Roseland Solar Project, LLC
309 FM 2603, Riesel, TX 76682Plant Summary Information
Roseland Solar Project, LLC is ranked #37 out of 5,158 solar farms nationwide in terms of total annual net electricity generation.
Roseland Solar Project, LLC generated 249.7 GWh during the 3-month period between December 2023 to March 2024.
Plant Name | Roseland Solar Project, LLC |
---|---|
Utility Name | Enel Green Power Roseland Solar, LLC |
Location | Falls County, TX |
Initial Operation Date | Not Available |
Last Update | Mar 2024 |
Annual Generation | 581.0 GWh |
Annual Consumption | 2.0 M MMBtu |
Ranked #1,201 out of 11,249 Power Plants Nationwide | |
Ranked #37 out of 5,158 Solar Power Plants Nationwide | |
Ranked #220 out of 721 Texas Power Plants | |
Ranked #14 out of 151 Texas Solar Power Plants | |
Fuel Types | Solar |
Map of Roseland Solar Project, LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Roseland Solar Project, LLC.
Monthly Net Generation for Roseland Solar Project, LLC
Roseland Solar Project, LLC Details
Summary Information | |
---|---|
Plant Name | Roseland Solar Project, LLC (65028) |
Plant Address | 309 FM 2603 Riesel, TX 76682 |
Utility | Enel Green Power Roseland Solar, LLC (64438) |
Latitude, Longitude | 31.45961, -96.82436 |
Generation Dates on File | Jul 2023 to Mar 2024 |
Initial Operation Date | Not Available |
Annual Generation | 581.0 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Oncor Electric Delivery Company LLC (44372) TX |
Grid Voltage | 345.00 kV |
Energy Storage | Yes |
Roseland Solar Project, LLC Plant Owners
Owner Name | Address | Ownership |
---|---|---|
Enel Kansas, LLC | 100 Brickstone Square, Andover, MA 1810 | 100.00% |
Enel Kansas, LLC | 100 Brickstone Square, Andover, MA 1810 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#27 | Aktina Solar | El Campo, TX | 625.8 GWh |
#28 | Blythe Mesa Solar II | Blythe, CA | 604.9 GWh |
#29 | AV Solar Ranch One | Lancaster, CA | 618.2 GWh |
#30 | Galloway 1 Solar Farm | Paint Rock, TX | 611.0 GWh |
#31 | Sun Valley Solar Project | Abbott, TX | 597.6 GWh |
#32 | Bighorn Solar 1 | Pueblo, CO | 594.3 GWh |
#33 | Great Valley Solar Portfolio Holdings, LLC | Cantua Creek, CA | 593.0 GWh |
#34 | Azure Sky Solar | Haskell, TX | 586.0 GWh |
#35 | Slate Hybrid | Stratford, CA | 565.3 GWh |
#36 | Taygete Energy Project LLC | Coyanosa, TX | 589.0 GWh |
#38 | Phoebe Solar | Kermit, TX | 579.0 GWh |
#39 | Techren Solar II LLC | Boulder, NV | 574.3 GWh |
#40 | SE Athos II, LLC | Desert Center, CA | 569.3 GWh |
#41 | Dodge Flat | Reno, NV | 560.2 GWh |
#42 | Misae Solar | Childress, TX | 558.9 GWh |
#43 | Golden Field Solar III, LLC | Rosamond, CA | 556.5 GWh |
#44 | Neptune Energy Center Hybrid | Boone, CO | 537.4 GWh |
#45 | ENGIE Long Draw Solar LLC | Gail, TX | 552.8 GWh |
#46 | Pisgah Ridge Solar, LLC | Richland, TX | 542.4 GWh |
#47 | Aquamarine | Lemoore, CA | 538.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Roseland Solar Project, LLC.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Bosque County Peaking | Laquna Park, TX | 5.2 TWh | 41.8 mi |
BPL Crown Solar LLC | Chilton, TX | 44.7 GWh | 17.1 mi |
BPL Sol Solar LLC | Chilton, TX | 43.1 GWh | 17.1 mi |
Eddy II | Eddy, TX | 18.1 GWh | 28.3 mi |
Five Wells Solar Center - Hybrid | Rogers, TX | 148.1 GWh | 40.9 mi |
Griffin Solar | Robinson, TX | 11.2 GWh | 18.7 mi |
HEB00182 | Temple, TX | 267.3 MWh | 41.9 mi |
Hubbard Wind | Mt Calm, TX | 1.2 TWh | 21.8 mi |
Limestone | Jewett, TX | 6.5 TWh | 33.8 mi |
Limestone Wind Project | Coolidge, TX | 741.0 GWh | 29.6 mi |
Major Oak Power | Bremond, TX | 2.3 TWh | 26.5 mi |
Marlin Solar | Marlin, TX | 11.1 GWh | 12.3 mi |
Oak Grove (TX) | Franklin, TX | 12.1 TWh | 27.7 mi |
Panda Temple Power Station | Temple, TX | 7.9 TWh | 40.3 mi |
Pisgah Ridge Solar, LLC | Richland, TX | 542.4 GWh | 36.8 mi |
Pitts Dudik Solar | TX | 21.5 GWh | 30.1 mi |
Prairie Hill Wind Project | Mart, TX | 320.5 GWh | 7.8 mi |
Sandy Creek Energy Station | Riesel, TX | 3.7 TWh | 7.9 mi |
Sun Valley Solar Project | Abbott, TX | 597.6 GWh | 30.5 mi |
Waco Solar | Mount Calm, TX | 39.4 GWh | 17.3 mi |