Saratoga Wind Farm
TBD, Lime Springs, IA 52155Plant Summary Information
Saratoga Wind Farm is ranked #57 out of 123 wind farms in Iowa in terms of total annual net electricity generation.
Saratoga Wind Farm generated 49.6 GWh during the 3-month period between May 2024 to August 2024.
Plant Name | Saratoga Wind Farm |
---|---|
Utility Name | Madison Gas & Electric Co |
Location | Howard County, IA |
Initial Operation Date | February 2019 |
Last Update | Aug 2024 |
Annual Generation | 275.0 GWh |
Annual Consumption | 988.9 k MMBtu |
Ranked #1,925 out of 11,835 Power Plants Nationwide | |
Ranked #578 out of 1,343 Wind Power Plants Nationwide | |
Ranked #71 out of 271 Iowa Power Plants | |
Ranked #57 out of 123 Iowa Wind Power Plants | |
Fuel Types | Wind |
Previous Operator |
Saratoga Wind Energy LLC (2016 to 2017) Madison Gas & Electric Co (2018 to 2023) |
Map of Saratoga Wind Farm
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Saratoga Wind Farm.
Monthly Net Generation for Saratoga Wind Farm
Saratoga Wind Farm Details
Summary Information | |
---|---|
Plant Name | Saratoga Wind Farm (61070) |
Plant Address | TBD, Lime Springs, IA 52155 |
Utility | Madison Gas & Electric Co (11479) |
Latitude, Longitude | 43.44886, -92.28073 |
Generation Dates on File | Feb 2019 to Aug 2024 |
Initial Operation Date | February 2019 |
Annual Generation | 275.0 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | MRO |
Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Southern Minnesota Mun P Agny (40580) IA |
Grid Voltage | 161.00 kV |
Energy Storage | No |
Generator SWE Details Operating February 2019
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
RTO ISO LMP Node Designation | ALTW.SARATOGA |
RTO ISO Location Designation For Reporting Wholesale Sales Data | ALTW.SARATOGA |
Nameplate Capacity | 66 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 66 MW |
Winter Capacity | 66 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | February 2019 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Wind |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Turbines/Hydrokinetic Buoys | 33 |
Other Planned Modifications | No |
Multiple Fuels | No |
Turbine Details | |
Number Of Turbines | 33 |
---|---|
Predominant Turbine Manufacturer | Vestas |
Predominant Turbine Model Number | V116-2.1 |
Design Wind Speed | 17.2 MPH |
Wind Quality Class | 3 - Low Wind |
Turbine Hub Height Feet | 308 |
Saratoga Wind Farm Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#568 | New Creek Wind | New Creek, WV | 284.9 GWh |
#569 | Mountain View I & II | North Palm Springs, CA | 284.6 GWh |
#570 | Twin Buttes II Wind | Lamar, CO | 283.1 GWh |
#571 | Crane Creek Wind Energy Center | Riceville, IA | 282.2 GWh |
#572 | Wheatridge 1 | Lexington, OR | 280.2 GWh |
#573 | Tatanka Wind Power LLC | Ashley, ND | 279.3 GWh |
#574 | Northwest Ohio Wind | Haviland, OH | 281.0 GWh |
#575 | Tuscola Wind II LLC | Reese, MI | 277.0 GWh |
#576 | Campbell Hill Windpower | Glenrock, WY | 276.4 GWh |
#577 | Shiloh III Wind Project LLC | Birds Landing, CA | 275.6 GWh |
#579 | Beethoven Wind | Tripp, SD | 274.5 GWh |
#580 | Clearwater Wind II | Miles City, MT | 274.4 GWh |
#581 | Top of the World Windpower Project | Glenrock, WY | 272.5 GWh |
#582 | Sendero | Hebbronville, TX | 272.5 GWh |
#583 | Smoky Hills Wind Project Phase I | Lincoln, KS | 272.0 GWh |
#584 | Blue Canyon Windpower V LLC | Carnegie, OK | 272.0 GWh |
#585 | Prairie Breeze II | Elgin, NE | 270.4 GWh |
#586 | Broken Bow Wind II, LLC | Broken Bow, NE | 270.1 GWh |
#587 | Eight Point Wind | Rexville, NY | 269.9 GWh |
#588 | Bull Creek Wind | O'Donnell, TX | 269.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Saratoga Wind Farm.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Adams Wind Farm | Adams, MN | 29.3 GWh | 23.4 mi |
Alliant SBD 9206 Donaldson | Cresco, IA | 3.9 MWh | 9 mi |
Buffalo Center Wind LLC | Little Cedar, IA | 5.0 GWh | 24.4 mi |
Chickasaw Wind Farm | New Hampton, IA | 363.3 GWh | 21.4 mi |
Crane Creek Wind Energy Center | Riceville, IA | 282.2 GWh | 10.3 mi |
Fountain | Fountain, MN | 3.8 GWh | 21.9 mi |
Grand Meadow | Dexter, MN | 325.9 GWh | 28.3 mi |
Hazel | Lanesboro, MN | 5.5 GWh | 28.3 mi |
Lanesboro | Lanesboro, MN | 3.0 MWh | 24.1 mi |
Luther College Wind Project | Decorah, IA | 10.0 MWh | 25.1 mi |
Maple City | Osage Township, IA | 2.9 GWh | 28.2 mi |
Mower County Wind Energy Center | Grand Meadow, MN | 316.0 GWh | 19.6 mi |
New Hampton | New Hampton, IA | 2.4 GWh | 26.3 mi |
Osage (IA) | Osage, IA | 3.8 GWh | 29.1 mi |
Pioneer Prairie Wind Farm | McIntire, IA | 831.2 GWh | 16.8 mi |
Pleasant Valley (MN) | Dexter, MN | 104.1 GWh | 31.5 mi |
Prairie Star Wind Farm | Grand Meadow, MN | 259.1 GWh | 23.9 mi |
Preston (MN) | Preston, MN | 130.0 MWh | 18 mi |
Spring Valley | Spring Valley, MN | 149.0 MWh | 17.4 mi |
Turtle Creek Wind Farm LLC | St. Ansgar, IA | 708.3 GWh | 28.1 mi |