Rocky Reach
Rocky Reach Dam, Wenatchee, WA 98801Plant Summary Information
Rocky Reach is ranked #7 out of 1,371 hydroelectric power plants nationwide in terms of total annual net electricity generation.
Rocky Reach is comprised of 11 generators and generated 1.3 TWh during the 3-month period between June 2024 to September 2024.
Plant Name | Rocky Reach |
---|---|
Utility Name | PUD No 1 of Chelan County |
Location | Chelan County, WA |
Initial Operation Date | June 1961 |
Last Update | Sep 2024 |
Annual Generation | 4.8 TWh |
Annual Consumption | 17.2 M MMBtu |
Ranked #227 out of 11,852 Power Plants Nationwide | |
Ranked #7 out of 1,371 Water Power Plants Nationwide | |
Ranked #4 out of 134 Washington Power Plants | |
Ranked #3 out of 70 Washington Water Power Plants | |
Fuel Types | Water |
Map of Rocky Reach
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Rocky Reach.
Monthly Net Generation for Rocky Reach
Rocky Reach Details
Summary Information | |
---|---|
Plant Name | Rocky Reach (3883) |
Plant Address | Rocky Reach Dam, Wenatchee, WA 98801 |
Utility | PUD No 1 of Chelan County (3413) |
Latitude, Longitude | 47.53361, -120.29528 |
Generation Dates on File | Jan 2001 to Sep 2024 |
Initial Operation Date | June 1961 |
Annual Generation | 4.8 TWh |
Fuel Types | Water |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | WECC |
Balancing Authority | Public Utility District No. 1 of Chelan County (CHPD) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Columbia River |
Ash Impoundment | No |
Transmission / Distribution Owner | PUD No 1 of Chelan County (3413) WA |
Grid Voltage | 230.00 kV / 115.00 kV |
Energy Storage | No |
Generator C-1 Details Operating June 1961
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 114 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 104.9 MW |
Winter Capacity | 104.9 MW |
Minimum Load | 35 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 1961 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Generator C-2 Details Operating June 1961
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 114 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 104.9 MW |
Winter Capacity | 104.9 MW |
Minimum Load | 35 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 1961 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Generator C-3 Details Operating June 1961
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 114 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 104.9 MW |
Winter Capacity | 104.9 MW |
Minimum Load | 35 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 1961 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Generator C-4 Details Operating August 1961
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 114 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 104.9 MW |
Winter Capacity | 104.9 MW |
Minimum Load | 35 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | August 1961 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Generator C-5 Details Operating August 1961
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 114 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 104.9 MW |
Winter Capacity | 104.9 MW |
Minimum Load | 35 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | August 1961 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Generator C-6 Details Operating August 1961
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 114 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 104.9 MW |
Winter Capacity | 104.9 MW |
Minimum Load | 35 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | August 1961 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Generator C-7 Details Operating September 1961
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 114 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 104.9 MW |
Winter Capacity | 104.9 MW |
Minimum Load | 35 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | September 1961 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Generator C-9 Details Operating November 1973
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 125.4 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 129.9 MW |
Winter Capacity | 129.9 MW |
Minimum Load | 50 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | November 1973 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Generator C-8 Details Operating August 1973
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 125.4 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 129.9 MW |
Winter Capacity | 129.9 MW |
Minimum Load | 40 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | August 1973 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Generator C-10 Details Out of Service January 1974
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 125.4 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 129.9 MW |
Winter Capacity | 129.9 MW |
Minimum Load | 35 MW |
Uprate/Derate Completed | No |
Status | Out of Service |
First Operation Date | January 1974 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | Yes |
Other Modifications | April 2025 |
Multiple Fuels | No |
Generator C-11 Details OA February 1974
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 125.4 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 129.9 MW |
Winter Capacity | 129.9 MW |
Minimum Load | 35 MW |
Uprate/Derate Completed | No |
Status | OA |
First Operation Date | February 1974 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | Yes |
Other Modifications | December 2024 |
Multiple Fuels | No |
Rocky Reach Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Water.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1 | Robert Moses Niagara | Lewiston, NY | 15.8 TWh |
#2 | Grand Coulee | Grand Coulee, WA | 15.0 TWh |
#3 | Chief Joseph | Bridgeport, WA | 9.0 TWh |
#4 | Robert Moses Power Dam | Massena, NY | 7.5 TWh |
#5 | John Day | Rufus, OR | 6.9 TWh |
#6 | The Dalles | The Dalles, OR | 5.4 TWh |
#8 | Wanapum | Beverly, WA | 4.0 TWh |
#9 | Priest Rapids | Mattawa, WA | 3.8 TWh |
#10 | McNary | Umatilla, OR | 3.6 TWh |
#11 | Bonneville | Cascade Locks, OR | 3.5 TWh |
#12 | Wells | Pateros, WA | 3.4 TWh |
#13 | Boundary | Metaline, WA | 3.1 TWh |
#14 | Glen Canyon Dam | Page, AZ | 2.8 TWh |
#15 | Edward C Hyatt | Oroville, CA | 2.4 TWh |
#16 | Shasta | Redding, CA | 2.4 TWh |
#17 | Wilson Dam | Muscle Shoals, AL | 2.2 TWh |
#18 | Garrison | Riverside, ND | 2.1 TWh |
#19 | Brownlee | Cambridge, ID | 2.1 TWh |
#20 | Oahe | Pierre, SD | 2.1 TWh |
#21 | Conowingo | Darlington, MD | 2.0 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Rocky Reach.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Camas Solar Project | Ellensburg, WA | 10.3 GWh | 40.9 mi |
Chelan | Wenatchee, WA | 305.8 GWh | 24.6 mi |
Chief Joseph | Bridgeport, WA | 9.0 TWh | 44.1 mi |
Cowiche | Tieton, WA | 3.4 GWh | 61.7 mi |
Main Canal Headworks | Coulee City, WA | 118.7 GWh | 46.8 mi |
PEC Headworks | Moses Lake, WA | 18.7 GWh | 31.9 mi |
Penstemon Solar Project | Ellensburg, WA | 10.4 GWh | 40.9 mi |
Priest Rapids | Mattawa, WA | 3.8 TWh | 64 mi |
Quincy Chute | Quincy, WA | 33.8 GWh | 61.8 mi |
Rock Island | Wenatchee, WA | 2.0 TWh | 16.1 mi |
Roza | Yakima, WA | 54.5 GWh | 63.8 mi |
Sagebrush Power Partners | Ellensburg, WA | 255.0 GWh | 33.1 mi |
Summer Falls Power Plant | Coulee City, WA | 447.2 GWh | 46.9 mi |
Swauk Wind LLC | Thorp, WA | 6.0 GWh | 34.7 mi |
Urtica Solar Project | Ellensburg, WA | 11.4 GWh | 34.8 mi |
Vantage Wind Energy LLC | Ellensburg, WA | 231.6 GWh | 40.4 mi |
Wanapum | Beverly, WA | 4.0 TWh | 48.1 mi |
Weeks Falls | North Bend, WA | 8.8 GWh | 63.6 mi |
Wells | Pateros, WA | 3.4 TWh | 34.9 mi |
Wild Horse | Ellensburg, WA | 589.0 GWh | 34.6 mi |