8906 S. 35th Street, Bellevue, NE 68147Plant Summary Information
Sarpy County is ranked #30 out of 116 power plants in Nebraska in terms of total annual net electricity generation.
Sarpy County is comprised of 6 generators and generated 40.0 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Sarpy County |
---|---|
Utility Name | Omaha Public Power District |
Location | Sarpy County, NE |
Initial Operation Date | June 1972 |
Last Update | Dec 2023 |
Annual Generation | 161.8 GWh |
Annual Consumption | 2.3 M MMBtu |
Ranked #2,584 out of 11,866 Power Plants Nationwide | |
Ranked #800 out of 2,254 Natural Gas Power Plants Nationwide | |
Ranked #30 out of 116 Nebraska Power Plants | |
Ranked #4 out of 33 Nebraska Natural Gas Power Plants | |
Fuel Types | Natural Gas : 95.7% Distillate Fuel Oil : 4.3% |
Map of Sarpy County
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Sarpy County.
Monthly Net Generation for Sarpy County
Sarpy County Details
Summary Information | |
---|---|
Plant Name | Sarpy County (2292) |
Plant Address | 8906 S. 35th Street, Bellevue, NE 68147 |
Utility | Omaha Public Power District (14127) |
Latitude, Longitude | 41.17059, -95.9706 |
Generation Dates on File | Jan 2001 to Dec 2023 |
Initial Operation Date | June 1972 |
Annual Generation | 161.8 GWh |
Fuel Types | Natural Gas : 95.7% Distillate Fuel Oil : 4.3% |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | MRO |
Balancing Authority | Southwest Power Pool (SWPP) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Omaha Public Power District (14127) NE |
Grid Voltage | 161.00 kV |
Energy Storage | No |
Natural Gas Information | |
Local Distribution Company (LDC) | METROPOLITAN UTILITIES DIST OF OMAHA |
Natural Gas Storage | No |
Generator 1 Details Operating June 1972
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | SARPY_1 |
Nameplate Capacity | 55.4 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 54.9 MW |
Winter Capacity | 54.9 MW |
Minimum Load | 22 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 1972 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 54.9 MW |
Net Winter Capacity With Natural Gas | 54.9 MW |
Net Summer Capacity With Oil | 54.9 MW |
Net Winter Capacity With Oil | 54.9 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Generator 2 Details Operating June 1972
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | SARPY_2 |
Nameplate Capacity | 55.4 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 57.1 MW |
Winter Capacity | 57.1 MW |
Minimum Load | 22 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 1972 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 57.1 MW |
Net Winter Capacity With Natural Gas | 57.1 MW |
Net Summer Capacity With Oil | 57.1 MW |
Net Winter Capacity With Oil | 57.1 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Generator 3 Details Operating May 1996
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | SARPY_3 |
Nameplate Capacity | 106.3 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 107.8 MW |
Winter Capacity | 107.8 MW |
Minimum Load | 54 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | May 1996 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 107.8 MW |
Net Winter Capacity With Natural Gas | 107.8 MW |
Net Summer Capacity With Oil | 107.8 MW |
Net Winter Capacity With Oil | 107.8 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Generator BSD Details Standby May 1996
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 3.5 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 3.4 MW |
Winter Capacity | 3.4 MW |
Minimum Load | 3.4 MW |
Uprate/Derate Completed | No |
Status | Standby |
Synchronized To Transmission Grid | Yes |
First Operation Date | May 1996 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 4 Details Operating May 2000
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | SARPY_4 |
Nameplate Capacity | 58.9 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 48.7 MW |
Winter Capacity | 48.7 MW |
Minimum Load | 30 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | May 2000 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 48.7 MW |
Net Winter Capacity With Natural Gas | 48.7 MW |
Net Summer Capacity With Oil | 48.7 MW |
Net Winter Capacity With Oil | 48.7 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Generator 5 Details Operating May 2000
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | SARPY_5 |
Nameplate Capacity | 58.9 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 47.9 MW |
Winter Capacity | 47.9 MW |
Minimum Load | 24 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | May 2000 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 47.9 MW |
Net Winter Capacity With Natural Gas | 47.9 MW |
Net Summer Capacity With Oil | 47.9 MW |
Net Winter Capacity With Oil | 47.9 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Sarpy County Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#790 | Ashtabula | Ashtabula, OH | 165.4 GWh |
#791 | Solway CT | Solway, MN | 163.4 GWh |
#792 | Wallingford Energy | Wallingford, CT | 161.3 GWh |
#793 | Otsego Mill Power Plant | Otsego, MI | 161.2 GWh |
#794 | PE Berkeley | Berkeley, CA | 161.2 GWh |
#795 | Paris (WI) | Union Grove, WI | 160.2 GWh |
#796 | Toray Plastic America's CHP Plant | North Kingstown, RI | 157.3 GWh |
#797 | Lieberman | Mooringsport, LA | 155.8 GWh |
#798 | Smarr Energy Center | Forsyth, GA | 155.7 GWh |
#799 | North Omaha | Omaha, NE | 1.0 TWh |
#801 | Marsh Landing Generating Station | Antioch, CA | 154.6 GWh |
#802 | Westrock Hodge (LA) | Hodge, LA | 412.2 GWh |
#803 | NIH Cogeneration Facility | Bethesda, MD | 154.1 GWh |
#804 | Glenwood Landing | Glenwood Landing, NY | 154.4 GWh |
#805 | Dickerson Power | Dickerson, MD | 154.3 GWh |
#806 | Kenilworth Energy Facility | Kenilworth, NJ | 152.8 GWh |
#807 | SJRR Power LLC | Houston, TX | 152.2 GWh |
#808 | Frederickson | Tacoma, WA | 159.6 GWh |
#809 | Limon Generating Station | Limon, CO | 153.7 GWh |
#810 | Marquette Energy Center | Marquette, MI | 152.6 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Sarpy County.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Archer Daniels Midland Lincoln | Lincoln, NE | 9.0 GWh | 39.6 mi |
Cass County | Plattsmouth, NE | 210.4 GWh | 15.4 mi |
Elk City Station | Bennington, NE | 48.7 GWh | 20.8 mi |
Farmers City Wind LLC | Tarkio, MO | 239.9 GWh | 47.3 mi |
Fort Calhoun Community Solar | Fort Calhoun, NE | 10.0 GWh | 19.8 mi |
Harlan | Harlan, IA | 6.0 MWh | 47.2 mi |
J Street | Lincoln, NE | 4.5 GWh | 46 mi |
Jones Street | Omaha, NE | 11.2 GWh | 6.1 mi |
Lon Wright | Fremont, NE | 521.6 GWh | 31.1 mi |
Missouri River Wastewater Treatment | Omaha, NE | 12.8 GWh | 3.1 mi |
Nebraska City | Nebraska City, NE | 5.9 TWh | 39.3 mi |
North Omaha | Omaha, NE | 1.0 TWh | 11 mi |
Papillion Creek Wastewater | Bellevue, NE | 6.5 GWh | 8.3 mi |
Platteview Solar LLC | Ashland, NE | 95.0 GWh | 21.3 mi |
Salt Valley Wind Plant | Lincoln, NE | 2.0 GWh | 38.7 mi |
Shenandoah | Shenandoah, IA | 78.0 MWh | 41.5 mi |
Terry Bundy Generating Station | Lincoln, NE | 149.6 GWh | 38 mi |
Wahoo | Wahoo, NE | 58.0 MWh | 33.4 mi |
Walnut Wind Farm | Walnut, IA | 538.1 GWh | 42.7 mi |
Walter Scott Jr Energy Center | Council Bluffs, IA | 5.7 TWh | 6.8 mi |