Robert S Kerr
29759 Powerhouse Rd, Keota, OK 74955Plant Summary Information
Robert S Kerr is ranked #1 out of 10 hydroelectric power plants in Oklahoma in terms of total annual net electricity generation.
Robert S Kerr is comprised of 4 generators and generated 48.7 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Robert S Kerr |
---|---|
Utility Name | USCE-Tulsa District |
Location | Sequoyah County, OK |
Initial Operation Date | July 1971 |
Last Update | Dec 2023 |
Annual Generation | 309.2 GWh |
Annual Consumption | 1.1 M MMBtu |
Ranked #1,814 out of 11,852 Power Plants Nationwide | |
Ranked #152 out of 1,371 Water Power Plants Nationwide | |
Ranked #74 out of 126 Oklahoma Power Plants | |
Ranked #1 out of 10 Oklahoma Water Power Plants | |
Fuel Types | Water |
Map of Robert S Kerr
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Robert S Kerr.
Monthly Net Generation for Robert S Kerr
Robert S Kerr Details
Summary Information | |
---|---|
Plant Name | Robert S Kerr (2985) |
Plant Address | 29759 Powerhouse Rd, Keota, OK 74955 |
Utility | USCE-Tulsa District (27470) |
Latitude, Longitude | 35.34447, -94.7755 |
Generation Dates on File | Jan 2001 to Dec 2023 |
Initial Operation Date | July 1971 |
Annual Generation | 309.2 GWh |
Fuel Types | Water |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | MRO |
Balancing Authority | Southwestern Power Administration (SPA) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Arkansas River |
Ash Impoundment | No |
Transmission / Distribution Owner | Southwestern Power Administration (17716) |
Grid Voltage | 161.00 kV |
Energy Storage | No |
Generator 1 Details Operating October 1971
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 27.5 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 28 MW |
Winter Capacity | 28 MW |
Minimum Load | 10 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | October 1971 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Planned Net Summer Capacity Uprate | 6 MW |
Planned Net Winter Capacity Uprate | 6 MW |
Planned Uprate | December 2025 |
Generator 4 Details Operating November 1971
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 27.5 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 20 MW |
Winter Capacity | 20 MW |
Minimum Load | 10 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | November 1971 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Planned Net Summer Capacity Uprate | 14 MW |
Planned Net Winter Capacity Uprate | 14 MW |
Planned Uprate | December 2025 |
Generator 2 Details Operating July 1971
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 27.5 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 26 MW |
Winter Capacity | 26 MW |
Minimum Load | 10 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | July 1971 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Planned Net Summer Capacity Uprate | 8 MW |
Planned Net Winter Capacity Uprate | 8 MW |
Planned Uprate | December 2025 |
Generator 3 Details Out of Service September 1971
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 27.5 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 31.6 MW |
Winter Capacity | 31.6 MW |
Minimum Load | 10 MW |
Uprate/Derate Completed | No |
Status | Out of Service |
First Operation Date | September 1971 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Planned Net Summer Capacity Uprate | 6 MW |
Planned Net Winter Capacity Uprate | 6 MW |
Planned Uprate | December 2025 |
Robert S Kerr Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Water.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#142 | Belden | Belden, CA | 332.6 GWh |
#143 | Lucky Peak Power Plant Project | Boise, ID | 331.8 GWh |
#144 | S C Moore | Littleton, NH | 327.6 GWh |
#145 | Martin Dam | Dadeville, AL | 326.6 GWh |
#146 | Spring Creek | Redding, CA | 321.7 GWh |
#147 | Walters | Waterville, NC | 321.0 GWh |
#148 | Richard B Russell | Elberton, GA | 318.4 GWh |
#149 | Gaston | Roanoke Rapids, NC | 318.0 GWh |
#150 | Millers Ferry | Camden, AL | 315.3 GWh |
#151 | Pit 4 | Big Bend, CA | 311.4 GWh |
#153 | Center Hill | Lancaster, TN | 308.1 GWh |
#154 | Chelan | Wenatchee, WA | 305.8 GWh |
#155 | Bellows Falls | Bellow Falls, VT | 304.5 GWh |
#156 | Snettisham | Juneau, AK | 302.1 GWh |
#157 | Cherokee Dam | Rudledge, TN | 301.3 GWh |
#158 | H M Jackson | Sultan, WA | 298.0 GWh |
#159 | Big Creek 2 | Auberry, CA | 296.2 GWh |
#160 | Bliss | Bliss, ID | 295.1 GWh |
#161 | Morony | Great Falls, MT | 295.0 GWh |
#162 | Norris Dam | Norris, TN | 294.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Robert S Kerr.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Branch Solar Farm | Branch, AR | 9.9 GWh | 48 mi |
City of Paris Solar | Paris, AR | 2.8 GWh | 58.8 mi |
Elkins Generating Center | Elkins, AR | 25.2 GWh | 61.4 mi |
Ellis Hydro | Van Buren, AR | 123.8 GWh | 27.1 mi |
Eufaula Dam | Porum, OK | 216.1 GWh | 32.9 mi |
Flint Creek | Gentry, AR | 2.1 TWh | 64.5 mi |
Fort Gibson | Fort Gibson, OK | 140.4 GWh | 44.2 mi |
Georgia-Pacific Muskogee | Muskogee, OK | 374.1 GWh | 39.6 mi |
Harry D Mattison Gas Plant | Tontitown, AR | 180.5 GWh | 64.3 mi |
Muskogee | Fort Gibson, OK | 2.7 TWh | 40.7 mi |
Noland Wastewater Treatment Plant Hybrid | Fayetteville, AR | 8.8 GWh | 64.6 mi |
Ozark | Ozark, AR | 253.1 GWh | 54.6 mi |
River Valley | Panama, OK | 536.6 GWh | 12.8 mi |
Tenkiller Ferry | Gore, OK | 136.1 GWh | 23.2 mi |
Thomas Fitzhugh | Ozark, AR | 404.5 GWh | 55.3 mi |
UA Central Utility Plant | Fayetteville, AR | 37.5 GWh | 60.3 mi |
Waste Management Eco Vista LFGTE | Springdale, AR | 6.9 GWh | 62.2 mi |
Webbers Falls | Webbers Falls, OK | 127.2 GWh | 26.5 mi |
Westside Wastewater Treatment Plant Hybrid | Fayetteville, AR | 9.0 GWh | 59.9 mi |
Wildhorse Mountain Wind Facility | Clayton, OK | 430.1 GWh | 57.1 mi |