Saguaro Power

435 4th Street, Henderson, NV 89015

Plant Summary Information

Saguaro Power is ranked #43 out of 109 power plants in Nevada in terms of total annual net electricity generation.

Saguaro Power is comprised of 3 generators and generated 195.7 GWh during the 3-month period between June 2024 to September 2024.

Plant NameSaguaro Power
Utility NameSaguaro Power Co
LocationClark County, NV
Initial Operation DateSeptember 1991
Last Update Sep 2024
Annual Generation 213.3 GWh
Annual Consumption 2.5 M MMBtu
Ranked #2,241 out of 11,852 Power Plants Nationwide
Ranked #727 out of 2,254 Natural Gas Power Plants Nationwide
Ranked #43 out of 109 Nevada Power Plants
Ranked #14 out of 17 Nevada Natural Gas Power Plants
Fuel Types Natural Gas

Map of Saguaro Power

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Saguaro Power.

Create Your Account Today

Monthly Net Generation for Saguaro Power

Saguaro Power Details

Summary Information
Plant NameSaguaro Power (54271)
Plant Address435 4th Street, Henderson, NV 89015
UtilitySaguaro Power Co (16553)
Latitude, Longitude36.0417, -115.0117
Generation Dates on FileJan 2001 to Sep 2024
Initial Operation DateSeptember 1991
Annual Generation 213.3 GWh
Fuel Types Natural Gas
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusYes
FERC Cogeneration Docket Number90-203-000, 90-203-001, 90-203-002, 90-203-003
FERC Small Power Producer StatusNo
FERC Exempt Wholesale Generator StatusYes
FERC Exempt Wholesale Generator Docket Number00-60-000
Regulatory Information
Regulatory StatusNon-Regulated
NERC RegionWECC
Balancing AuthorityNevada Power Company (NEVP)
NAICS CodeUtilities (22)
Sector IPP CHP (3)
Water SourceOlin Chlor Alkali
Ash Impoundment No
Transmission / Distribution OwnerNevada Power Co (13407) NV
Grid Voltage 138.00 kV
Energy StorageNo
 
Natural Gas Information
Local Distribution Company (LDC)SOUTHWEST GAS CORPORATION
Pipeline Name KERN RIVER GAS TRANSMISSION CO
Natural Gas StorageNo

Generator CTG1 Details Operating September 1991

TechnologyNatural Gas Fired Combined Cycle
Prime MoverCombined Cycle Combustion Turbine Part
Unit CodeCC1
OwnershipWholly Owned by Other Entity
Can Bypass Heat Recovery Steam GeneratorNo
Nameplate Capacity45.1 MW
Nameplate Power Factor0.85
Summer Capacity36 MW
Winter Capacity38 MW
Minimum Load33 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateSeptember 1991
Planned RetirementDecember 2032
Combined Heat & Power Yes
Sector NameIPP CHP (3)
Topping Or BottomingT
Energy SourceNatural Gas / Distillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsYes
Cofire FuelsYes
Switch Between Oil And Natural GasYes
Multifuel Details
Cofire Energy SourceNG / DFO
Switch When OperatingYes
Net Summer Capacity With Natural Gas36 MW
Net Winter Capacity With Natural Gas38 MW
Net Summer Capacity With Oil36 MW
Net Winter Capacity With Oil35 MW
Time To Switch From Gas To Oil1H
Time To Switch From Oil To Gas1H
Factors That Limit SwitchingYes
Air Permit LimitsYes

Generator CTG2 Details Operating September 1991

TechnologyNatural Gas Fired Combined Cycle
Prime MoverCombined Cycle Combustion Turbine Part
Unit CodeCC1
OwnershipWholly Owned by Other Entity
Can Bypass Heat Recovery Steam GeneratorNo
Nameplate Capacity45.1 MW
Nameplate Power Factor0.85
Summer Capacity36 MW
Winter Capacity38 MW
Minimum Load33 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateSeptember 1991
Planned RetirementDecember 2032
Combined Heat & Power Yes
Sector NameIPP CHP (3)
Topping Or BottomingT
Energy SourceNatural Gas / Distillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsYes
Cofire FuelsYes
Switch Between Oil And Natural GasYes
Multifuel Details
Cofire Energy SourceNG / DFO
Switch When OperatingYes
Net Summer Capacity With Natural Gas36 MW
Net Winter Capacity With Natural Gas38 MW
Net Summer Capacity With Oil36 MW
Net Winter Capacity With Oil35 MW
Time To Switch From Gas To Oil1H
Time To Switch From Oil To Gas1H
Factors That Limit SwitchingYes
Air Permit LimitsYes

Generator STG Details Operating September 1991

TechnologyNatural Gas Fired Combined Cycle
Prime MoverCombined Cycle Steam Part
Unit CodeCC1
OwnershipWholly Owned by Other Entity
Duct BurnersYes
Nameplate Capacity37 MW
Nameplate Power Factor0.85
Summer Capacity29 MW
Winter Capacity29 MW
Minimum Load22 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateSeptember 1991
Planned RetirementDecember 2032
Combined Heat & Power Yes
Sector NameIPP CHP (3)
Topping Or BottomingB
Energy SourceNatural Gas
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load12H
Multiple FuelsNo
Cofire FuelsNo

Saguaro Power Plant Owners

Owner NameAddressGeneratorOwnership
Nightpeak Energy1111 Broadway, Oakland, CA 94607Generator CTG1100.00%
Nightpeak Energy1111 Broadway, Oakland, CA 94607Generator CTG2100.00%
Nightpeak Energy1111 Broadway, Oakland, CA 94607Generator STG100.00%

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Natural Gas.

RankPlant NamePlant LocationAnnual Generation
#717Calvert CityCalvert City, KY217.7 GWh
#718Kimberly Clark-Unit 1,2,3New Milford, CT217.4 GWh
#719International Paper Savanna MillSavannah, GA695.5 GWh
#720Cornell University Central HeatIthaca, NY216.7 GWh
#721Elgin Energy Center LLCElgin, IL216.5 GWh
#722Ingredion IncorporatedBedford Park, IL216.2 GWh
#723Charles D. Lamb Energy CenterPonca City, OK215.2 GWh
#724Marsh Run Generation FacilityRemington, VA215.4 GWh
#725TulsaTulsa, OK214.3 GWh
#726Essential Power Rock Springs LLCRising Sun, MD213.7 GWh
#728Cass CountyPlattsmouth, NE210.4 GWh
#729Milford Power LPMilford, MA210.3 GWh
#730Silver CreekPrentiss, MS210.2 GWh
#731Mead Coated BoardMahrt, AL757.7 GWh
#732El Dorado RefineryEl Dorado, KS208.3 GWh
#733University Park NorthUniversity Park, IL208.2 GWh
#734Texas PetrochemicalsHouston, TX236.3 GWh
#735A.J. Mihm Generating StationPelkie, MI207.9 GWh
#736Crossroads Energy CenterClarksdale, MS207.9 GWh
#737Hartwell Energy FacilityHartwell, GA207.1 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding Saguaro Power.

Plant NamePlant LocationAnnual GenerationDistance
Boulder Solar II, LLCBoulder City, NV125.2 GWh13.8 mi
CityCenter Central Plant Cogen UnitsLas Vegas, NV63.5 GWh10.3 mi
Clark (NVE)Las Vegas, NV795.7 GWh3.8 mi
Copper Mountain Solar 3Boulder City, NV615.4 GWh10.9 mi
Dignity - San MartinLas Vegas, NV3.7 GWh14.6 mi
Dignity - Siena CampusHenderson, NV2.9 GWh6.3 mi
IGS LAS1Henderson, NV1.0 GWh9.1 mi
Las Vegas Generating StationNorth Las Vegas, NV449.3 GWh14.5 mi
Las Vegas WPCF Solar PlantLas Vegas, NV5.8 GWh6.5 mi
Nellis Solar PV IINorth Las Vegas, NV38.6 GWh11.6 mi
River Mountains SolarHenderson, NV28.9 GWh4.7 mi
Solar Las Vegas MB 2, LLCLas Vegas, NV3.7 GWh9.7 mi
Solar Las Vegas MB-1Las Vegas, NV8.7 GWh9.8 mi
Sun Peak Generating StationLas Vegas, NV31.6 GWh6.7 mi
Techren Solar I LLCBoulder, NV200.5 GWh13.3 mi
Techren Solar II LLCBoulder, NV507.0 GWh12.4 mi
Techren Solar III LLCBoulder, NV60.5 GWh13.8 mi
Techren Solar IV LLCBoulder, NV59.5 GWh11.1 mi
Techren Solar VBoulder, NV119.2 GWh10.9 mi
Townsite Solar Project HybridBoulder City, NV448.5 GWh10.1 mi