Salt Fork Wind Project, LLC
12124 I-40, Clarendon, TX 79226Plant Summary Information
Salt Fork Wind Project, LLC is ranked #61 out of 218 wind farms in Texas in terms of total annual net electricity generation.
Salt Fork Wind Project, LLC generated 134.9 GWh during the 3-month period between June 2024 to September 2024.
Plant Name | Salt Fork Wind Project, LLC |
---|---|
Utility Name | Southern Power Co |
Location | Donley County, TX |
Initial Operation Date | December 2016 |
Last Update | Sep 2024 |
Annual Generation | 688.3 GWh |
Annual Consumption | 2.5 M MMBtu |
Ranked #988 out of 11,852 Power Plants Nationwide | |
Ranked #202 out of 1,345 Wind Power Plants Nationwide | |
Ranked #170 out of 754 Texas Power Plants | |
Ranked #61 out of 218 Texas Wind Power Plants | |
Fuel Types | Wind |
Map of Salt Fork Wind Project, LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Salt Fork Wind Project, LLC.
Monthly Net Generation for Salt Fork Wind Project, LLC
Salt Fork Wind Project, LLC Details
Summary Information | |
---|---|
Plant Name | Salt Fork Wind Project, LLC (60657) |
Plant Address | 12124 I-40, Clarendon, TX 79226 |
Utility | Southern Power Co (17650) |
Latitude, Longitude | 35.18172, -100.93441 |
Generation Dates on File | Dec 2016 to Sep 2024 |
Initial Operation Date | December 2016 |
Annual Generation | 688.3 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | EG16-112-000 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Cross Texas Transmission (60065) |
Grid Voltage | 345.00 kV |
Energy Storage | No |
Generator GEN1 Details Operating December 2016
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 174 MW |
Summer Capacity | 174 MW |
Winter Capacity | 174 MW |
Minimum Load | 2 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 2016 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Wind |
Turbines/Hydrokinetic Buoys | 87 |
Multiple Fuels | No |
Turbine Details | |
Number Of Turbines | 87 |
---|---|
Predominant Turbine Manufacturer | Vestas |
Predominant Turbine Model Number | V100-2.0 |
Design Wind Speed | 20.3 MPH |
Wind Quality Class | 2 - Medium Wind |
Turbine Hub Height Feet | 262.4 |
Salt Fork Wind Project, LLC Plant Owners
Owner Name | Address | Ownership |
---|---|---|
Saltfork Wind, LLC | 30 Ivan Allen Jr. Blvd, NW, Atlanta, GA 30308 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#192 | Waverly Wind Farm LLC | Waverly, KS | 712.0 GWh |
#193 | Turtle Creek Wind Farm LLC | St. Ansgar, IA | 710.0 GWh |
#194 | Pryor Mountain Wind | Bridger, MT | 706.1 GWh |
#195 | West Raymond Wind Farm LLC | Lyford, TX | 706.0 GWh |
#196 | Panther Creek Wind Farm Three | Big Spring, TX | 699.7 GWh |
#197 | Appaloosa Run Wind | Rankin, TX | 697.8 GWh |
#198 | Caney River Wind Project | Howard, KS | 696.1 GWh |
#199 | Pattern Gulf Wind | Armstrong, TX | 694.1 GWh |
#200 | Broadview Energy JN, LLC | Texico, NM | 693.6 GWh |
#201 | Klondike Windpower III | Wasco, OR | 692.4 GWh |
#203 | Hidalgo Wind Farm LLC | McCook, TX | 687.8 GWh |
#204 | Jayhawk Wind Energy Center | Hepler, KS | 685.5 GWh |
#205 | Bright Stalk Wind Farm I | Chenoa, IL | 684.5 GWh |
#206 | Rattlesnake Den | Garden City, TX | 681.4 GWh |
#207 | Cedar Creek Wind | Grover, CO | 681.0 GWh |
#208 | Reading Wind Project | Reading, KS | 680.1 GWh |
#209 | Tucannon River Wind Farm | Dayton, WA | 678.5 GWh |
#210 | Pyron Wind Farm LLC Hybrid | Hermleigh, TX | 674.5 GWh |
#211 | Big Sky Wind LLC | Ohio, IL | 674.7 GWh |
#212 | Cross Winds Energy Park | Unionville, MI | 669.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Salt Fork Wind Project, LLC.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Black Hawk Station | Borger, TX | 1.4 TWh | 42.8 mi |
Borger Plant | Borger, TX | 45.6 GWh | 43.7 mi |
Briscoe Wind Farm | Silverton, TX | 414.6 GWh | 54.6 mi |
Colbeck's Corner, LLC | Groom, TX | 845.6 GWh | 15.1 mi |
Elk City LLC | Sweetwater, OK | 506.2 GWh | 61.6 mi |
Engineered Carbons Borger Cogen | Borger, TX | 40.5 GWh | 43.7 mi |
Goodnight | Claude, TX | 381.6 GWh | 22.9 mi |
Grandview Wind Farm, LLC | Panhandle, TX | 901.5 GWh | 21.6 mi |
Harrington | Amarillo, TX | 2.3 TWh | 46.6 mi |
Llano Estacado Wind Ranch | White Deer, TX | 101.6 GWh | 26.7 mi |
Longhorn Wind | Silverton, TX | 776.8 GWh | 62.8 mi |
Majestic 1 Wind Farm | Panhandle, TX | 345.1 GWh | 36.6 mi |
Majestic II Wind | Panhandle, TX | 180.7 GWh | 39 mi |
Miami Wind Energy Center | Miami, TX | 905.2 GWh | 39.5 mi |
Nichols | Amarillo, TX | 1.2 TWh | 46.4 mi |
Pantex | Amarillo, TX | 21.0 GWh | 35.1 mi |
Pattern Panhandle Wind 2 LLC | Panhandle, TX | 595.1 GWh | 30.6 mi |
Pattern Panhandle Wind LLC | Panhandle, TX | 553.8 GWh | 24.7 mi |
Route 66 Wind Plant | Panhandle, TX | 614.8 GWh | 28.3 mi |
UL Advanced Wind Turbine Test Facility | Canyon, TX | 7.9 GWh | 50.3 mi |