Roadrunner, LLC Hybrid
4209 FM 2463, McCamey, TX 79752Plant Summary Information
Roadrunner, LLC Hybrid is ranked #3 out of 5,643 solar farms nationwide in terms of total annual net electricity generation.
Roadrunner, LLC Hybrid generated 336.7 GWh during the 3-month period between May 2024 to August 2024.
Plant Name | Roadrunner, LLC Hybrid |
---|---|
Utility Name | Roadrunner Solar, LLC |
Location | Upton County, TX |
Initial Operation Date | August 2020 |
Last Update | Aug 2024 |
Annual Generation | 990.1 GWh |
Annual Consumption | 3.8 M MMBtu |
Ranked #742 out of 11,835 Power Plants Nationwide | |
Ranked #3 out of 5,643 Solar Power Plants Nationwide | |
Ranked #119 out of 749 Texas Power Plants | |
Ranked #1 out of 161 Texas Solar Power Plants | |
Fuel Types | Solar |
Map of Roadrunner, LLC Hybrid
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Roadrunner, LLC Hybrid.
Monthly Net Generation for Roadrunner, LLC Hybrid
Roadrunner, LLC Hybrid Details
Summary Information | |
---|---|
Plant Name | Roadrunner, LLC Hybrid (62561) |
Plant Address | 4209 FM 2463, McCamey, TX 79752 |
Utility | Roadrunner Solar, LLC (62047) |
Latitude, Longitude | 31.21944, -102.19222 |
Generation Dates on File | Jan 2020 to Aug 2024 |
Initial Operation Date | August 2020 |
Annual Generation | 990.1 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | City of Garland - (TX) (6958) TX |
Grid Voltage | 345.00 kV |
Energy Storage | Yes |
Generator RODR1 Details Operating August 2020
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 200 MW |
Summer Capacity | 200 MW |
Winter Capacity | 200 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | August 2020 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Time From Cold Shutdown To Full Load | 1H |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Fixed Tilt | No |
Bifacial | Yes |
Azimuth Angle | 90 |
Tilt Angle | 90 |
DC Net Capacity | 248.5 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Generator RODR2 Details Operating August 2020
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 200 MW |
Summer Capacity | 200 MW |
Winter Capacity | 200 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | August 2020 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Time From Cold Shutdown To Full Load | 1H |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Fixed Tilt | No |
Bifacial | Yes |
Azimuth Angle | 90 |
Tilt Angle | 90 |
DC Net Capacity | 248.5 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Generator BA Details Operating July 2023
Technology | Batteries |
---|---|
Prime Mover | Battery |
Ownership | Single Owner |
Nameplate Capacity | 50 MW |
Summer Capacity | 50 MW |
Winter Capacity | 50 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | July 2023 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Electricity used for energy storage |
Time From Cold Shutdown To Full Load | 10M |
Energy Storage Details | |
Nameplate Energy Capacity MWH | 108.6 |
---|---|
Maximum Charge Rate | 50 MW |
Maximum Discharge Rate | 50 MW |
Storage Technology | LIB |
Nameplate Reactive Power Rating | 81 |
Storage Enclosure Type | CS |
Arbitrage | P |
Frequency Regulation | Yes |
Voltage Or Reactive Power Support | Yes |
Direct Support Of Another Unit | No |
Support T D Asset | No |
Roadrunner, LLC Hybrid Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1 | Topaz Solar Farm | Santa Margarita, CA | 1.1 TWh |
#2 | Gemini Solar | Unincorporated, NV | 1.0 TWh |
#4 | Sonoran Solar Energy | Buckeye, AZ | 881.3 GWh |
#5 | Eagle Shadow Mountain Solar Farm | Moapa River Indian Re, NV | 908.6 GWh |
#6 | 2W Permian Solar Project Hybrid | Andrews, TX | 902.8 GWh |
#7 | Roseland Solar Project, LLC | Riesel, TX | 875.9 GWh |
#8 | Solar Star 1 | Rosamond, CA | 868.6 GWh |
#9 | Daggett 3 | Daggett, CA | 842.2 GWh |
#10 | Aktina Solar | El Campo, TX | 844.6 GWh |
#11 | Solana Generating Station | Gila Bend, AZ | 805.4 GWh |
#12 | Juno Solar Project | Lamesa, TX | 795.1 GWh |
#13 | Prospero Solar | Andrews, TX | 746.0 GWh |
#14 | Neptune Energy Center Hybrid | Boone, CO | 707.3 GWh |
#15 | Solar Star 2 | Rosamond, CA | 701.3 GWh |
#16 | IP Radian, LLC | Brookesmith, TX | 687.2 GWh |
#17 | Copper Mountain Solar 5, LLC | Boulder City, NV | 685.2 GWh |
#18 | Slate Hybrid | Stratford, CA | 656.4 GWh |
#19 | Prospero Solar II | Andrews, TX | 675.9 GWh |
#20 | Agua Caliente Solar Project | Dateland, AZ | 674.0 GWh |
#21 | Desert Sunlight 300, LLC | Desert Center, CA | 659.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Roadrunner, LLC Hybrid.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Alamo 6 | Fort Stockton, TX | 238.9 GWh | 16.3 mi |
Appaloosa Run Wind | Rankin, TX | 708.3 GWh | 21.7 mi |
Castle Gap Solar Hybrid | McCarney, TX | 385.9 GWh | 5.3 mi |
CED Crane Solar | Crane, TX | 405.5 GWh | 7.5 mi |
Desert Sky | Iraan, TX | 462.3 GWh | 21.8 mi |
East Pecos Solar | McCamey, TX | 259.2 GWh | 16 mi |
Emerald Grove | Crane, TX | 281.6 GWh | 13.2 mi |
Greasewood Solar | Fort Stockton, TX | 165.2 GWh | 21.8 mi |
High Lonesome Wind Power, LLC Hybrid | Rankin, TX | 1.3 TWh | 18.7 mi |
King Mountain Wind Ranch 1 | McCamey, TX | 561.3 GWh | 3 mi |
Midway Solar - TX | Fort Stockton, TX | 302.3 GWh | 15.6 mi |
NWP Indian Mesa Wind Farm | Iraan, TX | 197.8 GWh | 19.9 mi |
Pearl Solar | Fort Stockton, TX | 99.6 GWh | 16.6 mi |
Pioneer Hutt Wind Energy | Midland, TX | 371.4 GWh | 43.4 mi |
RE Maplewood | McCamey, TX | 491.6 GWh | 17.2 mi |
Shamrock Wind | TBD, TX | 603.2 GWh | 39.8 mi |
Sherbino II | Ft. Stockton, TX | 533.6 GWh | 36 mi |
Upton County Solar | McCamey, TX | 287.4 GWh | 6 mi |
Woodward Mountain I | Girvin, TX | 175.7 GWh | 22.7 mi |
Woodward Mountain II | Girvin, TX | 168.8 GWh | 22.7 mi |