Rolling Hills Generating
43111 State Rt 160, Wilkesville, OH 45695Plant Summary Information
Rolling Hills Generating is ranked #20 out of 183 power plants in Ohio in terms of total annual net electricity generation.
Rolling Hills Generating is comprised of 5 generators and generated 576.4 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Rolling Hills Generating |
---|---|
Utility Name | Rolling Hills Generating LLC |
Location | Vinton County, OH |
Initial Operation Date | June 2003 |
Last Update | Dec 2023 |
Annual Generation | 2.3 TWh |
Annual Consumption | 27.8 M MMBtu |
Ranked #483 out of 11,852 Power Plants Nationwide | |
Ranked #297 out of 2,254 Natural Gas Power Plants Nationwide | |
Ranked #20 out of 183 Ohio Power Plants | |
Ranked #13 out of 54 Ohio Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Map of Rolling Hills Generating
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Rolling Hills Generating.
Monthly Net Generation for Rolling Hills Generating
Rolling Hills Generating Details
Summary Information | |
---|---|
Plant Name | Rolling Hills Generating (55401) |
Plant Address | 43111 State Rt 160, Wilkesville, OH 45695 |
Utility | Rolling Hills Generating LLC (56558) |
Latitude, Longitude | 39.0839, -82.3328 |
Generation Dates on File | Aug 2003 to Dec 2023 |
Initial Operation Date | June 2003 |
Annual Generation | 2.3 TWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | 02-38-000 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | RFC |
Balancing Authority | PJM Interconnection, LLC (PJM) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | Municipality |
Ash Impoundment | No |
Transmission / Distribution Owner | Ohio Power Co (14006) OH |
Grid Voltage | 765.00 kV |
Energy Storage | No |
Natural Gas Information | |
Pipeline Name | TEXAS EASTERN TRANSMISSION LP |
Natural Gas Storage | No |
Generator CT1 Details Operating June 2003
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | FLATLICK 1 - 32418627 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | FLATLICK 1 - 32418627 |
Nameplate Capacity | 195.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 185 MW |
Winter Capacity | 209 MW |
Minimum Load | 126 MW |
Uprate/Derate Completed | Yes |
Uprate Or Derate Completed | May 2023 |
Status | Operating |
---|---|
First Operation Date | June 2003 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Other Planned Modifications | No |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator CT2 Details Operating June 2003
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | FLATLICK 2 - 32418629 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | FLATLICK 2 - 32418629 |
Nameplate Capacity | 195.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 185 MW |
Winter Capacity | 209 MW |
Minimum Load | 126 MW |
Uprate/Derate Completed | Yes |
Uprate Or Derate Completed | May 2023 |
Status | Operating |
---|---|
First Operation Date | June 2003 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Other Planned Modifications | No |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator CT3 Details Operating June 2003
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | FLATLICK 3 - 32418631 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | FLATLICK 3 - 32418631 |
Nameplate Capacity | 195.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 185 MW |
Winter Capacity | 209 MW |
Minimum Load | 126 MW |
Uprate/Derate Completed | Yes |
Uprate Or Derate Completed | May 2023 |
Status | Operating |
---|---|
First Operation Date | June 2003 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Other Planned Modifications | No |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator CT4 Details Operating June 2003
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | FLATLICK 4 - 32418633 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | FLATLICK 4 - 32418633 |
Nameplate Capacity | 195.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 185 MW |
Winter Capacity | 209 MW |
Minimum Load | 126 MW |
Uprate/Derate Completed | Yes |
Uprate Or Derate Completed | May 2023 |
Status | Operating |
---|---|
First Operation Date | June 2003 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Other Planned Modifications | No |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator CT5 Details Operating June 2003
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | FLATLICK 5 - 32418635 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | FLATLICK 5 - 32418635 |
Nameplate Capacity | 195.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 185 MW |
Winter Capacity | 209 MW |
Minimum Load | 126 MW |
Uprate/Derate Completed | Yes |
Uprate Or Derate Completed | May 2023 |
Status | Operating |
---|---|
First Operation Date | June 2003 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Other Planned Modifications | No |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Rolling Hills Generating Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#287 | Pleasants Energy LLC | St Mary's, WV | 2.4 TWh |
#288 | Coyote Springs II | Boardman, OR | 2.3 TWh |
#289 | Apex Generating Station | Las Vegas, NV | 2.3 TWh |
#290 | Bergen Generating Station | Ridgefield, NJ | 2.3 TWh |
#291 | Dogwood Energy Facility | Pleasant Hill, MO | 2.3 TWh |
#292 | Elk Hills Power LLC | Tupman, CA | 2.3 TWh |
#293 | Quail Run Energy Center | Odessa, TX | 2.3 TWh |
#294 | Ingleside Cogeneration | Houston, TX | 2.3 TWh |
#295 | Possum Point | Dumfries, VA | 2.3 TWh |
#296 | Muskogee | Fort Gibson, OK | 2.7 TWh |
#298 | Chesterfield | Chester, VA | 2.3 TWh |
#299 | RS Cogen | Lake Charles, LA | 2.3 TWh |
#300 | Jones | Lubbock, TX | 2.3 TWh |
#301 | James E. Rogers Energy Complex | Cliffside, NC | 5.6 TWh |
#302 | Yates | Newnan, GA | 2.2 TWh |
#303 | Gila River Power Block 4 | Gila Bend, AZ | 2.2 TWh |
#304 | Front Range Power Plant | Fountain, CO | 2.2 TWh |
#305 | Lewis Creek | Willis, TX | 2.2 TWh |
#306 | Goldendale Generating Station | Goldendale, WA | 2.2 TWh |
#307 | Mustang Station | Denver City, TX | 2.2 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Rolling Hills Generating.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Belleville Dam | Belleville, WV | 272.2 GWh | 32 mi |
Big Sandy Peaker Plant | Kenona, WV | 325.0 GWh | 53 mi |
Ceredo Generating Station | Huntington, WV | 327.3 GWh | 50.6 mi |
Gavin Power, LLC | Cheshire, OH | 12.0 TWh | 15.6 mi |
Green Valley LFGTE | Ashland, KY | 16.9 GWh | 54 mi |
Greenup Hydro | Franklin Furnace, OH | 262.2 GWh | 41.4 mi |
Hanging Rock Energy Facility | Ironton, OH | 9.6 TWh | 42.8 mi |
Haverhill North Cogeneration Facility | Franklin Furnace, OH | 353.4 GWh | 43 mi |
John E Amos | St Albans, WV | 9.1 TWh | 50.3 mi |
Kyger Creek | Cheshire, OH | 4.7 TWh | 16 mi |
Mountaineer | New Haven, WV | 5.6 TWh | 22.6 mi |
Pixelle Specialty Solutions LLC - Chillicothe Facility | Chillicothe, OH | 207.8 GWh | 38.1 mi |
Pleasants Energy LLC | St Mary's, WV | 2.4 TWh | 54.6 mi |
Racine | Racine, OH | 215.3 GWh | 25.6 mi |
Salt City Solar Project - Hybrid | Circleville, OH | 100.1 GWh | 40.7 mi |
Suburban Landfill Gas Recovery | Glenford, OH | 30.5 GWh | 57.4 mi |
Washington Energy Facility | Beverly, OH | 5.1 TWh | 49.8 mi |
Waterford Power, LLC | Waterford, OH | 6.6 TWh | 45.2 mi |
Winfield | Winfield, WV | 110.5 GWh | 44.6 mi |
Yellowbud Solar, LLC | Williamsport, OH | 501.3 GWh | 48.7 mi |