Salt City Solar Project - Hybrid
TBD, Circleville, OH 45601Plant Summary Information
Salt City Solar Project - Hybrid is ranked #12 out of 53 solar farms in Ohio in terms of total annual net electricity generation.
Salt City Solar Project - Hybrid generated 34.8 GWh during the 3-month period between June 2024 to September 2024.
Plant Name | Salt City Solar Project - Hybrid |
---|---|
Utility Name | Salt City Solar LLC |
Location | Ross County, OH |
Initial Operation Date | May 2023 |
Last Update | Sep 2024 |
Annual Generation | 100.1 GWh |
Annual Consumption | 367.0 k MMBtu |
Ranked #3,178 out of 11,852 Power Plants Nationwide | |
Ranked #606 out of 5,655 Solar Power Plants Nationwide | |
Ranked #57 out of 183 Ohio Power Plants | |
Ranked #12 out of 53 Ohio Solar Power Plants | |
Fuel Types | Solar |
Map of Salt City Solar Project - Hybrid
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Salt City Solar Project - Hybrid.
Monthly Net Generation for Salt City Solar Project - Hybrid
Salt City Solar Project - Hybrid Details
Summary Information | |
---|---|
Plant Name | Salt City Solar Project - Hybrid (65302) |
Plant Address | TBD, Circleville, OH 45601 |
Utility | Salt City Solar LLC (64607) |
Latitude, Longitude | 39.41473, -82.96285 |
Generation Dates on File | Jul 2023 to Sep 2024 |
Initial Operation Date | May 2023 |
Annual Generation | 100.1 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | RFC |
Balancing Authority | PJM Interconnection, LLC (PJM) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | NA |
Ash Impoundment | |
Transmission / Distribution Owner | Ohio Power Co (14006) OH |
Grid Voltage | 138.00 kV |
Energy Storage | Yes |
Generator SOLAR Details Operating May 2023
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 49.9 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 49.9 MW |
Winter Capacity | 49.9 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | May 2023 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
DC Net Capacity | 68 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Salt City Solar Project - Hybrid Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#596 | Airport Solar | Lakeview, OR | 102.4 GWh |
#597 | Iris Solar LLC | Franklinton, LA | 102.2 GWh |
#598 | Five Points Solar Park | Five Points, CA | 102.0 GWh |
#599 | Foothills Solar Plant Hybrid | Yuma, AZ | 101.5 GWh |
#600 | Pitts Dudik Solar | Hubbard, TX | 101.3 GWh |
#601 | Bullock Solar, LLC | Manson, NC | 101.0 GWh |
#602 | Meherrin Solar | Skippers, VA | 100.8 GWh |
#603 | Paddock Solar | Beloit, WI | 100.8 GWh |
#604 | Highest Power Solar, LLC | Louisburg, NC | 100.2 GWh |
#605 | Titan Solar | Deer Trail, CO | 100.2 GWh |
#607 | Monroe Solar Facility | Monroe, NC | 100.1 GWh |
#608 | Innovative Solar 54 | Kinston, NC | 99.7 GWh |
#609 | Assembly Solar Project | Venice Township, MI | 99.6 GWh |
#610 | Brantley Solar | Spring Hope, NC | 99.5 GWh |
#611 | Honeysuckle Solar Farm | New Carlisle, IN | 99.5 GWh |
#612 | Hawthorne Creek | TBD, FL | 99.3 GWh |
#613 | Cane Creek | Pachuta, MS | 98.9 GWh |
#614 | Pearl Solar | Fort Stockton, TX | 98.8 GWh |
#615 | Stanly Solar, LLC | Albemarle, NC | 98.7 GWh |
#616 | Orion I Solar Project | Burlington, TX | 98.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Salt City Solar Project - Hybrid.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Big Plain Solar, LLC | London, OH | 402.1 GWh | 36.1 mi |
CU Solar Plant | Cedarville, OH | 2.1 GWh | 50.8 mi |
Darby Power, LLC | Mt Sterling, OH | 557.3 GWh | 23.6 mi |
Denison Solar Array | Granville, OH | 2.3 GWh | 51.3 mi |
Dodge Park Engine No 1 | Columbus, OH | 4.9 MWh | 37.2 mi |
Fox Squirrel Solar | Mt Sterling, OH | 462.1 GWh | 33 mi |
Greenup Hydro | Franklin Furnace, OH | 262.2 GWh | 53.3 mi |
Hecate Energy Highland LLC | Buford, OH | 260.6 GWh | 50.8 mi |
Hillcrest Solar | Mt. Orab, OH | 377.4 GWh | 55.6 mi |
IGS CMH4, LLC | Madison, OH | 2.6 GWh | 41.1 mi |
Madison Fields Solar Project, LLC | Irwin, OH | 310.1 GWh | 54.3 mi |
New Market Solar | Sardinia, OH | 66.3 GWh | 50.5 mi |
Pixelle Specialty Solutions LLC - Chillicothe Facility | Chillicothe, OH | 207.8 GWh | 6.3 mi |
PS ST-8 Engine No 1 | Columbus, OH | 3.0 MWh | 38 mi |
Renick Run Pumping Station 03-04 | Columbus, OH | 1.0 MWh | 35.7 mi |
Rolling Hills Generating | Wilkesville, OH | 2.3 TWh | 40.7 mi |
ST-1/1A Engine No 1 | Columbus, OH | 2.0 MWh | 37.1 mi |
Suburban Landfill Gas Recovery | Glenford, OH | 30.5 GWh | 51.4 mi |
Willowbrook Solar I, LLC | Morystown, OH | 28.8 GWh | 48.1 mi |
Yellowbud Solar, LLC | Williamsport, OH | 501.3 GWh | 8.2 mi |