Santan
1005 S. Val Vista Drive, Gilbert, AZ 85296Plant Summary Information
Santan is ranked #3 out of 150 power plants in Arizona in terms of total annual net electricity generation.
Santan is comprised of 9 generators and generated 1.7 TWh during the 3-month period between December 2023 to March 2024.
Plant Name | Santan |
---|---|
Utility Name | Salt River Project |
Location | Maricopa County, AZ |
Initial Operation Date | October 1974 |
Last Update | Mar 2024 |
Annual Generation | 6.5 TWh |
Annual Consumption | 49.8 M MMBtu |
Ranked #159 out of 11,249 Power Plants Nationwide | |
Ranked #68 out of 2,188 Natural Gas Power Plants Nationwide | |
Ranked #3 out of 150 Arizona Power Plants | |
Ranked #1 out of 33 Arizona Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Map of Santan
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Santan.
Monthly Net Generation for Santan
Santan Details
Summary Information | |
---|---|
Plant Name | Santan (8068) |
Plant Address | 1005 S. Val Vista Drive Gilbert, AZ 85296 |
Utility | Salt River Project (16572) |
Latitude, Longitude | 33.3325, -111.7503 |
Generation Dates on File | Jan 2001 to Mar 2024 |
Initial Operation Date | October 1974 |
Annual Generation | 6.5 TWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | WECC |
Balancing Authority | Salt River Project (SRP) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Eastern Canal (SRP) |
Ash Impoundment | No |
Transmission / Distribution Owner | Salt River Project (16572) AZ |
Grid Voltage | 230.00 kV / 69.00 kV |
Energy Storage | No |
Natural Gas Information | |
Pipeline Name |
Other - Please explain in pipeline notes below. |
Pipeline Notes | Transwestern Pipeline Company El Paso Natural Gas Co. LLC. |
Natural Gas Storage | No |
Generator ST1 Details Operating October 1974
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Single Shaft |
Ownership | Single Owner |
Duct Burners | No |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 103.5 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 92 MW |
Winter Capacity | 103.5 MW |
Minimum Load | 80 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | October 1974 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Other Planned Modifications | No |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator ST3 Details Operating October 1974
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Single Shaft |
Ownership | Single Owner |
Duct Burners | No |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 103.5 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 92 MW |
Winter Capacity | 103.5 MW |
Minimum Load | 80 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | October 1974 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Other Planned Modifications | No |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator ST2 Details Operating December 1974
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Single Shaft |
Ownership | Single Owner |
Duct Burners | No |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 103.5 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 92 MW |
Winter Capacity | 103.5 MW |
Minimum Load | 80 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | December 1974 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Other Planned Modifications | No |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator ST4 Details Operating May 1975
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Single Shaft |
Ownership | Single Owner |
Duct Burners | No |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 103.5 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 92 MW |
Winter Capacity | 103.5 MW |
Minimum Load | 80 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | May 1975 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Other Planned Modifications | No |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator ST5A Details Operating April 2005
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | STS5 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | Yes |
Nameplate Capacity | 153.8 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 151 MW |
Winter Capacity | 203 MW |
Minimum Load | 90 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | April 2005 |
Combined Heat & Power | No |
---|---|
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Other Planned Modifications | Yes |
Other Modifications | December 2023 |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator ST5B Details Operating April 2005
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | STS5 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | Yes |
Nameplate Capacity | 153.8 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 151 MW |
Winter Capacity | 203 MW |
Minimum Load | 90 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | April 2005 |
Combined Heat & Power | No |
---|---|
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Other Planned Modifications | Yes |
Other Modifications | December 2023 |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator ST5S Details Operating April 2005
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | STS5 |
Ownership | Single Owner |
Duct Burners | Yes |
Nameplate Capacity | 314.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 280 MW |
Winter Capacity | 318 MW |
Minimum Load | 60 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | April 2005 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Other Planned Modifications | No |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator ST6A Details Operating March 2006
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | STS6 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | Yes |
Nameplate Capacity | 153.8 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 151 MW |
Winter Capacity | 195 MW |
Minimum Load | 90 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | March 2006 |
Combined Heat & Power | No |
---|---|
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Other Planned Modifications | Yes |
Other Modifications | December 2024 |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator ST6S Details Operating March 2006
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | STS6 |
Ownership | Single Owner |
Duct Burners | Yes |
Nameplate Capacity | 136.1 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 126 MW |
Winter Capacity | 135 MW |
Minimum Load | 45 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | March 2006 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Other Planned Modifications | No |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Santan Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#58 | P L Bartow | St. Petersburg, FL | 6.8 TWh |
#59 | Jack County | Bridgeport, TX | 6.8 TWh |
#60 | Dania Beach 7 | Ft. Lauderdale, FL | 6.6 TWh |
#61 | Marcus Hook Energy LP | Marcus Hook, PA | 6.6 TWh |
#62 | Acadia Energy Center | Eunice, LA | 6.6 TWh |
#63 | Hamilton Liberty | Towanda, PA | 6.6 TWh |
#64 | Lee Combined Cycle Plant | Goldsboro, NC | 6.6 TWh |
#65 | W S Lee | Williamston, SC | 6.6 TWh |
#66 | Cottonwood Energy Project | Deweyville, TX | 6.5 TWh |
#67 | Hickory Run Energy Station | New Castle, PA | 6.5 TWh |
#69 | Waterford Power, LLC | Waterford, OH | 6.5 TWh |
#70 | Taft Cogeneration Facility | Hahnville, LA | 6.5 TWh |
#71 | E B Harris Electric Generating Plant | Autaugaville, AL | 6.5 TWh |
#72 | Magnolia Power Plant | Ashland, MS | 6.4 TWh |
#73 | Allen | Memphis, TN | 6.3 TWh |
#74 | H L Culbreath Bayside Power Station | Tampa, FL | 6.3 TWh |
#75 | Polk | Mulberry, FL | 6.3 TWh |
#76 | Lamar Power Project | Paris, TX | 6.3 TWh |
#77 | Linden Cogen Plant | Linden, NJ | 6.3 TWh |
#78 | Lake Road Generating Plant | Dayville, CT | 6.2 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Santan.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Arizona State University CHP | Tempe, AZ | 44.6 GWh | 11.8 mi |
AZ State University - Tempe Campus Solar | Tempe, AZ | 2.8 GWh | 12.1 mi |
Gilbert Solar Facility I, LLC | Gilbert, AZ | 3.1 GWh | 3.4 mi |
Intel - Ocotillo Campus Solar | Chandler, AZ | 9.6 GWh | 10.3 mi |
Jewish Community Center PV | Scottsdale, AZ | 2.3 GWh | 21.2 mi |
Kyrene | Tempe, AZ | 1.2 TWh | 10.8 mi |
Mesa Carport PV | Mesa, AZ | 8.8 GWh | 8.6 mi |
Mormon Flat | Apache Junction, AZ | 69.9 GWh | 23.4 mi |
Ocotillo | Tempe, AZ | 794.7 GWh | 11.2 mi |
Paradise Valley H.S. PV | Phoenix, AZ | 2.5 GWh | 25.7 mi |
Phoenix Airport East Economy Lot | Phoenix, AZ | 1.3 GWh | 15.2 mi |
Phoenix Airport Rental Car Center | Phoenix, AZ | 4.6 GWh | 18.3 mi |
Poseidon Solar, LLC | Globe, AZ | 54.7 GWh | 19.4 mi |
Queen Creek Solar Farm | Queen Creek, AZ | 46.3 GWh | 9.2 mi |
Sandstone Solar | Florence, AZ | 122.0 GWh | 27.6 mi |
South Consolidated | Phoenix, AZ | 29.0 MWh | 9.4 mi |
Stewart Mountain | Phoenix, AZ | 32.8 GWh | 20.3 mi |
T0588 Phoenix - AZ | Phoenix, AZ | 2.7 GWh | 28.1 mi |
Union HS at Casa Grande | Casa Grande, AZ | 3.0 GWh | 27.3 mi |
West Phoenix | Phoenix, AZ | 3.3 TWh | 24.7 mi |