Rockingham County CT Station

240 Ernest Drive, Reidsville, NC 27320

Plant Summary Information

Rockingham County CT Station is ranked #16 out of 864 power plants in North Carolina in terms of total annual net electricity generation.

Rockingham County CT Station is comprised of 5 generators and generated 265.3 GWh during the 3-month period between October 2024 to January 2025.

Plant NameRockingham County CT Station
Utility NameDuke Energy Carolinas, LLC
LocationRockingham County, NC
Initial Operation DateJune 2000
Last Update Jan 2025
Annual Generation 1.5 TWh
Annual Consumption 17.3 M MMBtu
Ranked #593 out of 11,979 Power Plants Nationwide
Ranked #376 out of 2,255 Natural Gas Power Plants Nationwide
Ranked #16 out of 864 North Carolina Power Plants
Ranked #12 out of 30 North Carolina Natural Gas Power Plants
Fuel Types Natural Gas : 98.1% Distillate Fuel Oil : 1.9%

Map of Rockingham County CT Station

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Rockingham County CT Station.

Create Your Account Today

Monthly Net Generation for Rockingham County CT Station

Rockingham County CT Station Details

Summary Information
Plant NameRockingham County CT Station (55116)
Plant Address240 Ernest Drive, Reidsville, NC 27320
UtilityDuke Energy Carolinas, LLC (5416)
Latitude, Longitude36.3297, -79.8297
Generation Dates on FileJan 2001 to Jan 2025
Initial Operation DateJune 2000
Annual Generation 1.5 TWh
Fuel Types Natural Gas : 98.1% Distillate Fuel Oil : 1.9%
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusNo
FERC Exempt Wholesale Generator StatusYes
FERC Exempt Wholesale Generator Docket Number99-16-000
Regulatory Information
Regulatory StatusRegulated
NERC RegionSERC
Balancing AuthorityDuke Energy Carolinas (DUK)
NAICS CodeUtilities (22)
Sector Electric Utility (1)
Water Source
Ash Impoundment No
Transmission / Distribution OwnerDuke Energy Carolinas, LLC (5416) NC
Grid Voltage 230.00 kV
Energy StorageNo
 
Natural Gas Information
Local Distribution Company (LDC)PIEDMONT NATURAL GAS
Natural Gas StorageNo
Liquefied Natural Gas StorageNo

Generator CT1 Details Standby June 2000

TechnologyNatural Gas Fired Combustion Turbine
Prime MoverCombustion Turbine
OwnershipSingle Owner
Nameplate Capacity195.5 MW
Nameplate Power Factor0.85
Summer Capacity165 MW
Winter Capacity179 MW
Minimum Load130 MW
Uprate/Derate Completed No
StatusStandby
Synchronized To Transmission GridYes
First Operation DateJune 2000
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceNatural Gas / Distillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsYes
Cofire FuelsNo
Switch Between Oil And Natural GasYes
Multifuel Details
Switch When OperatingYes
Net Summer Capacity With Natural Gas165 MW
Net Winter Capacity With Natural Gas179 MW
Net Summer Capacity With Oil165 MW
Net Winter Capacity With Oil179 MW
Time To Switch From Gas To Oil1H
Time To Switch From Oil To Gas1H
Factors That Limit SwitchingYes
Storage LimitsYes
Air Permit LimitsYes

Generator CT2 Details Standby June 2000

TechnologyNatural Gas Fired Combustion Turbine
Prime MoverCombustion Turbine
OwnershipSingle Owner
Nameplate Capacity195.5 MW
Nameplate Power Factor0.85
Summer Capacity165 MW
Winter Capacity179 MW
Minimum Load130 MW
Uprate/Derate Completed No
StatusStandby
Synchronized To Transmission GridYes
First Operation DateJune 2000
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceNatural Gas / Distillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsYes
Cofire FuelsNo
Switch Between Oil And Natural GasYes
Multifuel Details
Switch When OperatingYes
Net Summer Capacity With Natural Gas165 MW
Net Winter Capacity With Natural Gas179 MW
Net Summer Capacity With Oil165 MW
Net Winter Capacity With Oil179 MW
Time To Switch From Gas To Oil1H
Time To Switch From Oil To Gas1H
Factors That Limit SwitchingYes
Storage LimitsYes
Air Permit LimitsYes

Generator CT3 Details Standby June 2000

TechnologyNatural Gas Fired Combustion Turbine
Prime MoverCombustion Turbine
OwnershipSingle Owner
Nameplate Capacity195.5 MW
Nameplate Power Factor0.85
Summer Capacity165 MW
Winter Capacity179 MW
Minimum Load130 MW
Uprate/Derate Completed No
StatusStandby
Synchronized To Transmission GridYes
First Operation DateJune 2000
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceNatural Gas / Distillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsYes
Cofire FuelsNo
Switch Between Oil And Natural GasYes
Multifuel Details
Switch When OperatingYes
Net Summer Capacity With Natural Gas165 MW
Net Winter Capacity With Natural Gas179 MW
Net Summer Capacity With Oil165 MW
Net Winter Capacity With Oil179 MW
Time To Switch From Gas To Oil1H
Time To Switch From Oil To Gas1H
Factors That Limit SwitchingYes
Storage LimitsYes
Air Permit LimitsYes

Generator CT4 Details Standby June 2000

TechnologyNatural Gas Fired Combustion Turbine
Prime MoverCombustion Turbine
OwnershipSingle Owner
Nameplate Capacity195.5 MW
Nameplate Power Factor0.85
Summer Capacity165 MW
Winter Capacity179 MW
Minimum Load130 MW
Uprate/Derate Completed No
StatusStandby
Synchronized To Transmission GridYes
First Operation DateJune 2000
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceNatural Gas / Distillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsYes
Cofire FuelsNo
Switch Between Oil And Natural GasYes
Multifuel Details
Switch When OperatingYes
Net Summer Capacity With Natural Gas165 MW
Net Winter Capacity With Natural Gas179 MW
Net Summer Capacity With Oil165 MW
Net Winter Capacity With Oil179 MW
Time To Switch From Gas To Oil1H
Time To Switch From Oil To Gas1H
Factors That Limit SwitchingYes
Storage LimitsYes
Air Permit LimitsYes

Generator CT5 Details Standby June 2000

TechnologyNatural Gas Fired Combustion Turbine
Prime MoverCombustion Turbine
OwnershipSingle Owner
Nameplate Capacity195.5 MW
Nameplate Power Factor0.85
Summer Capacity165 MW
Winter Capacity179 MW
Minimum Load130 MW
Uprate/Derate Completed No
StatusStandby
Synchronized To Transmission GridYes
First Operation DateJune 2000
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceNatural Gas / Distillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsYes
Cofire FuelsNo
Switch Between Oil And Natural GasYes
Multifuel Details
Switch When OperatingYes
Net Summer Capacity With Natural Gas165 MW
Net Winter Capacity With Natural Gas179 MW
Net Summer Capacity With Oil165 MW
Net Winter Capacity With Oil179 MW
Time To Switch From Gas To Oil1H
Time To Switch From Oil To Gas1H
Factors That Limit SwitchingYes
Storage LimitsYes
Air Permit LimitsYes

Rockingham County CT Station Plant Owners

Owner NameAddressGeneratorOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Natural Gas.

RankPlant NamePlant LocationAnnual Generation
#366Greene CountyDemopolis, AL1.6 TWh
#367Kendall Square StationCambridge, MA1.6 TWh
#368Sutter Energy CenterYuba City, CA1.5 TWh
#369LaO Energy SystemsPlaquemine, LA1.8 TWh
#370E C GastonWilsonville, AL3.6 TWh
#371Magnolia Power ProjectBurbank, CA1.5 TWh
#372Bowline PointWest Haverstraw, NY1.5 TWh
#373Walnut Energy CenterTurlock, CA1.5 TWh
#374Pioneer Generation StationWilliston, ND1.5 TWh
#375Westlake PlaqueminePlaquemine, LA1.5 TWh
#377Emporia Energy CenterEmporia, KS1.5 TWh
#378Arthur Kill Generating StationStaten Island, NY1.5 TWh
#379Motiva Enterprises Port Arthur RefineryPort Arthur, TX1.6 TWh
#380Anadarko PlantAnadarko, OK1.5 TWh
#381Ennis Power Company LLCEnnis, TX1.4 TWh
#382Russell City Energy CenterHayward, CA1.4 TWh
#383Tenaska Gateway Generating StationMt. Enterprise, TX1.4 TWh
#384S O PurdomSt Marks, FL1.4 TWh
#385EdwardsportEdwardsport, IN2.9 TWh
#386Santa Rosa Energy CenterPace, FL1.4 TWh

Nearby Power Plants

Below are closest 20 power plants surrounding Rockingham County CT Station.

Plant NamePlant LocationAnnual GenerationDistance
Avalon HydropowerMayodan, NC3.9 GWh9.4 mi
Belews CreekBelews Creek, NC9.6 TWh13.3 mi
Big BoyGibsonville, NC4.7 GWh20.6 mi
Carol Jean SolarWalnut Cove, NC7.1 GWh17.5 mi
Dan RiverEden, NC4.7 TWh12.4 mi
DE Solar 657 Brigham RdGreensboro, NC810.0 MWh17.3 mi
Dibrell FarmPelham, NC9.2 GWh19.4 mi
Edison FarmEden, NC4.1 GWh14.6 mi
Husky SolarReidsville, NC8.4 GWh15 mi
Jacob SolarReidsville, NC8.6 GWh11.9 mi
Lick Creek Solar, LLCWalnut Cove, NC109.6 GWh16.9 mi
LotusElon, NC6.8 GWh21 mi
Manning PV 1Elon, NC9.2 GWh22.5 mi
Market FarmReidsville, NC8.5 GWh11 mi
Moore SolarReidsville, NC8.6 GWh19.8 mi
Moore Solar FarmReidsville, NC7.9 GWh5.5 mi
Moyer SolarStoneville, NC8.8 GWh7.6 mi
Salem Energy Systems LLCWinston-Salem, NC25.9 GWh21.9 mi
Waste Management Piedmont LFGTE ProjectKernersville, NC10.0 GWh15 mi
White Street RenewablesGreensboro, NC14.1 GWh16.6 mi