Sanford Solar
29 Baker Lane, Sanford, ME 4073Plant Summary Information
Sanford Solar is ranked #32 out of 123 power plants in Maine in terms of total annual net electricity generation.
Sanford Solar generated 20.7 GWh during the 3-month period between December 2023 to March 2024.
Plant Name | Sanford Solar |
---|---|
Utility Name | Sanford Airport Solar, LLC |
Location | York County, ME |
Initial Operation Date | November 2020 |
Last Update | Mar 2024 |
Annual Generation | 95.4 GWh |
Annual Consumption | 325.5 k MMBtu |
Ranked #3,187 out of 11,249 Power Plants Nationwide | |
Ranked #535 out of 5,158 Solar Power Plants Nationwide | |
Ranked #32 out of 123 Maine Power Plants | |
Ranked #2 out of 32 Maine Solar Power Plants | |
Fuel Types | Solar |
Map of Sanford Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Sanford Solar.
Monthly Net Generation for Sanford Solar
Sanford Solar Details
Summary Information | |
---|---|
Plant Name | Sanford Solar (63667) |
Plant Address | 29 Baker Lane Sanford, ME 4073 |
Utility | Sanford Airport Solar, LLC (63374) |
Latitude, Longitude | 43.4569, -70.7803 |
Generation Dates on File | Nov 2020 to Mar 2024 |
Initial Operation Date | November 2020 |
Annual Generation | 95.4 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | pending |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | NPCC |
Balancing Authority | ISO New England Inc. (ISNE) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Central Maine Power Co (3266) ME |
Grid Voltage | 115.00 kV |
Energy Storage | No |
Generator SAS Details Operating November 2020
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 49.4 MW |
Summer Capacity | 49.4 MW |
Winter Capacity | 49.4 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | November 2020 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Fixed Tilt | No |
Azimuth Angle | 180 |
Tilt Angle | 25 |
DC Net Capacity | 70.8 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Sanford Solar Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#525 | River Ferry Solar 1 | West Union, IL | 99.0 GWh |
#526 | Hazlehurst II | Hazlehurst, GA | 98.4 GWh |
#527 | Pike Solar Hybrid | Fountain, CO | 97.0 GWh |
#528 | Manatee Solar Energy Center | Parrish, FL | 66.2 GWh |
#529 | ID Solar | Kuna, ID | 96.3 GWh |
#530 | Nevada Solar One | Boulder City, NV | 98.0 GWh |
#531 | Lake Hancock Solar | Bartow, FL | 95.9 GWh |
#532 | Fox Creek Solar | Louisburg, NC | 95.9 GWh |
#533 | OCI Alamo Solar I Hybrid | San Antonio, TX | 95.5 GWh |
#534 | Galloway 2 Solar Farm | Paint Rock, TX | 95.5 GWh |
#536 | SR McKellar | Denmark, TN | 95.3 GWh |
#537 | Waipio Solar | Waipio, HI | 94.4 GWh |
#538 | Bell Ridge Solar | Trenton, FL | 94.1 GWh |
#539 | Sunnybrook Solar Project - Hybrid | Scottsburg, VA | 92.4 GWh |
#540 | Hattiesburg Solar Farm | Hattiesburg, MS | 91.4 GWh |
#541 | Bronco Plains Wind II, LLC | Kit Carson, CO | 200.9 GWh |
#542 | Sycamore Solar | Gretna, VA | 91.1 GWh |
#543 | Lost Hills/Blackwell | Lost Hills, CA | 91.1 GWh |
#544 | Chestnut | Lemoore, CA | 86.4 GWh |
#545 | Gulf Coast Solar Center III | Bellview, FL | 90.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Sanford Solar.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Acton | Acton, ME | 4.7 GWh | 8.9 mi |
Baldwin | West Baldwin, ME | 8.4 GWh | 23.3 mi |
Bonny Eagle | Hollis, ME | 43.0 GWh | 18 mi |
Cape Gas Turbine | Portland, ME | 349.7 MWh | 29.3 mi |
Hiram | Hiram, ME | 41.5 GWh | 27.3 mi |
Milton Hydro | Milton, NH | 7.1 GWh | 11 mi |
Newington | Newington, NH | 824.8 GWh | 24.4 mi |
Newington | Newington, NH | 107.3 GWh | 24.7 mi |
North Gorham | Gorham, ME | 9.3 GWh | 29 mi |
Regional Waste Systems | Portland, ME | 89.3 GWh | 26.2 mi |
Rollinsford | Rollinsford, NH | 5.3 GWh | 15.4 mi |
S D Warren Westbrook | Westbrook, ME | 17.8 GWh | 26.6 mi |
Salmon Falls | South Berwick, ME | 1.1 GWh | 16 mi |
Schiller | Portsmouth, NH | 587.0 MWh | 24.8 mi |
Skelton | Dayton, ME | 117.2 GWh | 13.6 mi |
Somersworth Lower Great Dam | Somersworth, NH | 1.8 GWh | 14.5 mi |
Turnkey Landfill Gas Recovery | Rochester, NH | 46.9 GWh | 17.6 mi |
UNH 7.9 MW Plant | Durham, NH | 56.8 GWh | 23.5 mi |
West Buxton | Buxton, ME | 23.9 GWh | 17 mi |
Westbrook Energy Center Power Plant | Westbrook, ME | 2.9 TWh | 24.6 mi |