Sandy River Solar (CSG)
TBD, Sandy, OR 97055Plant Summary Information
Sandy River Solar (CSG) is ranked #109 out of 114 solar farms in Oregon in terms of total annual net electricity generation.
Sandy River Solar (CSG) generated 103.0 MWh during the 3-month period between September 2022 to December 2022.
Plant Name | Sandy River Solar (CSG) |
---|---|
Utility Name | Sandy River Solar, LLC |
Location | Clackamas County, OR |
Initial Operation Date | December 2022 |
Last Update | Dec 2022 |
Annual Generation | 103.0 MWh |
Annual Consumption | 351 MMBtu |
Ranked #10,899 out of 11,249 Power Plants Nationwide | |
Ranked #5,112 out of 5,158 Solar Power Plants Nationwide | |
Ranked #247 out of 254 Oregon Power Plants | |
Ranked #109 out of 114 Oregon Solar Power Plants | |
Fuel Types | Solar |
Map of Sandy River Solar (CSG)
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Sandy River Solar (CSG).
Monthly Net Generation for Sandy River Solar (CSG)
Sandy River Solar (CSG) Details
Summary Information | |
---|---|
Plant Name | Sandy River Solar (CSG) (65750) |
Plant Address | TBD Sandy, OR 97055 |
Utility | Sandy River Solar, LLC (65007) |
Latitude, Longitude | 45.43106, -122.29516 |
Generation Dates on File | Dec 2022 to Dec 2022 |
Initial Operation Date | December 2022 |
Annual Generation | 103.0 MWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 17-1036-000 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | Portland General Electric Company (PGE) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Portland General Electric Co (15248) OR |
Grid Voltage | 12.47 kV |
Energy Storage | No |
Generator SR22 Details Operating December 2022
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 1.9 MW |
Summer Capacity | 1.9 MW |
Winter Capacity | 1.9 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | December 2022 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
DC Net Capacity | 2.4 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Sandy River Solar (CSG) Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#5102 | Laredo Bus Facility Solar Canopies | Decatur, GA | 128.5 MWh |
#5103 | NSE Astoria - Skyward | Boring, OR | 128.0 MWh |
#5104 | La Joya Del Sol | Fresno, CA | 127.1 MWh |
#5105 | Merck Rahway Power Plant | Rahway, NJ | 46.2 GWh |
#5106 | Ramona Solar Energy | Ramona, CA | 122.5 MWh |
#5107 | Amazon MDW6 Solar Project | Romeoville, IL | 122.0 MWh |
#5108 | Sikorsky Aircraft CHP | Stratford, CT | 77.0 GWh |
#5109 | Urtica Solar Project | Ellensburg, WA | 112.0 MWh |
#5110 | 196 Tremont St(CSG) | Carver, MA | 106.0 MWh |
#5111 | Framingham State University Plant | Framingham, MA | 127.0 MWh |
#5113 | Tooele Army Depot(CSG) | Tooele, UT | 2.2 GWh |
#5114 | Pivot Solar 2 LLC (CSG) | Brush, CO | 99.0 MWh |
#5115 | Crafton Hills College Solar Farm | Yucaipa, CA | 97.8 MWh |
#5116 | Cosper Creek Solar (CSG) | Willamina, OR | 94.0 MWh |
#5117 | Laskin Solar | Hoyt Lakes, MN | 90.0 MWh |
#5118 | Carnes Creek Solar (CSG) | Salem, OR | 83.0 MWh |
#5119 | Pivot Solar 14 LLC (CSG) | Brush, CO | 79.0 MWh |
#5120 | CPG - Duke 5300A Holabird | Baltimore, MD | 79.0 MWh |
#5121 | M. G. Emmett J. Bean Federal Center | Indianapolis, IN | 74.0 MWh |
#5122 | Edison Farm | Eden, NC | 72.0 MWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Sandy River Solar (CSG).
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Bonneville | Cascade Locks, OR | 4.0 TWh | 22.6 mi |
Boring Solar LLC | Sandy, OR | 3.9 GWh | 0.5 mi |
Brightwood Solar, LLC | Sandy, OR | 11.3 GWh | 10.7 mi |
Colton Solar | Molalla, OR | 3.6 GWh | 20 mi |
Day Hill Solar, LLC | Estacada, OR | 3.8 GWh | 11.3 mi |
Dunn Road Solar | Sandy, OR | 3.2 GWh | 0.4 mi |
Duus Solar, LLC | Estacada, OR | 17.6 GWh | 6.2 mi |
Firwood Solar, LLC | Sandy, OR | 18.7 GWh | 6 mi |
North Fork | Estacada, OR | 219.7 GWh | 13 mi |
NSE Astoria - Skyward | Boring, OR | 128.0 MWh | 1.2 mi |
Oregon Convention Center | Portland, OR | 1.7 GWh | 19.1 mi |
PHP 1 | Sandy, OR | 53.5 GWh | 10.9 mi |
PHP 2 | Sandy, OR | 39.9 GWh | 7.1 mi |
River Mill | Estacada, OR | 113.0 GWh | 9.4 mi |
SSD Clackamas 1, LLC | Boring, OR | 6.9 GWh | 2 mi |
SSD Clackamas 7, LLC | Molalla, OR | 3.8 GWh | 22.4 mi |
Sullivan | West Linn, OR | 134.4 GWh | 16.6 mi |
SulusSolar17 | Oregon City, OR | 4.2 GWh | 8.8 mi |
SulusSolar29 | Boring, OR | 3.7 GWh | 2 mi |
Tickle Creek Solar | Sandy, OR | 3.0 GWh | 4.1 mi |