RPUWD Scheuer Well Solar Project
23444 E 6th St, San Bernardino, CA 92408Plant Summary Information
RPUWD Scheuer Well Solar Project is ranked #415 out of 799 solar farms in California in terms of total annual net electricity generation.
RPUWD Scheuer Well Solar Project generated 762.0 MWh during the 3-month period between July 2023 to October 2023.
Plant Name | RPUWD Scheuer Well Solar Project |
---|---|
Utility Name | MN8 Energy LLC |
Location | San Bernardino County, CA |
Initial Operation Date | June 2018 |
Last Update | Oct 2023 |
Annual Generation | 4.8 GWh |
Annual Consumption | 17.9 k MMBtu |
Ranked #7,740 out of 11,835 Power Plants Nationwide | |
Ranked #2,833 out of 5,643 Solar Power Plants Nationwide | |
Ranked #1,088 out of 1,569 California Power Plants | |
Ranked #415 out of 799 California Solar Power Plants | |
Fuel Types | Solar |
Previous Operators |
Solar Star RPUWD, LLC (2017 to 2017) Good Fellow Solar 1 PH1, LLC (2018 to 2019) Goldman Sachs Renewable Power Group (2020 to 2020) Goldman Sachs Renewable Power LLC (2021 to 2021) MN8 Energy LLC (2022 to 2023) |
Map of RPUWD Scheuer Well Solar Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for RPUWD Scheuer Well Solar Project.
Monthly Net Generation for RPUWD Scheuer Well Solar Project
RPUWD Scheuer Well Solar Project Details
Summary Information | |
---|---|
Plant Name | RPUWD Scheuer Well Solar Project (61824) |
Plant Address | 23444 E 6th St, San Bernardino, CA 92408 |
Utility | MN8 Energy LLC (61944) |
Latitude, Longitude | 34.11193, -117.27326 |
Generation Dates on File | Jun 2018 to Oct 2023 |
Initial Operation Date | June 2018 |
Annual Generation | 4.8 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 18-1540 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
Grid Voltage | 12.00 kV |
Energy Storage | No |
Generator RPU2 Details Operating June 2018
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 3 MW |
Summer Capacity | 3 MW |
Winter Capacity | 3 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 2018 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Tilt Angle | 10 |
DC Net Capacity | 3.8 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
RPUWD Scheuer Well Solar Project Plant Owners
Owner Name | Address | Ownership |
---|---|---|
SunTrust Equipment Finance & Leasing Corp | 245 Peachtree Center Avenue, 17th Floor, Atlanta, GA 30303 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#2823 | CF Novel Solar CSG Gardens Eleven, LLC | Mankato, MN | 4.8 GWh |
#2824 | Spring Street Solar 1 CSG | Carver, MA | 4.8 GWh |
#2825 | SulusSolar28 | Willamina, OR | 4.8 GWh |
#2826 | East Acres Solar NG, LLC | Pittsfield, MA | 4.8 GWh |
#2827 | GSE NM1 | Dexter, NM | 4.8 GWh |
#2828 | Granville Solar PV Power Project | Oxford, NC | 4.8 GWh |
#2829 | Kenneth Solar | Warrenton, NC | 4.8 GWh |
#2830 | Kearsarge Bellingham PV | Bellingham, MA | 4.8 GWh |
#2831 | National Raisin | Fowler, CA | 4.8 GWh |
#2832 | Monroe County Sites A & B | Webster, NY | 4.8 GWh |
#2834 | Hecate Energy Upshur Rural LLC | Ore City, TX | 4.8 GWh |
#2835 | Hadley 3 Solar (North) | Hadley, MA | 4.8 GWh |
#2836 | Hadley 3 Solar (South) | Hadley, MA | 4.8 GWh |
#2837 | Montgomery Winsted CSG | Winsted, MN | 4.8 GWh |
#2838 | Greenfield Solar Park | Greenfield, IN | 4.7 GWh |
#2839 | Jackson Legler Solar 1 LLC | Jackson Township, NJ | 4.7 GWh |
#2840 | SulusSolar22 | Silverton, OR | 4.7 GWh |
#2841 | North Palm Springs 1A | Palm Springs, CA | 4.7 GWh |
#2842 | Susquehanna University Solar | Selinsgrove, PA | 4.7 GWh |
#2843 | Hickson Solar, LLC | Wallace, SC | 4.7 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding RPUWD Scheuer Well Solar Project.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Amazon San Bernardino | San Bernardino, CA | 6.0 GWh | 2.3 mi |
Cal State Univ San Bernardino FC01 | San Bernardino, CA | 7.5 GWh | 5.9 mi |
Century Generating Facility | Colton, CA | 651.0 MWh | 5.8 mi |
Colton Solar One, LLC | San Bernardino, CA | 2.3 GWh | 2.9 mi |
Drews Generating Facility | Colton, CA | 606.0 MWh | 5.8 mi |
IGS KSBD | Highland, CA | 9.0 GWh | 2.2 mi |
IGS SBD2 | San Bernardino, CA | 4.2 GWh | 2.7 mi |
Kohls San Bernardino Solar Facility | San Bernardino, CA | 1.0 GWh | 1.2 mi |
Loma Linda University Cogen | Loma Linda, CA | 52.3 GWh | 4.5 mi |
Mountainview Generating Station | Redlands, CA | 2.6 TWh | 2.8 mi |
San Manuel Central Plant Cogens | Highland, CA | 26.5 GWh | 3.7 mi |
SB Water Reclamation Fuel Cell | San Bernardino, CA | 9.5 GWh | 2.6 mi |
Solar Photovoltaic Project #05 | Redlands, CA | 1.4 GWh | 3 mi |
Solar Photovoltaic Project #07 | Redlands, CA | 2.4 GWh | 3.2 mi |
Solar Photovoltaic Project #11 | Redlands, CA | 3.1 GWh | 3.1 mi |
Solar Photovoltaic Project #13 | Redlands, CA | 2.0 GWh | 2.9 mi |
Solar Photovoltaic Project #16 | Redlands, CA | 1.5 GWh | 2.9 mi |
Solar Photovoltaic Project #22 | Redlands, CA | 329.9 MWh | 4.2 mi |
Solar Photovoltaic Project #28 | San Bernardino, CA | 1.9 GWh | 1.2 mi |
Solar Photovoltaic Project #48 | Redlands, CA | 3.5 GWh | 3.4 mi |