Scattergood

12700 Vista Del Mar, Playa del Rey, CA 90293

Plant Summary Information

Scattergood is ranked #28 out of 1,579 power plants in California in terms of total annual net electricity generation.

Scattergood is comprised of 6 generators and generated 600.5 GWh during the 3-month period between November 2024 to February 2025.

Plant NameScattergood
Utility NameLos Angeles Department of Water & Power
LocationLos Angeles County, CA
Initial Operation DateDecember 1958
Last Update Feb 2025
Annual Generation 1.4 TWh
Annual Consumption 11.7 M MMBtu
Ranked #616 out of 11,993 Power Plants Nationwide
Ranked #387 out of 2,253 Natural Gas Power Plants Nationwide
Ranked #28 out of 1,579 California Power Plants
Ranked #24 out of 346 California Natural Gas Power Plants
Fuel Types Natural Gas

Map of Scattergood

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Scattergood.

Create Your Account Today

Monthly Net Generation for Scattergood

Scattergood Details

Summary Information
Plant NameScattergood (404)
Plant Address12700 Vista Del Mar, Playa del Rey, CA 90293
UtilityLos Angeles Department of Water & Power (11208)
Latitude, Longitude33.91815, -118.42765
Generation Dates on FileJan 2001 to Feb 2025
Initial Operation DateDecember 1958
Annual Generation 1.4 TWh
Fuel Types Natural Gas
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusNo
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusRegulated
NERC RegionWECC
Balancing AuthorityLos Angeles Department of Water and Power (LDWP)
NAICS CodeUtilities (22)
Sector Electric Utility (1)
Water SourcePacific Ocean
Ash Impoundment No
Transmission / Distribution OwnerLos Angeles Department of Water & Power (11208) CA
Grid Voltage 230.00 kV / 138.00 kV
Energy StorageNo
 
Natural Gas Information
Local Distribution Company (LDC)SOUTHERN CALIFORNIA GAS COMPANY
Natural Gas StorageNo

Generator 1 Details Operating December 1958

TechnologyNatural Gas Steam Turbine
Prime MoverSteam Turbine
OwnershipSingle Owner
RTO ISO LMP Node Designationnone
RTO ISO Location Designation For Reporting Wholesale Sales Datanone
Nameplate Capacity163.2 MW
Nameplate Power Factor0.85
Summer Capacity105 MW
Winter Capacity105 MW
Minimum Load40 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateDecember 1958
Planned RetirementDecember 2029
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceNatural Gas
Startup SourceNatural Gas
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full LoadOVER
Multiple FuelsNo
Cofire FuelsNo
Switch Between Oil And Natural GasNo

Generator 2 Details Operating July 1959

TechnologyNatural Gas Steam Turbine
Prime MoverSteam Turbine
OwnershipSingle Owner
RTO ISO LMP Node Designationnone
RTO ISO Location Designation For Reporting Wholesale Sales Datanone
Nameplate Capacity163.2 MW
Nameplate Power Factor0.85
Summer Capacity156.3 MW
Winter Capacity156.3 MW
Minimum Load40 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateJuly 1959
Planned RetirementDecember 2029
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceNatural Gas
Startup SourceNatural Gas
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full LoadOVER
Multiple FuelsNo
Cofire FuelsNo
Switch Between Oil And Natural GasNo

Generator 4 Details Operating October 2015

TechnologyNatural Gas Fired Combined Cycle
Prime MoverCombined Cycle Combustion Turbine Part
Unit CodeCC1
OwnershipSingle Owner
Can Bypass Heat Recovery Steam GeneratorNo
RTO ISO LMP Node Designationnone
RTO ISO Location Designation For Reporting Wholesale Sales Datanone
Nameplate Capacity216.9 MW
Nameplate Power Factor0.85
Summer Capacity206 MW
Winter Capacity206 MW
Minimum Load75 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateOctober 2015
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceNatural Gas
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load12H
Multiple FuelsNo
Cofire FuelsNo
Switch Between Oil And Natural GasNo

Generator 5 Details Operating November 2015

TechnologyNatural Gas Fired Combined Cycle
Prime MoverCombined Cycle Steam Part
Unit CodeCC1
OwnershipSingle Owner
Duct BurnersNo
RTO ISO LMP Node Designationnone
RTO ISO Location Designation For Reporting Wholesale Sales Datanone
Nameplate Capacity118.9 MW
Nameplate Power Factor0.85
Summer Capacity107 MW
Winter Capacity107 MW
Minimum Load65 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2015
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceNatural Gas
Startup SourceNatural Gas
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load12H
Multiple FuelsNo
Cofire FuelsNo
Switch Between Oil And Natural GasNo

Generator 6 Details Operating August 2015

TechnologyNatural Gas Fired Combustion Turbine
Prime MoverCombustion Turbine
OwnershipSingle Owner
RTO ISO LMP Node Designationnone
RTO ISO Location Designation For Reporting Wholesale Sales Datanone
Nameplate Capacity106.9 MW
Nameplate Power Factor0.85
Summer Capacity102 MW
Winter Capacity102 MW
Minimum Load28 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateAugust 2015
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceNatural Gas
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsNo
Cofire FuelsNo
Switch Between Oil And Natural GasNo

Generator 7 Details Operating September 2015

TechnologyNatural Gas Fired Combustion Turbine
Prime MoverCombustion Turbine
OwnershipSingle Owner
RTO ISO LMP Node Designationnone
RTO ISO Location Designation For Reporting Wholesale Sales Datanone
Nameplate Capacity106.9 MW
Nameplate Power Factor0.85
Summer Capacity102 MW
Winter Capacity102 MW
Minimum Load28 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateSeptember 2015
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceNatural Gas
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsNo
Cofire FuelsNo
Switch Between Oil And Natural GasNo

Scattergood Plant Owners

Owner NameAddressGeneratorOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Natural Gas.

RankPlant NamePlant LocationAnnual Generation
#377Pioneer Generation StationWilliston, ND1.5 TWh
#378Rockingham County CT StationReidsville, NC1.5 TWh
#379EdwardsportEdwardsport, IN3.2 TWh
#380Westlake PlaqueminePlaquemine, LA1.5 TWh
#381Motiva Enterprises Port Arthur RefineryPort Arthur, TX1.6 TWh
#382Emporia Energy CenterEmporia, KS1.4 TWh
#383Ennis Power Company LLCEnnis, TX1.4 TWh
#384Anadarko PlantAnadarko, OK1.4 TWh
#385UrquhartBeech Island, SC1.4 TWh
#386S O PurdomSt Marks, FL1.4 TWh
#388Riverside (OK)Jenks, OK1.4 TWh
#389NewingtonNewington, NH1.4 TWh
#390Manchester StreetProvidence, RI1.4 TWh
#391ShawvilleShawville, PA1.4 TWh
#392RivertonRiverton, KS1.3 TWh
#393Ocean State PowerHarrisville, RI1.3 TWh
#394Santa Rosa Energy CenterPace, FL1.3 TWh
#395Tait Electric Generating StationMoraine, OH1.3 TWh
#396Panoche Energy CenterFirebaugh, CA1.3 TWh
#397Crockett Cogen ProjectCrockett, CA1.3 TWh

Nearby Power Plants

Below are closest 20 power plants surrounding Scattergood.

Plant NamePlant LocationAnnual GenerationDistance
20333 Normandie PV, LLCTorrance, CA3.8 GWh8.8 mi
AES Redondo Beach LLCRedondo Beach, CA256.2 GWh5 mi
AT&T - GardenaGardena, CA8.7 GWh8.5 mi
AT&T - HawthorneHawthorne, CA5.8 GWh6.2 mi
Carson CogenerationCarson, CA34.8 GWh10.6 mi
Central Utilities Plant LAX 2Los Angeles, CA40.2 GWh2.2 mi
DirecTV - Los AngelesLos Angeles, CA7.0 GWh4.5 mi
Disney ProspectLos Angeles, CA7.6 GWh11.4 mi
El Segundo CogenEl Segundo, CA1.3 TWh1.6 mi
El Segundo Energy Center LLCEl Segundo, CA138.8 GWh0.5 mi
Equinix Douglas St. Fuel CellEl Segundo, CA8.1 GWh2.5 mi
Equinix Maple Ave. Fuel CellEl Segundo, CA7.8 GWh2 mi
Francisco St. SolarTorrance, CA1.8 GWh8.5 mi
Honda TorranceTorrance, CA762.0 MWh8.5 mi
Hyperion Treatment Plant CHP PlantPlaya del Rey, CA143.9 GWh0.5 mi
Lafayette 2 - MLK Jr. Hospital (MLK)Los Angeles, CA2.4 GWh10.8 mi
Torrance Refining Company, LLCTorrance, CA75.8 GWh7.2 mi
UCLA So Campus Cogen ProjectLos Angeles, CA178.0 GWh10.5 mi
USPS PVLos Angeles, CA10.8 GWh10.5 mi
Verizon-TorranceTorrance, CA5.8 GWh8.5 mi