Robert Moses Power Dam
830 Barnhart Island, Massena, NY 13662Plant Summary Information
Robert Moses Power Dam is ranked #4 out of 1,371 hydroelectric power plants nationwide in terms of total annual net electricity generation.
Robert Moses Power Dam is comprised of 16 generators and generated 2.0 TWh during the 3-month period between May 2024 to August 2024.
Plant Name | Robert Moses Power Dam |
---|---|
Utility Name | New York Power Authority |
Location | St. Lawrence County, NY |
Initial Operation Date | July 1958 |
Last Update | Aug 2024 |
Annual Generation | 7.5 TWh |
Annual Consumption | 28.1 M MMBtu |
Ranked #109 out of 11,835 Power Plants Nationwide | |
Ranked #4 out of 1,371 Water Power Plants Nationwide | |
Ranked #3 out of 832 New York Power Plants | |
Ranked #2 out of 160 New York Water Power Plants | |
Fuel Types | Water |
Map of Robert Moses Power Dam
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Robert Moses Power Dam.
Monthly Net Generation for Robert Moses Power Dam
Robert Moses Power Dam Details
Summary Information | |
---|---|
Plant Name | Robert Moses Power Dam (2694) |
Plant Address | 830 Barnhart Island, Massena, NY 13662 |
Utility | New York Power Authority (15296) |
Latitude, Longitude | 45.0038, -74.7994 |
Generation Dates on File | Jan 2001 to Aug 2024 |
Initial Operation Date | July 1958 |
Annual Generation | 7.5 TWh |
Fuel Types | Water |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | NPCC |
Balancing Authority | New York Independent System Operator (NYIS) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | St Lawrence River |
Ash Impoundment | No |
Transmission / Distribution Owner | New York Power Authority (15296) |
Grid Voltage | 230.00 kV |
Energy Storage | No |
Generator 26 Details OA October 1958
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 57 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 53.5 MW |
Winter Capacity | 53.5 MW |
Minimum Load | 1 MW |
Uprate/Derate Completed | No |
Status | OA |
---|---|
First Operation Date | October 1958 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Generator 25 Details Operating November 1958
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 57 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 53.5 MW |
Winter Capacity | 53.5 MW |
Minimum Load | 1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | November 1958 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Generator 24 Details Operating December 1958
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 57 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 53.5 MW |
Winter Capacity | 53.5 MW |
Minimum Load | 1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 1958 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Generator 29 Details Operating July 1958
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 57 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 53.5 MW |
Winter Capacity | 53.5 MW |
Minimum Load | 1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | July 1958 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Generator 30 Details Operating July 1958
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 57 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 53.5 MW |
Winter Capacity | 53.5 MW |
Minimum Load | 1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | July 1958 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Generator 31 Details Operating July 1958
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 57 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 53.5 MW |
Winter Capacity | 53.5 MW |
Minimum Load | 1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | July 1958 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Generator 32 Details Operating July 1958
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 57 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 53.5 MW |
Winter Capacity | 53.5 MW |
Minimum Load | 1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | July 1958 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Generator 27 Details Operating August 1958
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 57 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 53.5 MW |
Winter Capacity | 53.5 MW |
Minimum Load | 1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | August 1958 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Generator 28 Details Operating August 1958
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 57 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 53.5 MW |
Winter Capacity | 53.5 MW |
Minimum Load | 1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | August 1958 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Generator 23 Details Operating January 1959
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 57 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 53.5 MW |
Winter Capacity | 53.5 MW |
Minimum Load | 1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 1959 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Generator 22 Details Operating March 1959
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 57 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 53.5 MW |
Winter Capacity | 53.5 MW |
Minimum Load | 1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | March 1959 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Generator 20 Details Operating May 1959
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 57 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 53.5 MW |
Winter Capacity | 53.5 MW |
Minimum Load | 1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | May 1959 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Generator 21 Details Operating May 1959
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 57 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 53.5 MW |
Winter Capacity | 53.5 MW |
Minimum Load | 1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | May 1959 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Generator 19 Details Operating June 1959
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 57 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 53.5 MW |
Winter Capacity | 53.5 MW |
Minimum Load | 1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 1959 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Generator 17 Details Operating July 1959
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 57 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 53.5 MW |
Winter Capacity | 53.5 MW |
Minimum Load | 1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | July 1959 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Generator 18 Details Operating July 1959
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 57 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 53.5 MW |
Winter Capacity | 53.5 MW |
Minimum Load | 1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | July 1959 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Robert Moses Power Dam Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Water.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1 | Robert Moses Niagara | Lewiston, NY | 15.8 TWh |
#2 | Grand Coulee | Grand Coulee, WA | 15.0 TWh |
#3 | Chief Joseph | Bridgeport, WA | 8.9 TWh |
#5 | John Day | Rufus, OR | 6.9 TWh |
#6 | The Dalles | The Dalles, OR | 5.4 TWh |
#7 | Rocky Reach | Wenatchee, WA | 4.8 TWh |
#8 | Wanapum | Beverly, WA | 3.9 TWh |
#9 | Priest Rapids | Mattawa, WA | 3.7 TWh |
#10 | McNary | Umatilla, OR | 3.6 TWh |
#11 | Bonneville | Cascade Locks, OR | 3.5 TWh |
#12 | Wells | Pateros, WA | 3.4 TWh |
#13 | Boundary | Metaline, WA | 3.1 TWh |
#14 | Glen Canyon Dam | Page, AZ | 2.8 TWh |
#15 | Shasta | Redding, CA | 2.4 TWh |
#16 | Edward C Hyatt | Oroville, CA | 2.4 TWh |
#17 | Wilson Dam | Muscle Shoals, AL | 2.2 TWh |
#18 | Garrison | Riverside, ND | 2.1 TWh |
#19 | Conowingo | Darlington, MD | 2.1 TWh |
#20 | Brownlee | Cambridge, ID | 2.1 TWh |
#21 | Oahe | Pierre, SD | 2.1 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Robert Moses Power Dam.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Allens Falls | Parishville, NY | 32.0 GWh | 23.9 mi |
Clarkson Solar | Potsdam, NY | 1.7 GWh | 24.1 mi |
Colton | Pierrepont, NY | 171.8 GWh | 30 mi |
East Norfolk | Norfolk, NY | 26.7 GWh | 16.8 mi |
Franklin Solar Site | Malone, NY | 2.0 GWh | 25.9 mi |
Hannawa | Pierrepont, NY | 53.9 GWh | 27.9 mi |
Hewittville Hydroelectric | Norwood, NY | 13.2 GWh | 23 mi |
Macomb | Malone, NY | 7.3 GWh | 25.7 mi |
Malone Solar Site | Malone, NY | 1.4 GWh | 25.8 mi |
Massena Energy Facility | Massena, NY | 21.9 GWh | 5.9 mi |
Norfolk | Norfolk, NY | 31.6 GWh | 16.8 mi |
Norwood | Norwood, NY | 13.6 GWh | 20.6 mi |
NY Lancaster Shisler Rd Site 2 Solar CSG | Lancaster, NY | 466.0 MWh | 23.9 mi |
OYA State Route 122 | Constable, NY | 7.8 GWh | 26.7 mi |
Parishville | Parishville, NY | 16.6 GWh | 25.9 mi |
Raymondville | Norfolk, NY | 14.3 GWh | 14.6 mi |
Sissonville Hydro | Potsdam, NY | 15.7 GWh | 24.1 mi |
Sugar Island | Potsdam, NY | 29.7 GWh | 26.4 mi |
Unionville Hydro Project 2499 NY | Norwood, NY | 14.9 GWh | 22.2 mi |
Yaleville | Norfolk, NY | 3.7 GWh | 19.1 mi |