Rolling Hills
1028 - 55 Ranch Road, Glenrock, WY 82637Plant Summary Information
Rolling Hills is ranked #33 out of 69 power plants in Wyoming in terms of total annual net electricity generation.
Rolling Hills generated 48.1 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Rolling Hills |
---|---|
Utility Name | PacifiCorp |
Location | Converse County, WY |
Initial Operation Date | January 2009 |
Last Update | Dec 2023 |
Annual Generation | 187.8 GWh |
Annual Consumption | 761.8 k MMBtu |
Ranked #2,403 out of 11,866 Power Plants Nationwide | |
Ranked #729 out of 1,345 Wind Power Plants Nationwide | |
Ranked #33 out of 69 Wyoming Power Plants | |
Ranked #18 out of 27 Wyoming Wind Power Plants | |
Fuel Types | Wind |
Map of Rolling Hills
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Rolling Hills.
Monthly Net Generation for Rolling Hills
Rolling Hills Details
Summary Information | |
---|---|
Plant Name | Rolling Hills (56842) |
Plant Address | 1028 - 55 Ranch Road, Glenrock, WY 82637 |
Utility | PacifiCorp (14354) |
Latitude, Longitude | 43.0572, -105.8543 |
Generation Dates on File | Jan 2009 to Dec 2023 |
Initial Operation Date | January 2009 |
Annual Generation | 187.8 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | WECC |
Balancing Authority | PacifiCorp - East (PACE) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | PacifiCorp (14354) WY |
Grid Voltage | 230.00 kV |
Energy Storage | No |
Generator 1 Details Operating January 2009
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
Nameplate Capacity | 115.8 MW |
Summer Capacity | 99 MW |
Winter Capacity | 99 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | January 2009 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Wind |
Solid Fuel Gasification | No |
Turbines/Hydrokinetic Buoys | 66 |
Multiple Fuels | No |
Turbine Details | |
Number Of Turbines | 66 |
---|---|
Predominant Turbine Manufacturer | GE |
Predominant Turbine Model Number | 1.85-87 |
Design Wind Speed | 19 MPH |
Wind Quality Class | 2 - Medium Wind |
Turbine Hub Height Feet | 262 |
Rolling Hills Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#719 | Golden Spread Panhandle Wnd Rch | Wilderado, TX | 192.5 GWh |
#720 | Windstar 1 | Tehachapi, CA | 192.5 GWh |
#721 | Shooting Star | Mullinville, KS | 192.4 GWh |
#722 | Jeffers Wind 20 LLC | Jeffers, MN | 192.0 GWh |
#723 | Wheat Field Wind Power Project | Arlington, OR | 190.8 GWh |
#724 | Pebble Springs Wind LLC | Wasco, OR | 190.5 GWh |
#725 | Spring Canyon Expansion Wind Energy Ctr | Peetz, CO | 189.2 GWh |
#726 | Pinyon Pine II | Mojave, CA | 188.9 GWh |
#727 | Alexander Wind Farm LLC | Alexander, KS | 188.2 GWh |
#728 | Dempsey Ridge Wind Farm | Cheyenne, OK | 187.8 GWh |
#730 | Locust Ridge II LLC | Shenandoah, PA | 187.8 GWh |
#731 | Wilton Wind II LLC | Wilton, ND | 187.0 GWh |
#732 | Alta Wind VIII | Mojave, CA | 186.4 GWh |
#733 | Silver Star I Wind Power Project | Dublin, TX | 186.1 GWh |
#734 | Cohocton Wind Project | Cohocton, NY | 185.4 GWh |
#735 | Pinnacle Wind Force LLC | Keyser, WV | 185.1 GWh |
#736 | Granite Reliable Power | Dummer, NH | 184.1 GWh |
#737 | High Sheldon Wind Farm | Strykersville, NY | 184.0 GWh |
#738 | Peak View Wind Farm | Walsenburg, CO | 183.4 GWh |
#739 | Beebe 1A | Ithaca, MI | 182.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Rolling Hills.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Alcova | Alcova, WY | 68.1 GWh | 56.1 mi |
Barber Creek | Gillette, WY | 359.0 MWh | 46.1 mi |
Campbell Hill Windpower | Glenrock, WY | 283.5 GWh | 7.9 mi |
Casper Wind Farm | Evansville, WY | 5.7 GWh | 22.1 mi |
Cedar Springs I | Douglas, WY | 772.3 GWh | 19.5 mi |
Cedar Springs II | Douglas, WY | 593.8 GWh | 25.4 mi |
Cedar Springs III | Douglas, WY | 544.4 GWh | 13.7 mi |
Dave Johnston | Glen Rock, WY | 3.7 TWh | 15.7 mi |
Dunlap | Medicine Bow, WY | 432.0 GWh | 71.7 mi |
Ekola Flats | Hanna, WY | 740.4 GWh | 81.8 mi |
Fremont Canyon | Alcova, WY | 176.3 GWh | 62.4 mi |
Glendo | Glendo, WY | 80.6 GWh | 61.2 mi |
Glenrock | Glenrock, WY | 314.1 GWh | 2.9 mi |
Guernsey | Guernsey, WY | 21.1 GWh | 76.8 mi |
Hartzog | Wright, WY | 318.0 MWh | 55.7 mi |
Kortes | Sinclair, WY | 146.2 GWh | 80.3 mi |
Laramie River Station | Wheatland, WY | 6.9 TWh | 82.1 mi |
Pioneer Wind Park, LLC | Glenrock, WY | 226.3 GWh | 22.7 mi |
TB Flats | Medicine Bow, WY | 1.4 TWh | 63.8 mi |
Top of the World Windpower Project | Glenrock, WY | 282.6 GWh | 9.7 mi |