2 mi |
59 Federal Rd(CSG) | Carver, MA | 12.8 GWh | 3.9 mi |
71 Charlotte Furnace Rd Hybrid(CSG) | Wareham, MA | 6.8 GWh | 2.4 mi |
77 Farm to Market Rd Hybrid(CSG) | Wareham, MA | 11.0 GWh | 3.3 mi |
Acushnet AD Makepeace | Wareham, MA | 5.8 GWh | 2.3 mi |
BWC Gibbs Brook | Wareham, MA | 6.6 GWh | 5.1 mi |
BWC Harlow Brook | Wareham, MA | 2.1 GWh | 5.2 mi |
BWC Wareham River | Wareham, MA | 1.8 GWh | 5 mi |
Cranberry Highway Solar LLC | Wareham, MA | 3.1 GWh | 2.4 mi |
Federal Road Solar 1, LLC CSG | South Carver, MA | 16.5 GWh | 3.2 mi |
Old Middleboro Road Solar | Rochester, MA | 9.7 GWh | 1.8 mi |
Rounseville Solar | Rochester, MA | 4.3 GWh | 4.9 mi |
Syncarpha Freetown | Freetown, MA | 6.6 GWh | 2.3 mi |
Tihonet Solar | Wareham, MA | 1.8 GWh | 3.5 mi |
Wareham MA 1 Community Solar | Wareham, MA | 3.1 GWh | 4.3 mi |
Wareham Solar PV | Wareham, MA | 1.2 GWh | 2.5 mi |