Scherer
10986 Highway 87, Juliette, GA 31046Plant Summary Information
Scherer is ranked #9 out of 132 coal plants nationwide in terms of total annual net electricity generation.
Scherer is comprised of 3 generators and generated 2.0 TWh during the 3-month period between June 2024 to September 2024.
Plant Name | Scherer |
---|---|
Utility Name | Georgia Power Co |
Location | Monroe County, GA |
Initial Operation Date | March 1982 |
Last Update | Sep 2024 |
Annual Generation | 7.0 TWh |
Annual Consumption | 88.1 M MMBtu |
Ranked #127 out of 11,852 Power Plants Nationwide | |
Ranked #9 out of 132 Subbituminous Coal Power Plants Nationwide | |
Ranked #8 out of 239 Georgia Power Plants | |
Ranked #1 out of 1 Georgia Subbituminous Coal Power Plants | |
Fuel Types | Subbituminous Coal : 99.9% |
Map of Scherer
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Scherer.
Monthly Net Generation for Scherer
Scherer Details
Summary Information | |
---|---|
Plant Name | Scherer (6257) |
Plant Address | 10986 Highway 87, Juliette, GA 31046 |
Utility | Georgia Power Co (7140) |
Latitude, Longitude | 33.0606, -83.8075 |
Generation Dates on File | Jan 2001 to Sep 2024 |
Initial Operation Date | March 1982 |
Annual Generation | 7.0 TWh |
Fuel Types | Subbituminous Coal : 99.9% |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | SERC |
Balancing Authority | Southern Company Services, Inc. - Trans (SOCO) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Lake Juliette |
Ash Impoundment | Yes Not Lined Operating |
Transmission / Distribution Owner | Georgia Power Co (7140) GA |
Grid Voltage | 500.00 kV |
Energy Storage | No |
Generator 1 Details Operating March 1982
Technology | Conventional Steam Coal |
---|---|
Prime Mover | Steam Turbine |
Ownership | Jointly Owned |
Nameplate Capacity | 891 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 860 MW |
Winter Capacity | 860 MW |
Minimum Load | 350 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | March 1982 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Subbituminous Coal |
Startup Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | OVER |
Pulverized Coal Technology | Yes |
Subcritical Technology | Yes |
Multiple Fuels | No |
Generator 2 Details Operating February 1984
Technology | Conventional Steam Coal |
---|---|
Prime Mover | Steam Turbine |
Ownership | Jointly Owned |
Nameplate Capacity | 891 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 860 MW |
Winter Capacity | 860 MW |
Minimum Load | 350 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | February 1984 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Subbituminous Coal |
Startup Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | OVER |
Pulverized Coal Technology | Yes |
Subcritical Technology | Yes |
Multiple Fuels | No |
Generator 3 Details Operating January 1987
Technology | Conventional Steam Coal |
---|---|
Prime Mover | Steam Turbine |
Ownership | Jointly Owned |
Nameplate Capacity | 891 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 860 MW |
Winter Capacity | 860 MW |
Minimum Load | 350 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | January 1987 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Subbituminous Coal |
Startup Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | OVER |
Pulverized Coal Technology | Yes |
Subcritical Technology | Yes |
Multiple Fuels | No |
Scherer Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
Dalton Utilities | 1200 V.D. Parrott Parkway, Dalton, GA 30720 | Generator 1 | 1.40% |
Georgia Power Co | P O Box 4545, Atlanta, GA 30302 | Generator 1 | 8.40% |
Municipal Electric Authority | 1470 Riveredge Parkway NW, Atlanta, GA 30328 | Generator 1 | 30.20% |
Oglethorpe Power Corporation | 2100 East Exchange Place, Tucker, GA 30084 | Generator 1 | 60.00% |
Dalton Utilities | 1200 V.D. Parrott Parkway, Dalton, GA 30720 | Generator 2 | 1.40% |
Georgia Power Co | P O Box 4545, Atlanta, GA 30302 | Generator 2 | 8.40% |
Municipal Electric Authority | 1470 Riveredge Parkway NW, Atlanta, GA 30328 | Generator 2 | 30.20% |
Oglethorpe Power Corporation | 2100 East Exchange Place, Tucker, GA 30084 | Generator 2 | 60.00% |
Georgia Power Co | P O Box 4545, Atlanta, GA 30302 | Generator 3 | 75.00% |
Gulf Power Co | One Energy Place, Pensacola, FL 32520 | Generator 3 | 25.00% |
Florida Power & Light Co | P O Box 29100, Miami, FL 33102 | Generator 4 | 76.40% |
JEA | 21 West Church St., Jacksonville, FL 32202 | Generator 4 | 23.60% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Subbituminous Coal.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1 | James H Miller Jr | Quinton, AL | 17.1 TWh |
#2 | Labadie | Labadie, MO | 15.5 TWh |
#3 | Martin Lake | Tatum, TX | 10.8 TWh |
#4 | Monroe (MI) | Monroe, MI | 12.9 TWh |
#5 | W A Parish | Thompsons, TX | 11.5 TWh |
#6 | Colstrip | Colstrip, MT | 9.2 TWh |
#7 | J H Campbell | West Olive, MI | 7.5 TWh |
#8 | Sherburne County | Becker, MN | 7.3 TWh |
#10 | Laramie River Station | Wheatland, WY | 7.0 TWh |
#11 | Fayette Power Project | La Grange, TX | 7.0 TWh |
#12 | Gerald Gentleman | Sutherland, NE | 6.8 TWh |
#13 | Baldwin Energy Complex | Baldwin, IL | 6.4 TWh |
#14 | Jim Bridger | Point of Rocks, WY | 8.3 TWh |
#15 | Springerville | Springerville, AZ | 6.3 TWh |
#16 | J K Spruce | San Antonio, TX | 6.1 TWh |
#17 | Nebraska City | Nebraska City, NE | 6.0 TWh |
#18 | Jeffrey Energy Center | St. Mary's, KS | 5.7 TWh |
#19 | La Cygne | La Cygne, KS | 5.7 TWh |
#20 | Independence Steam Electric Station | Newark, AR | 5.6 TWh |
#21 | Comanche (CO) | Pueblo, CO | 5.7 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Scherer.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
ADS Renewable Energy-Wolf Creek LLC | Dry Branch, GA | 17.7 GWh | 29.2 mi |
Bibb Jones | Macon, GA | 2.0 GWh | 19.8 mi |
Bibb Williams | Macob, GA | 321.0 MWh | 20.5 mi |
Edward L. Addison Generating Plant | Thomaston, GA | 200.2 GWh | 30.7 mi |
Georgia LFG Pine Ridge Plant | Griffin, GA | 40.0 GWh | 22.2 mi |
Lloyd Shoals | Jackson, GA | 70.3 GWh | 18.1 mi |
Piedmont Green Power | Barnesville, GA | 390.8 GWh | 18.4 mi |
Putnam Erickson | Eatonton, GA | 5.4 GWh | 29.9 mi |
Putnam Erikson 2 | Eatonton, GA | 5.7 GWh | 33 mi |
Riverwood International Macon Mill | Macon, GA | 359.3 GWh | 22.5 mi |
Robins | Robins AFB, GA | 331.0 MWh | 35.7 mi |
Robins Air Force Base Solar | Macon, GA | 190.7 GWh | 28.5 mi |
Sinclair Dam | Milledgeville, GA | 120.2 GWh | 35.5 mi |
Smarr Energy Center | Forsyth, GA | 155.7 GWh | 5.7 mi |
Tri-County Solar Facility | Eatonton, GA | 1.7 GWh | 29.6 mi |
Twiggs Solar | Dry Branch, GA | 421.1 GWh | 36.4 mi |
Upson County GA S1 LLC | Thomaston, GA | 5.1 GWh | 28.8 mi |
Upson Rocky Creek Solar Plant | Thomaston, GA | 1.1 GWh | 32.5 mi |
Wilkinson DeFore | Gordon, GA | 5.6 GWh | 31.8 mi |
Wilkinson DeFore | Gordon, GA | 4.6 GWh | 30.9 mi |