Rock Island
Rock Island Dam, Wenatchee, WA 98801Plant Summary Information
Rock Island is ranked #22 out of 1,371 hydroelectric power plants nationwide in terms of total annual net electricity generation.
Rock Island is comprised of 19 generators and generated 498.4 GWh during the 3-month period between June 2024 to September 2024.
Plant Name | Rock Island |
---|---|
Utility Name | PUD No 1 of Chelan County |
Location | Chelan County, WA |
Initial Operation Date | October 1931 |
Last Update | Sep 2024 |
Annual Generation | 2.0 TWh |
Annual Consumption | 7.2 M MMBtu |
Ranked #523 out of 11,852 Power Plants Nationwide | |
Ranked #22 out of 1,371 Water Power Plants Nationwide | |
Ranked #14 out of 134 Washington Power Plants | |
Ranked #8 out of 70 Washington Water Power Plants | |
Fuel Types | Water |
Map of Rock Island
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Rock Island.
Monthly Net Generation for Rock Island
Rock Island Details
Summary Information | |
---|---|
Plant Name | Rock Island (6200) |
Plant Address | Rock Island Dam, Wenatchee, WA 98801 |
Utility | PUD No 1 of Chelan County (3413) |
Latitude, Longitude | 47.34611, -120.0917 |
Generation Dates on File | Jan 2001 to Sep 2024 |
Initial Operation Date | October 1931 |
Annual Generation | 2.0 TWh |
Fuel Types | Water |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | WECC |
Balancing Authority | Public Utility District No. 1 of Chelan County (CHPD) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Columbia River |
Ash Impoundment | No |
Transmission / Distribution Owner | PUD No 1 of Chelan County (3413) WA |
Grid Voltage | 115.00 kV |
Energy Storage | No |
Generator A Details Operating October 1931
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 1.2 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.2 MW |
Winter Capacity | 1.2 MW |
Minimum Load | 0.2 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | October 1931 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Generator B-2 Details Out of Service October 1931
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 20.7 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 15 MW |
Winter Capacity | 15 MW |
Minimum Load | 10 MW |
Uprate/Derate Completed | No |
Status | Out of Service |
First Operation Date | October 1931 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | Yes |
Other Modifications | December 2025 |
Multiple Fuels | No |
Generator B-1 Details Out of Service November 1931
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 20.7 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 15 MW |
Winter Capacity | 15 MW |
Minimum Load | 10 MW |
Uprate/Derate Completed | No |
Status | Out of Service |
First Operation Date | November 1931 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | Yes |
Other Modifications | April 2027 |
Multiple Fuels | No |
Generator B-4 Details Operating October 1932
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 20.7 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 15 MW |
Winter Capacity | 15 MW |
Minimum Load | 10 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | October 1932 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Generator B-3 Details OA December 1932
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 20.7 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 15 MW |
Winter Capacity | 15 MW |
Minimum Load | 10 MW |
Uprate/Derate Completed | No |
Status | OA |
First Operation Date | December 1932 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | Yes |
Other Modifications | June 2024 |
Multiple Fuels | No |
Generator B-6 Details OA October 1952
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 22.5 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 17 MW |
Winter Capacity | 17 MW |
Minimum Load | 10 MW |
Uprate/Derate Completed | No |
Status | OA |
First Operation Date | October 1952 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | Yes |
Other Modifications | February 2024 |
Multiple Fuels | No |
Generator B-7 Details Operating November 1952
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 22.5 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 17 MW |
Winter Capacity | 17 MW |
Minimum Load | 10 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | November 1952 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Generator B-5 Details Operating September 1952
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 22.5 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 17 MW |
Winter Capacity | 17 MW |
Minimum Load | 10 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | September 1952 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Generator B-8 Details Operating January 1953
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 22.5 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 17 MW |
Winter Capacity | 17 MW |
Minimum Load | 10 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | January 1953 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | Yes |
Other Modifications | January 2027 |
Multiple Fuels | No |
Generator B-9 Details Operating March 1953
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 22.5 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 19 MW |
Winter Capacity | 19 MW |
Minimum Load | 10 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | March 1953 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | Yes |
Other Modifications | January 2025 |
Multiple Fuels | No |
Generator B-10 Details Operating April 1953
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 22.5 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 19 MW |
Winter Capacity | 19 MW |
Minimum Load | 10 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | April 1953 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Generator U-6 Details Operating October 1978
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 51.3 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 42 MW |
Winter Capacity | 42 MW |
Minimum Load | 10 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | October 1978 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | Yes |
Other Modifications | August 2029 |
Multiple Fuels | No |
Generator U-5 Details OA December 1978
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 51.3 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 42 MW |
Winter Capacity | 42 MW |
Minimum Load | 10 MW |
Uprate/Derate Completed | No |
Status | OA |
First Operation Date | December 1978 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | Yes |
Other Modifications | October 2024 |
Multiple Fuels | No |
Generator U-8 Details Operating July 1978
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 51.3 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 42 MW |
Winter Capacity | 42 MW |
Minimum Load | 10 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | July 1978 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | Yes |
Other Modifications | September 2028 |
Multiple Fuels | No |
Generator U-7 Details Operating August 1978
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 51.3 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 42 MW |
Winter Capacity | 42 MW |
Minimum Load | 10 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | August 1978 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | Yes |
Other Modifications | December 2025 |
Multiple Fuels | No |
Generator U-4 Details Operating February 1979
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 51.3 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 42 MW |
Winter Capacity | 42 MW |
Minimum Load | 10 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | February 1979 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | Yes |
Other Modifications | October 2027 |
Multiple Fuels | No |
Generator U-3 Details Operating April 1979
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 51.3 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 42 MW |
Winter Capacity | 42 MW |
Minimum Load | 10 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | April 1979 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | Yes |
Other Modifications | November 2026 |
Multiple Fuels | No |
Generator U-2 Details Operating June 1979
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 51.3 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 42 MW |
Winter Capacity | 42 MW |
Minimum Load | 10 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 1979 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | Yes |
Other Modifications | August 2030 |
Multiple Fuels | No |
Generator U-1 Details Operating August 1979
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 51.3 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 42 MW |
Winter Capacity | 42 MW |
Minimum Load | 10 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | August 1979 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | Yes |
Other Modifications | June 2031 |
Multiple Fuels | No |
Rock Island Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Water.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#12 | Wells | Pateros, WA | 3.4 TWh |
#13 | Boundary | Metaline, WA | 3.1 TWh |
#14 | Glen Canyon Dam | Page, AZ | 2.8 TWh |
#15 | Edward C Hyatt | Oroville, CA | 2.4 TWh |
#16 | Shasta | Redding, CA | 2.4 TWh |
#17 | Wilson Dam | Muscle Shoals, AL | 2.2 TWh |
#18 | Garrison | Riverside, ND | 2.1 TWh |
#19 | Brownlee | Cambridge, ID | 2.1 TWh |
#20 | Oahe | Pierre, SD | 2.1 TWh |
#21 | Conowingo | Darlington, MD | 2.0 TWh |
#23 | Hells Canyon | Oxbow, OR | 1.8 TWh |
#24 | Libby | Libby, MT | 1.6 TWh |
#25 | Hoover Dam (AZ) | Boulder City, AZ | 1.5 TWh |
#26 | Little Goose | Dayton, WA | 1.5 TWh |
#27 | Fort Randall | Pickstown, SD | 1.5 TWh |
#28 | Dworshak | Ahsahka, ID | 1.4 TWh |
#29 | Hoover Dam (NV) | Boulder City, NV | 1.4 TWh |
#30 | Ice Harbor | Burbank, WA | 1.4 TWh |
#31 | Lower Monumental | Kahlotus, WA | 1.3 TWh |
#32 | Noxon Rapids | Noxon, MT | 1.3 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Rock Island.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Camas Solar Project | Ellensburg, WA | 10.3 GWh | 33.1 mi |
Chelan | Wenatchee, WA | 305.8 GWh | 34 mi |
Chief Joseph | Bridgeport, WA | 9.0 TWh | 49.5 mi |
Cowiche | Tieton, WA | 3.4 GWh | 54.4 mi |
Main Canal Headworks | Coulee City, WA | 118.7 GWh | 41.5 mi |
Orchard Avenue 1 | Yakima, WA | 2.6 GWh | 58.7 mi |
PEC Headworks | Moses Lake, WA | 18.7 GWh | 15.8 mi |
Penstemon Solar Project | Ellensburg, WA | 10.4 GWh | 33.1 mi |
Priest Rapids | Mattawa, WA | 3.8 TWh | 49.2 mi |
Quincy Chute | Quincy, WA | 33.8 GWh | 46.5 mi |
Rocky Reach | Wenatchee, WA | 4.8 TWh | 16.1 mi |
Roza | Yakima, WA | 54.5 GWh | 53.5 mi |
Sagebrush Power Partners | Ellensburg, WA | 255.0 GWh | 31.5 mi |
Summer Falls Power Plant | Coulee City, WA | 447.2 GWh | 38.9 mi |
Swauk Wind LLC | Thorp, WA | 6.0 GWh | 34.2 mi |
Urtica Solar Project | Ellensburg, WA | 11.4 GWh | 32.5 mi |
Vantage Wind Energy LLC | Ellensburg, WA | 231.6 GWh | 27.4 mi |
Wanapum | Beverly, WA | 4.0 TWh | 33.2 mi |
Wells | Pateros, WA | 3.4 TWh | 42.8 mi |
Wild Horse | Ellensburg, WA | 589.0 GWh | 22.1 mi |