Rush Island
100 Big Hollow Road, Festus, MO 63028Plant Summary Information
Rush Island is ranked #20 out of 120 power plants in Missouri in terms of total annual net electricity generation.
Rush Island is comprised of 2 generators and generated 191.8 GWh during the 3-month period between May 2024 to August 2024.
Plant Name | Rush Island |
---|---|
Utility Name | Union Electric Co - (MO) |
Location | Jefferson County, MO |
Initial Operation Date | March 1976 |
Last Update | Aug 2024 |
Annual Generation | 572.8 GWh |
Annual Consumption | 9.2 M MMBtu |
Ranked #1,139 out of 11,835 Power Plants Nationwide | |
Ranked #95 out of 132 Subbituminous Coal Power Plants Nationwide | |
Ranked #20 out of 120 Missouri Power Plants | |
Ranked #7 out of 9 Missouri Subbituminous Coal Power Plants | |
Fuel Types | Subbituminous Coal : 98.1% Distillate Fuel Oil : 1.9% |
Map of Rush Island
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Rush Island.
Monthly Net Generation for Rush Island
Rush Island Details
Summary Information | |
---|---|
Plant Name | Rush Island (6155) |
Plant Address | 100 Big Hollow Road, Festus, MO 63028 |
Utility | Union Electric Co - (MO) (19436) |
Latitude, Longitude | 38.13125, -90.26316 |
Generation Dates on File | Jan 2001 to Aug 2024 |
Initial Operation Date | March 1976 |
Annual Generation | 572.8 GWh |
Fuel Types | Subbituminous Coal : 98.1% Distillate Fuel Oil : 1.9% |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | SERC |
Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Mississippi River |
Ash Impoundment | Yes Not Lined Operating |
Transmission / Distribution Owner | Union Electric Co - (MO) (19436) MO |
Grid Voltage | 345.00 kV |
Energy Storage | No |
Generator 1 Details Operating March 1976
Technology | Conventional Steam Coal |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | AMMO.RUSHIS1 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | AMMO.RUSHIS1 |
Nameplate Capacity | 621 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 589 MW |
Winter Capacity | 609 MW |
Minimum Load | 275 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | March 1976 |
Planned Retirement | December 2025 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Subbituminous Coal |
Startup Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | OVER |
Pulverized Coal Technology | Yes |
Subcritical Technology | Yes |
Supercritical Technology | No |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 2 Details Operating March 1977
Technology | Conventional Steam Coal |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | AMMO.RUSHIS2 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | AMMO.RUSHIS2 |
Nameplate Capacity | 621 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 589 MW |
Winter Capacity | 609 MW |
Minimum Load | 280 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | March 1977 |
Planned Retirement | December 2025 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Subbituminous Coal |
Startup Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | OVER |
Pulverized Coal Technology | Yes |
Subcritical Technology | Yes |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Rush Island Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Subbituminous Coal.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#85 | Archer Daniels Midland Clinton | Clinton, IA | 767.5 GWh |
#86 | Wygen 2 | Gillette, WY | 663.4 GWh |
#87 | Lansing | Lansing, IA | 631.5 GWh |
#88 | Neil Simpson II | Gillette, WY | 685.7 GWh |
#89 | Sheldon | Hallam, NE | 612.1 GWh |
#90 | GREC | Chouteau, OK | 3.4 TWh |
#91 | Intermountain Power Project | Delta, UT | 4.1 TWh |
#92 | Allen S King | Oak Park Heights, MN | 562.7 GWh |
#93 | North Valmy | Valmy, NV | 1.2 TWh |
#94 | Archer Daniels Midland Cedar Rapids | Cedar Rapids, IA | 1.0 TWh |
#96 | Nearman Creek | Kansas, KS | 646.5 GWh |
#97 | Wygen 1 | Gillette, WY | 535.0 GWh |
#98 | Trenton Channel | Trenton, MI | 574.8 GWh |
#99 | Muscatine Plant #1 | Muscatine, IA | 501.7 GWh |
#100 | Lon Wright | Fremont, NE | 521.6 GWh |
#101 | Muskogee | Fort Gibson, OK | 2.6 TWh |
#102 | River Valley | Panama, OK | 541.9 GWh |
#103 | Hardin Generator Project | Hardin, MT | 435.4 GWh |
#104 | Clifty Creek | Madison, IN | 5.0 TWh |
#105 | Platte | Grand Island, NE | 361.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Rush Island.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
AES Belleville Solar LLC | Belleville, IL | 17.3 GWh | 28.1 mi |
Anheuser-Busch St Louis | St. Louis, MO | 40.4 GWh | 32.4 mi |
Baldwin Energy Complex | Baldwin, IL | 6.4 TWh | 22.8 mi |
Elm Street Substation Generators | Farmington, MO | 32.0 MWh | 25.6 mi |
Farmington Solar Farm | Farmington, MO | 2.8 GWh | 27.5 mi |
Freeburg | Freeburg, IL | 230.0 MWh | 27.8 mi |
IKEA St. Louis 410 | St. Louis, MO | 211.0 MWh | 34.8 mi |
Meramec | St. Louis, MO | 165.0 GWh | 19.1 mi |
Milam Gas Recovery | East St. Lois, IL | 19.3 GWh | 37.2 mi |
Overall Road Station | Farmington, MO | 32.0 MWh | 27.6 mi |
Prairie State Generating Station | Marissa, IL | 12.5 TWh | 33.9 mi |
Prairie State Solar Project | Swanwick Township, IL | 236.6 GWh | 37.5 mi |
Red Bud | Red Bud, IL | 123.0 MWh | 15.5 mi |
Renewable Energy Center at BJH | St Louis, MO | 1.4 GWh | 34.9 mi |
SCS American Bottoms 009885 Sauget, LLC | Sauget, IL | 3.0 GWh | 32.1 mi |
Southwestern Bell Telephone | St. Louis, MO | 47.0 MWh | 34.5 mi |
Trigen St. Louis | St Louis, MO | 80.0 GWh | 35.2 mi |
Venice | Venice, IL | 13.7 GWh | 37.1 mi |
Walton Street Substation | Farmington, MO | 12.0 MWh | 25.5 mi |
Waterloo | Waterloo, IL | 462.0 MWh | 15.2 mi |