Schiller
400 Gosling Rd., Portsmouth, NH 3801Plant Summary Information
Schiller is ranked #5 out of 12 jet fuel power plants nationwide in terms of total annual net electricity generation.
Schiller is comprised of 4 generators and generated 430.0 MWh during the 3-month period between May 2024 to August 2024.
Plant Name | Schiller |
---|---|
Utility Name | Granite Shore Power |
Location | Rockingham County, NH |
Initial Operation Date | October 1952 |
Last Update | Aug 2024 |
Annual Generation | 776.0 MWh |
Annual Consumption | 13.2 k MMBtu |
Ranked #10,876 out of 11,835 Power Plants Nationwide | |
Ranked #5 out of 12 Jet Fuel Power Plants Nationwide | |
Ranked #54 out of 56 New Hampshire Power Plants | |
Ranked #2 out of 3 New Hampshire Jet Fuel Power Plants | |
Fuel Types | Jet Fuel |
Previous Operator |
Public Service Co of NH (2013 to 2017) Granite Shore Power (2018 to 2023) |
Map of Schiller
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Schiller.
Monthly Net Generation for Schiller
Schiller Details
Summary Information | |
---|---|
Plant Name | Schiller (2367) |
Plant Address | 400 Gosling Rd., Portsmouth, NH 3801 |
Utility | Granite Shore Power (62032) |
Latitude, Longitude | 43.0978, -70.7842 |
Generation Dates on File | Jan 2001 to Aug 2024 |
Initial Operation Date | October 1952 |
Annual Generation | 776.0 MWh |
Fuel Types | Jet Fuel |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | NPCC |
Balancing Authority | ISO New England Inc. (ISNE) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | Piscataqua River |
Ash Impoundment | No |
Transmission / Distribution Owner | Public Service Co of NH (15472) NH |
Grid Voltage | 115.00 kV |
Energy Storage | No |
Generator 4 Details Out of Service October 1952
Technology | Conventional Steam Coal |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | 4002 Z_NewHampshire |
Nameplate Capacity | 50 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 47.5 MW |
Winter Capacity | 48 MW |
Minimum Load | 13 MW |
Uprate/Derate Completed | No |
Status | Out of Service |
First Operation Date | October 1952 |
Combined Heat & Power | No |
---|---|
Sector Name | IPP Non-CHP (2) |
Energy Source | Bituminous Coal / Residual Fuel Oil / Other Biomass Solids |
Startup Source | Distillate Fuel Oil / Natural Gas |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 12H |
Pulverized Coal Technology | Yes |
Subcritical Technology | Yes |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | No |
Multifuel Details | |
Cofire Energy Source | BIT / RFO |
---|
Generator 5 Details Out of Service May 1955
Technology | Wood/Wood Waste Biomass |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 50 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 43.1 MW |
Winter Capacity | 42.6 MW |
Minimum Load | 35 MW |
Uprate/Derate Completed | No |
Status | Out of Service |
First Operation Date | May 1955 |
Combined Heat & Power | No |
---|---|
Sector Name | IPP Non-CHP (2) |
Energy Source | Wood/Wood Waste Solids / Bituminous Coal |
Startup Source | Natural Gas |
Time From Cold Shutdown To Full Load | OVER |
Fluidized Bed Technology | Yes |
Pulverized Coal Technology | No |
Subcritical Technology | Yes |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | No |
Multifuel Details | |
Cofire Energy Source | WDS / BIT |
---|
Generator 6 Details Out of Service July 1957
Technology | Conventional Steam Coal |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 50 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 47.9 MW |
Winter Capacity | 48.6 MW |
Minimum Load | 13 MW |
Uprate/Derate Completed | No |
Status | Out of Service |
First Operation Date | July 1957 |
Combined Heat & Power | No |
---|---|
Sector Name | IPP Non-CHP (2) |
Energy Source | Bituminous Coal / Residual Fuel Oil / Other Biomass Solids |
Startup Source | Distillate Fuel Oil / Natural Gas |
Time From Cold Shutdown To Full Load | 12H |
Pulverized Coal Technology | Yes |
Subcritical Technology | Yes |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | No |
Multifuel Details | |
Cofire Energy Source | BIT / RFO |
---|
Generator GT1 Details Operating November 1970
Technology | Petroleum Liquids |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 21.2 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 17 MW |
Winter Capacity | 18 MW |
Minimum Load | 5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | November 1970 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Jet Fuel |
Startup Source | Natural Gas |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Schiller Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Jet Fuel.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1 | Dynegy Oakland Power Plant | Oakland, CA | 9.3 GWh |
#2 | Empire Energy Center | Sarcoxie, MO | 239.0 GWh |
#3 | State Line Combined Cycle | Joplin, MO | 2.7 TWh |
#4 | Merrimack | Bow, NH | 151.0 GWh |
#6 | White Lake | Tamworth, NH | 552.0 MWh |
#7 | Angoon | Angoon, AK | 1.8 GWh |
#8 | Kake | Kake, AK | 1.5 GWh |
#9 | Tunnel | Preston, CT | 11.9 GWh |
#10 | Hoonah | Hoonah, AK | 4.2 GWh |
#11 | Mt Storm | Mount Storm, WV | 3.5 TWh |
#12 | Peru (IL) | City of Peru, IL | 21.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Schiller.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Bashaw Solar CSG 1, LLC | Newbury, MA | 7.3 GWh | 21.9 mi |
DG Haverhill CSG | Haverhill, MA | 1.6 GWh | 25.7 mi |
Hampton Facility | Hampton, NH | 26.3 GWh | 11.4 mi |
Haverhill Solar Power Project | Haverhill, MA | 1.0 GWh | 26.9 mi |
Hunt Road Solar | Amesbury, MA | 6.9 GWh | 20.5 mi |
Ipswich Wind Turbine | Ipswich, MA | 3.1 GWh | 26.5 mi |
Kearsarge Amesbury Hybrid | Amesbury, MA | 5.1 GWh | 19.6 mi |
Merrimac Solar | Merrimac, MA | 2.2 GWh | 21.1 mi |
Milton Hydro | Milton, NH | 8.2 GWh | 23.4 mi |
Newington | Newington, NH | 861.3 GWh | 1.2 mi |
Newington | Newington, NH | 52.7 GWh | 0.4 mi |
Rollinsford | Rollinsford, NH | 4.0 GWh | 9.7 mi |
Salmon Falls | South Berwick, ME | 4.9 GWh | 9 mi |
Sanford Solar | Sanford, ME | 87.8 GWh | 24.8 mi |
Seabrook | Seabrook, NH | 10.9 TWh | 14.1 mi |
Somersworth Lower Great Dam | Somersworth, NH | 5.0 GWh | 11 mi |
True North | Salisbury, MA | 6.9 GWh | 18.2 mi |
Turnkey Landfill Gas Recovery | Rochester, NH | 44.8 GWh | 13.5 mi |
UNH 7.9 MW Plant | Durham, NH | 48.4 GWh | 8.1 mi |
Wells (ME) | Wells, ME | 8.3 GWh | 17.7 mi |