Searcy Solar Hybrid
TBD, Searcy, AR 72143Plant Summary Information
Searcy Solar Hybrid is ranked #26 out of 73 power plants in Arkansas in terms of total annual net electricity generation.
Searcy Solar Hybrid generated 70.0 GWh during the 3-month period between May 2024 to August 2024.
Plant Name | Searcy Solar Hybrid |
---|---|
Utility Name | Searcy Solar, LLC |
Location | White County, AR |
Initial Operation Date | January 2022 |
Last Update | Aug 2024 |
Annual Generation | 208.2 GWh |
Annual Consumption | 790.4 k MMBtu |
Ranked #2,254 out of 11,835 Power Plants Nationwide | |
Ranked #255 out of 5,643 Solar Power Plants Nationwide | |
Ranked #26 out of 73 Arkansas Power Plants | |
Ranked #4 out of 27 Arkansas Solar Power Plants | |
Fuel Types | Solar |
Map of Searcy Solar Hybrid
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Searcy Solar Hybrid.
Monthly Net Generation for Searcy Solar Hybrid
Searcy Solar Hybrid Details
Summary Information | |
---|---|
Plant Name | Searcy Solar Hybrid (62617) |
Plant Address | TBD, Searcy, AR 72143 |
Utility | Searcy Solar, LLC (62109) |
Latitude, Longitude | 35.233, -91.69 |
Generation Dates on File | Jan 2022 to Aug 2024 |
Initial Operation Date | January 2022 |
Annual Generation | 208.2 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | SERC |
Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Entergy Arkansas LLC (814) AR |
Grid Voltage | 161.00 kV |
Energy Storage | Yes |
Generator SEABT Details Operating January 2022
Technology | Batteries |
---|---|
Prime Mover | Battery |
Ownership | Single Owner |
Nameplate Capacity | 10 MW |
Summer Capacity | 10 MW |
Winter Capacity | 10 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 2022 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Electricity used for energy storage |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Energy Storage Details | |
Nameplate Energy Capacity MWH | 30 |
---|---|
Maximum Charge Rate | 10 MW |
Maximum Discharge Rate | 10 MW |
Storage Technology | LIB |
Nameplate Reactive Power Rating | 7.8 |
Storage Enclosure Type | CS |
System Peak Shaving | Yes |
Excess Wind And Solar Generation | P |
DC Coupled | Yes |
Direct Support Of Another Unit | Yes |
Direct Support Plant Id | 62617 |
Direct Support Gen Id | SEARC |
Support T D Asset | No |
Generator SEARC Details Operating January 2022
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 100 MW |
Summer Capacity | 100 MW |
Winter Capacity | 100 MW |
Minimum Load | 1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 2022 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Solar |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 90 |
DC Net Capacity | 145.2 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Searcy Solar Hybrid Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#245 | Butler Solar Project 103 | Butler, GA | 213.9 GWh |
#246 | Quinto Solar PV Project | Gustine, CA | 213.5 GWh |
#247 | Escalante Solar II, LLC | Milford, UT | 212.9 GWh |
#248 | Assembly Solar II LLC | Lennon, MI | 212.7 GWh |
#249 | Escalante Solar I, LLC | Milford, UT | 212.6 GWh |
#250 | Granite Mountain Solar East, LLC | Cedar City, UT | 211.2 GWh |
#251 | Chicot Solar | Lake Village, AR | 210.7 GWh |
#252 | Escalante Solar III, LLC | Milford, UT | 209.7 GWh |
#253 | Cutlass Solar 1 LLC | Richmond, TX | 209.1 GWh |
#254 | River Ferry Solar 1 | West Union, IL | 208.6 GWh |
#256 | Sigurd Solar LLC | Sigurd, UT | 207.6 GWh |
#257 | Taylor County Solar | Butler, GA | 206.7 GWh |
#258 | Galloway 2 Solar Farm | Paint Rock, TX | 206.0 GWh |
#259 | Hecate Energy Highland LLC | Buford, OH | 204.2 GWh |
#260 | Wagyu | Damon, TX | 202.2 GWh |
#261 | Holliday Creek Solar | Fort Dodge, IA | 202.0 GWh |
#262 | Clover Creek Solar Community Solar | Mona, UT | 200.0 GWh |
#263 | Point Beach Solar | Two Creeks, WI | 198.6 GWh |
#264 | Pioneer Solar (CO), LLC | Bennett, CO | 198.0 GWh |
#265 | SR Arlington II | Blakely, GA | 197.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Searcy Solar Hybrid.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Farmers Electric Cooperative | Newport, AR | 2.2 GWh | 37.7 mi |
FECC Solar Benton | Benton, AR | 1.1 GWh | 65 mi |
Forrest City- Eldridge Road | Forrest City, AR | 2.1 GWh | 51.7 mi |
Forrest City- Prison Site | Forrest City, AR | 2.1 GWh | 52.9 mi |
Greers Ferry Lake | Heber Springs, AR | 209.7 GWh | 26.3 mi |
Happy Solar 1 | Searcy, AR | 180.0 GWh | 4.8 mi |
Harry L. Oswald | Little Rock, AR | 941.0 GWh | 53.4 mi |
Independence Steam Electric Station | Newark, AR | 5.9 TWh | 34.6 mi |
Jonesboro City Water & Light Plant | Jonesboro, AR | 84.7 GWh | 68.9 mi |
Murray | North Little Rock, AR | 142.4 GWh | 48.3 mi |
Newport Solar Project | Newport, AR | 330.0 GWh | 41.3 mi |
Pine Bluff Energy Center | Pine Bluff, AR | 1.3 TWh | 71.2 mi |
Pine Bluff Mill | Pine Bluff, AR | 289.0 GWh | 71 mi |
Stuttgart Solar | Stuttgart, AR | 157.5 GWh | 56.6 mi |
Two Pine Landfill Gas Recovery | North Little Rock, AR | 26.5 GWh | 38.2 mi |
Whillock | Morrilton, AR | 135.3 GWh | 62.6 mi |
White Bluff | Redfield, AR | 2.8 TWh | 61.5 mi |
White River Lock and Dam 1 | Batesville, AR | 15.2 GWh | 36.4 mi |
White River Lock and Dam 2 | Locust Grove, AR | 15.2 GWh | 35.6 mi |
White River Lock and Dam 3 | Marcella, AR | 30.4 GWh | 43.1 mi |