SCCCD - Fresno Community College

1101 E University Ave, Fresno, CA 93741

Plant Summary Information

SCCCD - Fresno Community College is ranked #460 out of 799 solar farms in California in terms of total annual net electricity generation.

SCCCD - Fresno Community College generated 634.0 MWh during the 3-month period between September 2023 to December 2023.

Plant NameSCCCD - Fresno Community College
Utility NameForefront Power, LLC
LocationFresno County, CA
Initial Operation DateOctober 2018
Last Update Dec 2023
Annual Generation 3.8 GWh
Annual Consumption 13.5 k MMBtu
Ranked #8,305 out of 11,835 Power Plants Nationwide
Ranked #3,265 out of 5,643 Solar Power Plants Nationwide
Ranked #1,160 out of 1,569 California Power Plants
Ranked #460 out of 799 California Solar Power Plants
Fuel Types Solar

Map of SCCCD - Fresno Community College

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for SCCCD - Fresno Community College.

Create Your Account Today

Monthly Net Generation for SCCCD - Fresno Community College

SCCCD - Fresno Community College Details

Summary Information
Plant NameSCCCD - Fresno Community College (63068)
Plant Address1101 E University Ave, Fresno, CA 93741
UtilityForefront Power, LLC (62856)
Latitude, Longitude36.76655, -119.79858
Generation Dates on FileJan 2019 to Dec 2023
Initial Operation DateOctober 2018
Annual Generation 3.8 GWh
Fuel Types Solar
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusYes
FERC Small Power Producer Docket Number18-1950-001
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusNon-Regulated
NERC RegionWECC
Balancing AuthorityCalifornia Independent System Operator (CISO)
NAICS CodeUtilities (22)
Sector IPP Non-CHP (2)
Water Source
Ash Impoundment No
Transmission / Distribution OwnerPacific Gas & Electric Co. (14328) CA
Grid Voltage 21.00 kV
Energy StorageNo

Generator 231 Details Operating October 2018

TechnologySolar Photovoltaic
Prime MoverPhotovoltaic
OwnershipSingle Owner
Nameplate Capacity2.2 MW
Summer Capacity2.2 MW
Winter Capacity2.2 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateOctober 2018
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceSolar
Multiple FuelsNo
Solar Details
Single Axis TrackingNo
Fixed TiltYes
Azimuth Angle180
Tilt Angle7
DC Net Capacity2.4 MW
Crystalline SiliconYes
Net Metering AgreementYes
Net Metering DC Capacity2.4 MW
Virtual Net Metering AgreementNo

SCCCD - Fresno Community College Plant Owners

Owner NameAddressOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Solar.

RankPlant NamePlant LocationAnnual Generation
#3255Route 76 Boone Solar 1Poplar Grove, IL3.8 GWh
#3256Rafael SolarSalem, OR3.8 GWh
#3257Briscoe 2ALostant, IL3.8 GWh
#3258Pivot Solar 3 LLC (CSG)Parachute, CO3.8 GWh
#3259Comer SolarComer, GA3.8 GWh
#3260Wonderful Huller & ShelllingLost Hills, CA3.8 GWh
#3261NHA at Mansfield NJWashington, NJ3.8 GWh
#3262Exeter SolarExeter, CA3.8 GWh
#3263HintonHinton, OK3.8 GWh
#3264Boring Solar LLCSandy, OR3.8 GWh
#3266Hendershot Solar, LLCTecumseh, MI3.8 GWh
#3267Pivot Solar 2 LLC (CSG)Brush, CO3.8 GWh
#3268FountainFountain, MN3.8 GWh
#3269Lowe Solar Energy StorageAsheboro, NC3.7 GWh
#3270Day Hill Solar, LLCEstacada, OR3.8 GWh
#3271Spencer Meadow Solar Energy StorageAsheboro, NC3.7 GWh
#3272City of BowieMitchellville, MD3.8 GWh
#3273Franklin Solar 2Louisburg, NC3.8 GWh
#3274SCE-Snowline-White Rd (Central)Phelan, CA3.8 GWh
#327520333 Normandie PV, LLCTorrance, CA3.8 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding SCCCD - Fresno Community College.

Plant NamePlant LocationAnnual GenerationDistance
Algonquin Power Sanger LLCSanger, CA5.5 GWh14.8 mi
Borden Solar FarmMadera, CA117.8 GWh15 mi
CA - Fresno County - Juvenile HallFresno, CA5.4 GWh8.3 mi
Clovis East High SchoolClovis, CA1.4 GWh9 mi
Clovis High SchoolClovis, CA1.3 GWh7.3 mi
Clovis North High SchoolFresno, CA1.4 GWh9.2 mi
CSU Fresno Solar ProjectFresno, CA1.1 GWh4.3 mi
Fresno Bullard High School HybridFresno, CA2.2 GWh3.7 mi
Fresno Hoover High School HybridFresno, CA2.1 GWh3.9 mi
Fresno Sunnyside High School HybridFresno, CA2.5 GWh5 mi
La Joya Del SolFresno, CA89.3 MWh6.1 mi
Malaga Power LLCFresno, CA10.5 GWh6.2 mi
National RaisinFowler, CA4.8 GWh12 mi
OK Produce Fresno CarportFresno, CA3.1 GWh3.3 mi
Pacific Ethanol Madera Solar ArrayMadera, CA1.4 GWh14.1 mi
POM Plant 1Del Rey, CA2.1 GWh14 mi
POM Plant 2Del Rey, CA292.0 MWh13.7 mi
Rio Bravo FresnoFresno, CA145.1 GWh6.8 mi
Saint Agnes Medical CenterFresno, CA26.1 GWh5 mi
SCCCD - Clovis Community CollegeFresno, CA2.0 GWh9 mi