San Diego - NCRC at Vista
325 S. Melrose Dr, Vista, CA 92083Plant Summary Information
San Diego - NCRC at Vista is ranked #545 out of 799 solar farms in California in terms of total annual net electricity generation.
San Diego - NCRC at Vista generated 573.0 MWh during the 3-month period between September 2023 to December 2023.
Plant Name | San Diego - NCRC at Vista |
---|---|
Utility Name | California PV Energy 3, LLC |
Location | San Diego County, CA |
Initial Operation Date | March 2021 |
Last Update | Dec 2023 |
Annual Generation | 2.8 GWh |
Annual Consumption | 10.0 k MMBtu |
Ranked #9,164 out of 11,852 Power Plants Nationwide | |
Ranked #4,002 out of 5,655 Solar Power Plants Nationwide | |
Ranked #1,263 out of 1,570 California Power Plants | |
Ranked #545 out of 799 California Solar Power Plants | |
Fuel Types | Solar |
Map of San Diego - NCRC at Vista
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for San Diego - NCRC at Vista.
Monthly Net Generation for San Diego - NCRC at Vista
San Diego - NCRC at Vista Details
Summary Information | |
---|---|
Plant Name | San Diego - NCRC at Vista (64049) |
Plant Address | 325 S. Melrose Dr, Vista, CA 92083 |
Utility | California PV Energy 3, LLC (63667) |
Latitude, Longitude | 33.19028, -117.25558 |
Generation Dates on File | Mar 2021 to Dec 2023 |
Initial Operation Date | March 2021 |
Annual Generation | 2.8 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | San Diego Gas & Electric Co (16609) CA |
Grid Voltage | 12.00 kV |
Energy Storage | No |
Generator NCRC Details Operating March 2021
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 1.8 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 1.8 MW |
Winter Capacity | 1.8 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | March 2021 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 178 |
Tilt Angle | 7 |
DC Net Capacity | 2 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | Yes |
Net Metering DC Capacity | 2 MW |
Virtual Net Metering Agreement | No |
San Diego - NCRC at Vista Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#3992 | Temple Solar Arrays | Reading, PA | 2.8 GWh |
#3993 | Chittenden County Solar Partners | South Burlington, VT | 2.8 GWh |
#3994 | Nickel 1 Solar Facility | Lost Hills, CA | 2.8 GWh |
#3995 | Atlantic City Convention Center | Atlantic City, NJ | 2.8 GWh |
#3996 | Lawrence Brook | Morristown, VT | 2.8 GWh |
#3997 | Carver MA 1 Community Solar | Carver, MA | 2.8 GWh |
#3998 | Greenville CSG | Port Jervis, NY | 2.8 GWh |
#3999 | Upper Marlboro 1 CSG | Upper Marlboro, MD | 2.8 GWh |
#4000 | Weston Landfill Solar | Weston, MA | 2.8 GWh |
#4001 | White Plains_RFP-Gedney Way Landfill | White Plains, NY | 2.8 GWh |
#4003 | Columbia Bryson | Grovetown, GA | 2.8 GWh |
#4004 | Panda Solar NC 7, LLC | Faison, NC | 2.8 GWh |
#4005 | Wakefern Food Corp | Keasbey, NJ | 2.8 GWh |
#4006 | Gifford CSG | Schenectady, NY | 2.8 GWh |
#4007 | Clif Bar Bakery of Twin Falls | Twin Falls, ID | 2.8 GWh |
#4008 | Washington St Community Solar Farm #3 | Ogden, NY | 2.8 GWh |
#4009 | Whistling Winds DPC Solar | New Lisbon, WI | 2.8 GWh |
#4010 | Citizens Agawam Landfill Solar | Agawam, MA | 2.8 GWh |
#4011 | Source Power Company - Richland | Richland, NY | 2.8 GWh |
#4012 | Kingsburg Solar | Kingsburg, CA | 2.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding San Diego - NCRC at Vista.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Bear Valley | Escondido, CA | 2.7 GWh | 13.9 mi |
CalPeak Power Enterprise Peaker Plant | Escondido, CA | 5.5 GWh | 9.3 mi |
Carlsbad Energy Center | Carlsbad, CA | 254.2 GWh | 5.7 mi |
Encina Water Pollution Control | Carlsbad, CA | 14.2 GWh | 6.4 mi |
Escondido Energy Center | Escondido, CA | 23.3 GWh | 9.2 mi |
GEN005 Antibody Fuel Cell | Oceanside, CA | 16.3 GWh | 2.9 mi |
Genentech-Oceanside Hybrid | Oceanside, CA | 5.0 GWh | 2.9 mi |
Gilead Oceanside Solar Project | Oceanside, CA | 2.3 GWh | 3.2 mi |
Goal Line LP | Escondido, CA | 13.1 GWh | 10.3 mi |
Life Technologies Carlsbad | Carlsbad, CA | 7.6 GWh | 4.1 mi |
NLP Granger | Valley Center, CA | 6.1 GWh | 12.6 mi |
Orange Grove Peaking Facility | Pala, CA | 18.1 GWh | 14.3 mi |
Palomar Energy | Escondido, CA | 1.2 TWh | 9.3 mi |
Red Mountain | Fallbrook, CA | 23.1 GWh | 14.6 mi |
SDCWA - Twin Oaks | San Marcos, CA | 117.0 MWh | 5.1 mi |
Vallecitos Water District | San Marcos, CA | 3.4 GWh | 4.8 mi |
Valley Center | Valley Center, CA | 3.5 GWh | 14.1 mi |
Valley Center 1 | Valley Center, CA | 3.9 GWh | 15 mi |
Valley Center 2 | Valley Center, CA | 6.8 GWh | 15 mi |
Watkins Manufacturing Co. | San Diego, CA | 4.9 GWh | 3.4 mi |